IRR:
الاستثمارات:
إعادة تعيين المرشحات

عن الصناعة

المشاريع 2

Organization of production of slab glued products from natural veneer (ID 14.12)

22% $1,3M استثمار

Creation of pallet blanks production (ID 14.11)

35% $0,7M استثمار

Creation of the mud resort “Pokrovskoye” (ID 13.1)

NPV
IRR
РВР
15 % 60 months

الهدف من المشروع

The development of 124,000 m2 area to create the Pokrovskoye mud resort.

وصف موجز وفكرة

The development involves the construction of medical rehabilitation centers equipped with modern balneological equipment. Construction of infrastructure for living, entertainment, sports. Tourist routes - walking, cycling, horseback riding. Thematic museums - the museum of the writer Vasily Pavlovich Aksenov, the museum “History of Sapozhkovsky Muds”. The basis of rehabilitation is rare Sapozhkovsky medicinal acidic mud.

دعم البنية التحتية:

Full compliance to the needs of the project.
The need for energy resources (electricity, natural gas, drinking water) is provided with sufficient capacity.

فترة التنفيذ

60 months

الحاجة إلى تمويل إضافي

$2B

مكان البيع

Ryazan oblast

التكلفة الإجمالية للمشروع

$2B

Construction of a greenhouse complex (ID 12.32)

NPV
IRR
РВР
- 8,11% 92 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes the construction of a greenhouse complex with the area of 5 hectares. The aim of the project is to create the production of greenhouse vegetables (cucumbers, tomatoes) on a mineral substrate in year-round greenhouses with the use of additional illumination system on the territory of Oryol region.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$24M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$24M

Construction of a plant for precision alloys production (ID 12.31)

NPV
IRR
РВР
- 10,6% 29 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Organization of the production of bars made of precision alloys in small batches with a quality exceeding domestic and world analogues in the city of Mtsensk.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$0,2M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$0,2M

Construction of a mill (ID 12.30)

NPV
IRR
РВР
- 19,2% 54 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Сonstruction of a mill grinding 2 types of grain with productivity of 150 tons per day

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5,8M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$5,8M

Construction of a potato storage facility (ID 12.29)

NPV
IRR
РВР
- 19,2% 54 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The object is a building for potatoes storage. Technology of potatoes storage "APH Group" (Netherlands) is based on Omnivent ventilation equipment (Netherlands) and Munters air humidification system (Sweden). All components of the vegetables storage process are compurterized and automated. The APH Group company is a provider of technological equipment and carries out its installation and comissioning works (turnkeys). The maximum one-time volume of stored products is 8,100 tons.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$2M

Construction of a plant for the production of glass products (ID 12.28)

NPV
IRR
РВР
- 35% 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes construction of a plant for the production of glass products on the territory of the special economic zone Oryol.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$75M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$75M

Organization of cold-pressed sunflower, rapeseed and soybean oils production (ID 12.27)

NPV
IRR
РВР
- 19,2% 53 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a modern factory for the production of vegetable oils (sunflower, soybean, rapeseed).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$6,1M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$6,1M

Construction of a Data centre (ID 12.26)

NPV
IRR
РВР
- 8,11% 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes construction of a Data centre (Data Processing Centre - DPC). It is created with the purpose of processing and storing of huge amounts of information. The project is implemented taking into account the requirements towards data backup, stability and security of storage and processing of data.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$10M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$10M

Electronics production (ID 12.25)

NPV
IRR
РВР
- 37% 32 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes production of consumer electronics and engineering networks. Production line consists of: a line for the production of printed circuit assemblies, a line for washing and varnishing, a selective soldering oven, a vapor-phase oven with a vacuum.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$101,7M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$101,7M

Organization of block-containers and switchboard equipment production (ID 12.24)

NPV
IRR
РВР
- 73,4% 38 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes creation of block-containers and switchboard equipment production with the highest possible level of factory readiness, with mounted technological equipment and engineering systems.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$0,25M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$0,25M

Reconstruction of the Hotel Intourist-Yelets (ID 9.6)

NPV
IRR
РВР
- - -

الهدف من المشروع

Modernization

وصف موجز وفكرة

The project assumes reconstruction of the Hotel Intourist-Yelets:
year of construction - 1988, number of rooms - 136, territory of the hotel - 6042 square meters

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,3M

مكان البيع

Lipetsk Oblast

التكلفة الإجمالية للمشروع

$13,3M

Agro-industrial complex for the production of goat milk and dairy products (ID 9.5)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of an agro-industrial complex for the production of goat milk and dairy products in Lipetsk region

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5,8M

مكان البيع

Lipetsk Oblast

التكلفة الإجمالية للمشروع

$5,8M

Construction of a vegetable and fruit chips plant (ID 1.26)

NPV
IRR
РВР
$0,6M 21,53% 87,9 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of vegetable and fruit chips with a production capacity of 40 tons per year.

دعم البنية التحتية:

1. Power, MW: source 1 - substation 35/10 kW "Kochetovka", power supply using a temporary scheme - 630 kW, ТУ №5-199/20284964 from 19.12.2013
2. Water, m3/h: possible by drilling of wells. To provide 125 m3/h it is necessary to drill 6 water wells with the capacity of 25 m3/h each (5 working and 1 reserve)
3. Gas, m3/h: source - gas distribution station Malye Mayachki (P 0,6 mPa), underground gas pipline; free peak load - 2000-6700 m3/h; gas pipeline with the maximum hourly consumption 6600 m3/h, ТУ №7566 from 29.11.2013
4. Federal highway: asphalt road next to the site

فترة التنفيذ

8 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,7M

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$1,7M

Construction of a ready-made frozen pasta factory (ID 1.25)

NPV
IRR
РВР
$0,7M 19,8% 59 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes construction of a complex for the production of ready-made frozen pasta with a maximum production capacity of 1,200 tons per month in the village Belovskoe in Belgorod region. Planned commissioning date is March, 2023. Creation of 29 working places with an average salary of 33,4 thousand rubles. Manufacture is planned to be located on the territory of land plot with the cadastral number 31:15:0904001:3793, address: Belgorod region, village Belovskoe, Magistralnaya street, № 16в. In the production of pasta only natural, environmentally friendly ingredients will be used - flour, eggs, spices and water. There is no need to use any preservatives, flavourings and colorants - the production and storage technology allows to save mineral-vitamin complex for 2 years.
Import substitution. Manufactured product is not a novelty, in addition to the fact that it has a large and established sales market in Europe, Russian customers are familiar with it as this product has been imported to Russia for more that 3 years.
Development of the food industry in Belgorod region with the launch of a product that has no Russian analogue on the market. The company plans to concentrate sales in the following segments: HoReCa - 50%, municipal institutions (hospitals, schools, pre-school institutions etc.) - 20%, catering companies - 30%.

دعم البنية التحتية:

1. Power, MW: 1 MW
2. Water, m3/month: 400 m3/month
3. Sewage, m3/month: 400 m3/month
4. Gas, m3/h: 60 m3/h

فترة التنفيذ

14 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,9M

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$13,9M

Construction of a knitwear fabric (ID 16.6)

NPV
IRR
РВР
- 21% 92 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation and development of a modern textile enterprise. The project assumes construction of a knitwear factory, purchase of equipment.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$266,7M

مكان البيع

Tver Oblast

التكلفة الإجمالية للمشروع

$266,7M

Construction of a modern dairy complex (ID 5.12)

NPV
IRR
РВР
$42,7M 33% 168 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a modern highly efficient dairy complex with automated processes of manufacture management, with a full processing cycle starting from receiving of raw milk to the shipment of finished product, corresponding to all requirements of technical regulations of the Customs Union, current technological regulatory legal acts, State Standards, Sanitary-epidemiological rules and norms, food and dairy product safety programs and sanitary requirements for the design of dairy industry enterprises.
Finished product at the initial stage - dry milk skimmed by the technology low-heat and butter. In the future - production of whole and fermented milk products - drinking milk, drinking cream, baked milk, fermented baked milk, sour cream, ice cream.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$35M

مكان البيع

Ivanovo Oblast

التكلفة الإجمالية للمشروع

$35M

Creation of microcalcite production (ID 14.18)

NPV
IRR
РВР
$6,7M 55% 35 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of modern production of microcalcite from calcium carbonate for the needs of enterprises of Russian Federation engaged in the production of plastics, polymers, paints and varnishes, linoleum, cable plastic, rubber products, sealants and drilling fluids

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$5M

Manufacture of prosthetic and orthopedic products (ID 14.17)

NPV
IRR
РВР
$30,8M 23% 82 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Production of endoprostheses of the knee and hip joints with the potential of 30-40% of imported goods substitution

فترة التنفيذ

20 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$28,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$28,3M

Creation of a transport and logistics complex (ID 14.16)

NPV
IRR
РВР
$24,2M 29% 70 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a transport and logistics complex for 3,000-4,000 vehicles with arrangement of parking and storage places for transport, construction of warehouses and of a training and educational complex for employees

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$21,7M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$21,7M

Creation of a high-tech coworking with IT specialization (ID 14.15)

NPV
IRR
РВР
$1,8M 23% 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Organization of an activity center for IT specialists (a single platform for collaborative work, an "idea generation" center) with the purpose of retaining existing and attracting new qualified personnel for IT companies in Smolensk region, with the option of buying out the cultural center "Youth" (city of Smolensk) for placement of specialists

فترة التنفيذ

7 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,6M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$1,6M

Costruction of a flax plant (ID 14.14)

NPV
IRR
РВР
$56,7M 23% 86 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a flax factory including a factory processing flax straw and a yarn factory. The factory will become a part of a flax cluster. The new production will be aimed at creating high quality competitive products with a focus on import substitution and export. Long and cottonized flax fiber, the most in demand on the market, will be used as a raw material for the production of yarn.

فترة التنفيذ

25 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$52,5M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$52,5M

Construction of a factory for cultivating and processing of champignons (ID 14.13)

NPV
IRR
РВР
$19M 14% 90 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

It is planned to build a factory for cultivating and processing of champignons on the territory of the state industrial park "Phoenix"

فترة التنفيذ

90 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$15,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$15,3M

Organization of production of slab glued products from natural veneer (ID 14.12)

NPV
IRR
РВР
$2,5M 22% 78 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of an enterprise specializing in deep processing of raw materials - wood for the manufacture of products in demand on the territory of the state industrial park "Phoenix"

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$1,3M

Creation of pallet blanks production (ID 14.11)

NPV
IRR
РВР
$1,7M 35% 25 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Organization of manufacture specializing in deep processing of wood and the sale of manufactured products for export in order to make profit

فترة التنفيذ

6 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$0,7M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$0,7M

Construction of a complex for receiving, cleaning, drying and shipping of grain crops (ID 14.10)

NPV
IRR
РВР
$2,7M 29% 56 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

In the result of the project will be constructed a high-tech complex for receiving, cleaning, drying and shipping of grain crops. The complex will allow simultaneous storage of 4 types of crops which, in turn, will allow to sell products at the most optimal prices in different time periods

فترة التنفيذ

9 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2,4M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$2,4M

Creation of a recreation complex “Olshansky quarries” (ID 14.9)

NPV
IRR
РВР
$9M 19% 97 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of an all-season recreation complex for residents, tourists and autotourists of Smolensk region and adjacent regions on the territory with a total area of more than 14 hectares, located near Olshansky quarries

فترة التنفيذ

13 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$4,6M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$4,6M

Creation of livestock complex for 1200 dairy cows (ID 14.8)

NPV
IRR
РВР
$17,5M 19% 49 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a modern high-tech dairy complex for 1200 dairy cows within the available fund of agricultural land in Smolensk region

فترة التنفيذ

11 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$14,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$14,3M

Construction of a gas generating complex for the production of medical oxygen (ID 14.7)

NPV
IRR
РВР
$14,3M 23% 59 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a full-cycle enterprise for the production of liquid medical oxygen (with the possibility of subsequent gasification) on the territory of the state industrial park "Safonovo"

فترة التنفيذ

10 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$9,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$9,3M

Construction of a gas silicate blocks plant (ID 14.6)

NPV
IRR
РВР
$24,2M 29% 70 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of autoclaved cellular concrete blocks (gas silicate blocks) on the territory of the state industrial park "Safonovo"

دعم البنية التحتية:

1. Power, MW: 495 m3/h. Off-site high-pressure gas pipeline networks
2. Water, m3/day: 685 m3/day
3. Sewage, m3/day: 685 m3/day
4. Storm and domestic sewage

فترة التنفيذ

28 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$48,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$48,3M

Organization of lignin processing production (ID 7.4)

NPV
IRR
РВР
$0,4M 29,4% 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction in Kostroma region of a plant for processing of hydrolytic lignin dumps in the amount of 1.4 million tons

دعم البنية التحتية:

1. Power, MW: FSK networks: substation 500 kW "Zvezda" 220/110/10, power reserve - 240 MW. MRSK networks: substation 110/10 kW, power reserve - 24 MW
2. Water, m3/h: depends on technical conditions. Distance from connection point - 100 m
3. Sewage, m3/h: depends on technical conditions. Distance from tie-in point - 100 m
4. Gas, m3/h: absent. Construction of a gas pipeline and gas outlet "Galich - Manturovo - Sharya". Planned data - 2023
5. Availability of a railway line: privately owned in close proximity
6. Federal highway: 2 km from the federal highway P-243 "Kostroma - Sharya - Kirov - Perm"

فترة التنفيذ

16 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,9M

مكان البيع

Kostroma Oblast

التكلفة الإجمالية للمشروع

$1,9M

Construction of a vegetable storage (ID 7.3)

NPV
IRR
РВР
$0,3M 11,86% 94,8 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction in Kostroma region of a vegetable storage corresponding to the modern standards, for storage and year-round supply of products to consumers

فترة التنفيذ

8 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$95M

مكان البيع

Kostroma Oblast

التكلفة الإجمالية للمشروع

$95M

Creation of a corrugated cardboard manufactury (ID 2.8)

NPV
IRR
РВР
$1,9M 11% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes construction of a plant for the manufacture of paper for corrugation and cardboard for flat layers

دعم البنية التحتية:

1. Power, MW: 1,44 MW. There is a possibility of connection. Current power reserve - 1,44 MVA (substation Surazh).
2. Gas, m3/h: 4800 m3/h. There is a possiiblity of connection. Gas throughput - 4 800 m3/h (gas distribution station Surazh).

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$21,2M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$21,2M

Construction of a carbamide-methanol complex (ID 2.6)

NPV
IRR
РВР
$0,5M 29% 63 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes construction of an ultra-modern carbamide-methanol complex applying the most promising technologies - the combined production of ammonia and methanol, followed by the production of carbamide

دعم البنية التحتية:

1. Power, MW: 3,73 MW. There is a possibility of connection. Current power shortage/reserve - 3,73 MVA (substation 35/10 kV Ruzhnoe)

فترة التنفيذ

120 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$341,7M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$341,7M

Construction of 2 pig breeding complexes (ID 2.7)

NPV
IRR
РВР
- 9,5% 114 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes construction of 2 pig breeding complexes for 6800 sows with a total capacity of 26,000 tons of commercial pork per year

دعم البنية التحتية:

1. Power, MW: 14,8 MW. There is a possibility of connection. Current power reserve - 14,8 MWA (Substation 110/35/10 kW Pochepskaya)

فترة التنفيذ

10 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$53,5M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$53,5M

Creation of a milk processing and cheese production enterprise (ID 2.5)

NPV
IRR
РВР
$0,6M 16,52% 63 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project assumes construction of a plant for the manufacture of pickled cheeses with the potential of futher development and offering consumers high quality products at competitive prices

دعم البنية التحتية:

1. Power, MW: 9,68 MW. There is a possibility of connection. Substation 110/35/10 kW Nerussa: tranformers capacity - 16 MVA, current power reserve/shortage for the transformer substation - 8,86 MVA.
2. Gas, m3/h: 30 000 m3/h. There is a possibility of connection. Gas throughput - 30 000 m3/h.

فترة التنفيذ

84 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$12,9M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$12,9M

Construction of MSW landfills and waste sorting complexes (ID 4.28)

NPV
IRR
РВР
- - 42 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of 9 waste management facilities: MSW landfills and waste sorting complexes in the Voronezh region.

دعم البنية التحتية:

1. Electricity: 6,49 MW;
2. The presence of a railway line: the station "Davydovka", 2 km;
3. Nearest federal highway: M-4 Don Federal Highway, 11 km away.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2,8M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$2,8M

Concession of heat and power facilities (ID 4.30)

NPV
IRR
РВР
- - 3 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Concession transfer of heat and power facilities (22 municipal boiler houses).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$27M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$27M

Construction of a plant for the processing of municipal solid waste (ID 4.31)

NPV
IRR
РВР
- - 3 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the processing of municipal solid waste using promising methods of recycling waste as material and energy resources.

دعم البنية التحتية:

1. Power: 8,38 MW;
2. Water: 7596 m3/h;
3. Sewage: 460 m3/h;
4. Gas: available.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$52M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$52M

Biodegradable tableware production (ID 1.10)

NPV
IRR
РВР
$4M 15% 156 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.

دعم البنية التحتية:

1. Power: available;
2. Water: available;
3. Gas: available;
4. The nearest federal highway: the federal highway Belgorod-Grayvoron-border of Ukraine.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$3M

LED production (ID 12.16)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the creation of the production of LED products as part of the development of the Russian Federation's program for a gradual transition to energy-saving technologies and the abandonment of traditional light sources.

دعم البنية التحتية:

1. Power: 0,25-14,98 MW;
2. Water: available;
3. Sewage: available;
4. Gas: 500 m3/h;
5. Availability of a railway line: 5 km from the railway station;
6. The nearest federal highway: M2, E105, 10 km.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$36M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$36M

Complex development of territories (ID 10.2)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1B

مكان البيع

Moscow

التكلفة الإجمالية للمشروع

$1B

Construction of a sports and recreation complex (ID 11.25)

NPV
IRR
РВР
$20M 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8000 m2, with an emphasis on self-service, low prices and high throughput.

دعم البنية التحتية:

1. Power: 0,4 and 1 MW;
2. Water: 2,71 m3/h (cold water); 3 m3/h;
4. Gas: 357 m3/h;
5. The nearest federal highway: "Ural" M-5, about 15 km from the sports complex.

فترة التنفيذ

Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,7M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$3M

Construction of the convention and exhibition center (ID 4.10)

NPV
IRR
РВР
3,5 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The construction of a modern congress and exhibition center in Voronezh will create a platform for major events at the regional, interregional and federal levels.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$27M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$27M

Reconstruction of a shopping facility (ID 11.4)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.

دعم البنية التحتية:

1. Power, MW: there is a substation for 800 kW on the territory of the plant;
2. Water, m3/hour: available;
3. Sewage, m3/hour: available;
4. Gas, m3/hour: not required;
5. The nearest federal highway: A-108 (50m), M-5 Ural (8km).

الحاجة إلى تمويل إضافي

$20M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$28M

Organization of production of heating elements (ID 12.17)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

It is planned to create production lines, including the following stages of production:
- Oxide;
- Recovery;
- Manufacture of alloys;
- Pressing;
- Sintering;
- Forming;
- Heat treatment;
- Mechanical restoration.

دعم البنية التحتية:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$13M

Organization of production of electric stoves (ID 12.20)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project envisages the production of electric stoves with several hermetic levels, using energy-saving technology, as well as the possible production of built-in ovens and built-in hobs.

دعم البنية التحتية:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3.Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$47M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$47M

Construction of an international medical cluster (ID 10.3)

NPV
IRR
РВР
-

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.

The project is being implemented on the principles of PPP, and the leading medical centers of the OECD countries will be involved in the management of MMK facilities.

دعم البنية التحتية:

The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$486M

مكان البيع

Moscow

التكلفة الإجمالية للمشروع

$486M

Creation of places of application of labor (ID 10.4)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.

The mechanism for granting benefits (exemption from payment for changing the type of permitted use (VRI) of a land plot) is extended to the creation of not only objects of administrative and business or industrial and production purposes, but also objects of education, science, health and social security, sports, culture, trade , shopping and entertainment facilities, public catering, as well as multifunctional facilities, including all of the above types.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$105M

مكان البيع

Moscow

التكلفة الإجمالية للمشروع

$105M

Creation of a children’s technopark (ID 11.28)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.

دعم البنية التحتية:

1. Power, MW: 0.4;
2. Water, m3/hour: 1DN=100mm from the water supply networks of our own water intake unit with the possibility of purchasing additional the volume of drinking water at MUE "Vodokanal-Service";
3. Availability of a railway line: yes;
4. The nearest federal highway: M-2 "Crimea" (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$10M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$10M

Creation of a multifunctional sports complex (ID 11.32)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.

دعم البنية التحتية:

1. The nearest federal highway: M-7 Volga - 11 km, MKAD - 15 km.

الحاجة إلى تمويل إضافي

$4M

التكلفة الإجمالية للمشروع

$4M

Organization of production of ceramic refractory products (ID 12.1)

NPV
IRR
РВР
- - -

وصف موجز وفكرة

It is planned to create the production of ceramic refractory products of several types.
The main stages of production of ceramic refractory products:
- extraction and transportation of raw materials;
- preparation and storage of raw materials;
- molding;
- drying;
- roasting;
- control;
- packing and shipment.

دعم البنية التحتية:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/h: 36 m3/h - design capacity, 24 m3/h - free capacity;
3. Sewage, m3/h: 75 m3/h - design capacity, 69 m3/h - free capacity;
4. Gas, m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - free capacity;
5. The nearest federal highway: about 2 km to the M2 "Krym" highway.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$13M

Organization of production of ceramic sanitary ware (ID 12.6)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

"It is planned to create the production of ceramic sanitary ware. The production line consists of:
- kilns for roasting,
- molds for the product,
- foundry conveyor."

دعم البنية التحتية:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sevage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: about 2 km to the M-2 "Krym" highway.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$60M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$60M

Construction of a cement plant (ID 7.2)

NPV
IRR
РВР
$418M 20,8% 80 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.

دعم البنية التحتية:

1. Power: available;
2. Water: available ;
3. Sewage: available ;
4. Gas: available;
5. The nearest federal highway: 235 km, 8.5 km, 5.5 km.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$283M

مكان البيع

Kostroma Oblast

التكلفة الإجمالية للمشروع

$283M

Organization of modern production of ceramic facade materials (ID 1.18)

NPV
IRR
РВР
$13M 37,47% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.

The planned commissioning date is 2022.

The main raw material is our own raw material source - clays and loams of the Western area of ​​the Bykovsky ceramic clay deposit (up to 50%). Location of the deposit: Belgorod region, Yakovlevsky district, 0.5-1 km. South-west of the city of Stroitel and 3 km from the production site.

The main products are a wide range of ceramic panels (terracotta) for ventilated facades and decorative finishes for any type of building (up to 30 items).

The main consumers of the manufactured products are large and small enterprises of the Belgorod region and other regions of Russia, engaged in the construction industry.

دعم البنية التحتية:

The industrial site has all the necessary engineering infrastructure: power supply, gas supply, water supply and sanitation, access roads and railways. The distance from the industrial site to the Tomarovka railway station is 22 km. The site has storage areas for raw materials and finished products.

The organization of production is planned on the basis of the operating production site of Belgorodskaya Keramika LLC, located in the Belgorod Region (Stroitel). Address: Russian Federation, Belgorod region, Stroitel, the territory of the concrete goods plant-3.

Production is supposed to be located in the existing production building of a group of workshops with adjoining technical facilities with a total area of ​​12,352 m2.

The capacity of the existing infrastructure:
1. Power, MW: 17.46;
2. Water, m3/hour: 4 artesian wells, capacity - 120 m3/hour, when replacing pumps, an increase up to 200 m3/hour is possible; 2 tanks, capacity - 800 m3/hour; 2 pipelines, d = 100 mm, capacity - 360 m3/hour;
3. Sewage, m3/hour: 520;
4. Gas, m3/hour: 500 m3/hour, when replacing the HPH (high pressure reducer), it is possible to increase up to 4000 m3/hour;
5. The nearest federal highway: M-2 (2.5 km).

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$24M

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$24M

Organization of production of strontium based on celestite ores (ID 17.5)

NPV
IRR
РВР
- -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

It is planned to build an enterprise for the extraction and processing of celestite ores.

Celestine is a raw material for the production of strontium compounds used in sugar, glass, ceramics, pharmaceutical industries, and pyrotechnics. During the extraction of strontium, an equally important by-product is formed - dolomite, which is used in the production of refractory material, building materials, and rubber.

دعم البنية التحتية:

More than 20 deposits of strontium ores with total predicted resources of about 200 million tons have been discovered. In the Tula region, the Tabolskoye deposit has been explored and about 30 ore occurrences have been discovered.

The capacity of the existing infrastructure:
1. Power, MW: up to 100 MW (in the future, up to 150 MW);
2. Water, m3/hour: up to 26 thousand m3/day;
3. Sevage, m3/hour: up to 26 thousand m³/day;
4. Gas, m3/hour: up to 500 thousand m³/day;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 "Don" (passes along the border of the industrial park and the SEZ).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$29M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$29M

Organization of production of clinker tiles (ID 12.7)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

It is planned to create the production of clinker tiles. Products are manufactured on a conveyor line. Each of its components is an independent unit, with the possibility of replacement.

دعم البنية التحتية:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$4M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$4M

Organization of red brick production (ID 12.9)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.

دعم البنية التحتية:

1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);
2. Water, m3/hour: it is necessary to drill an artesian well. The territory of the district is provided with large explored reserves of water;
3. Gas, m3/hour: at a distance of 500 m from the boundaries of the site there is a main high-pressure gas pipeline;
4. The nearest federal highway: M-2 (50 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$3M

Organization of production of refractory red bricks (ID 12.12)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the creation of an enterprise for the production of refractory bricks. The scope of this brick as the main furnace material in civil engineering, municipal infrastructure of settlements, including boiler houses, thermal power plants.

دعم البنية التحتية:

1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);
2. Water, m3/hour: it is necessary to drill an artesian well. The territory of the district is provided with large explored reserves of water;
3. Gas, m3/hour: at a distance of 500 m from the boundaries of the site there is a main high-pressure gas pipeline;
4. The nearest federal highway: M-2 (50 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$39M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$39M

Organization of production of panels for industrial housing construction (ID 12.13)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

It is planned to create the production of panels for industrial housing construction:
- construction of production areas and warehouses;
- acquisition of metal molds and lifting mechanisms;
- creation of a concrete mixing unit.

دعم البنية التحتية:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$4M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$4M

Organization of red brick production (ID 12.9)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.

دعم البنية التحتية:

1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);
2. Water, m3/hour: it is necessary to drill an artesian well. The territory of the district is provided with large explored reserves of water;
3. Gas, m3/hour: at a distance of 500 m from the boundaries of the site there is a main high-pressure gas pipeline;
4. The nearest federal highway: M-2 (50 km).

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$3M

Establishment of building materials production (ID 11.33)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Manufacture of finishing products and construction products.

دعم البنية التحتية:

1. The nearest federal highway: M-1 (24 km), M-9 (42 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$3M

Construction of a cement plant (1st stage) (ID 6.13)

NPV
IRR
РВР
$79M 17% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of the first stage of the plant for the production of cement.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 15 km.

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$600M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$621M

Construction of a cement plant (2nd stage) (ID 6.14)

NPV
IRR
РВР
$17M 17% 60 months

وصف موجز وفكرة

Construction of the second stage of the plant for the production of cement.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 15 km.

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$148M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$148M

Construction of a plant for the production of wood-based sheet materials (ID 6.25)

NPV
IRR
РВР
$76К 31% 42 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of wood-based sheet materials in order to meet the needs of the domestic market for high-quality and competitive domestic timber and paper products, ensure environmental safety, and sustainably meet public needs for forest resources and services.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 20 km.

فترة التنفيذ

4 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$304 thousand

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$304К

Construction of a plant for the production of radio-transparent and radio-absorbing materials (ID 17.9)

NPV
IRR
РВР
- - 72 months

وصف موجز وفكرة

Construction of a plant for the production of radio-transparent and radio-absorbing materials

دعم البنية التحتية:

1. Power, MW: 100;
2. Water, m3/hour: 1000;
3. Sewage, m3/hour: 7000;
4. Gas, m3/hour: 1000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$27M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$27M

Construction of an enterprise for the extraction of gypsum stone (ID 17.16)

NPV
IRR
РВР
- - 96 months

وصف موجز وفكرة

Construction of an enterprise for the extraction of gypsum stone at the Bolokhovsky, Obolensky, Skuratovsky deposits.

دعم البنية التحتية:

1. Power, MW: 30;
2. Water, m3/hour: 20;
3. Sewage, m3/hour: 20;
4. Gas, m3/hour: 15;
5. The nearest federal highway: M-4 Don.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$67M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$67M

Creation of paint and varnish production (ID 17.28)

NPV
IRR
РВР
- - 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of varnishes, paints, enamels, primers, adhesives, fillers, coloring pigments and drying oils.

دعم البنية التحتية:

1. Power, MW: 60;
2. Water, m3/hour: 100;
3. Sewage, m3/hour: 100;
4. Gas, m3/hour: 450;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-2 Crimea.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$13M

Construction of a modern production facility for the production of knitwear (ID 6.12)

NPV
IRR
РВР
$8M 53% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a modern production facility for the production of knitwear.

دعم البنية التحتية:

The capacity of the existing infrastructure of the 1st section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 17 km.

The capacity of the existing infrastructure of the 2nd section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. Nearest federal highway: M-3, 2.4 km

The capacity of the existing infrastructure of the 3rd section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. Nearest federal highway: M-3, 1.5 km

The capacity of the existing infrastructure of the 4th section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: A-130, 20 km, M-3, 24 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$21M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$21M

Organization of production of medical textiles (ID 5.3)

NPV
IRR
РВР
$10M 19% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Enterprise for the production of medical textiles. The main products are functional medical textiles.

دعم البنية التحتية:

1. Power, MW: 8;
2. Water, m3/hour: 550;
3. Sewage, m3/hour: 160;
4. Gas, m3/hour: 4000;
5. The presence of a railway line;
6. The nearest federal highway: M-7 (100 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$16M

مكان البيع

Ivanov Oblast

التكلفة الإجمالية للمشروع

$8M

Organization of import-substituting production of vials for medical packaging (ID 2.3)

NPV
IRR
РВР
$1M 25,31% 44 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the creation on the territory of the Bryansk region of a modern, highly efficient production facility for the production of vials from medical glass of the second hydrolytic class to meet the demand of the pharmaceutical industry in high-quality medical glassware of domestic production.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$3M

Construction of light rail transport in Voronezh (ID 4.17)

NPV
IRR
РВР
- - 3 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a light rail transport system in Voronezh with elements of accelerated traffic in peripheral areas, with more sparse stops and increased intervals, and with more frequent stops in the middle and central parts

دعم البنية التحتية:

1. Power: 3,5 MW;
2. Water: 13 m3/h;
3. Sewage: 5 m3/h;
4. Gas: 2000 m3/h.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$676M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$676M

Construction of an automotive components production plant (ID 6.2)

NPV
IRR
РВР
$9,5M 17% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project aims to build a plant for the production of automotive components.

دعم البنية التحتية:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 6 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,5M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$13,5M

Production of small aviation aircraft for agricultural use (ID 11.1)

NPV
IRR
РВР
- - 36-60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Development of the "RATAY" aeromobile aircraft complex for agricultural use

دعم البنية التحتية:

1. Power: MW: 800 KW;
2. Water: m3/h: available;
3. Sewage: m3/h: available;
4. Gas: m3/h: not required;
5. The nearest federal highway: A-108 (50m), M-5 "Ural" (8km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$7,4M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$7,4M

Production of filling and packaging machines (ID 5.9)

NPV
IRR
РВР
- 5,5 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.

دعم البنية التحتية:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. Gas: m3/h: 25 Gcal/hour;
4. The railway line: available;
6. The nearest federal highway: М-7 (100 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$9,5M

مكان البيع

Ivanovo Oblast

التكلفة الإجمالية للمشروع

$9,5M

Production of components for special vehicles (ID 5.10)

NPV
IRR
РВР
- - 5,5 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.

دعم البنية التحتية:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. Gas: m3/h: 25 Gcal/hour;
4. The railway line: available;
6. The nearest federal highway: М-7 (100 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$11M

مكان البيع

Ivanovo Oblast

التكلفة الإجمالية للمشروع

$11M

Construction of an automotive components production plant (ID 17.1)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

"The Uzlovaya" Industrial Park was the site of one of Russia's largest car manufacturing projects in 2018, implemented by the Russian division of China's Great Wall Motor Company Limited.

دعم البنية التحتية:

1. Power: up to 100 MW;
2. Water: m3/h: 26000 m3/day;
3. Sewage: m3/h: 26000 m3/day;
4. Gas: m3/h: 500 000 m3/day;
5. The nearest federal highway: М-4 (100 m).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,5M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$13,5M

Industrial electric motor production (ID 12.15)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the production of electric motors designed to convert energy. This type of device transforms electric power into motive power or mechanical work.

دعم البنية التحتية:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$122M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$122M

Production of traction electric motors (ID 12.18)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves creating a full production cycle for traction electric motors: producing components, assembling, and testing them.
In addition to railway transport, traction motors will also be in demand in other sectors of the economy - oil and gas, metallurgy, mining, and power generation.

دعم البنية التحتية:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$88M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$88M

Creation of a sealing materials plant (ID 17.25)

NPV
IRR
РВР
- - 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of production of high-temperature composite sealing materials

دعم البنية التحتية:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 ""Don"" (1 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$4M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$4M

Expansion of diesel engine production (ID 17.31)

NPV
IRR
РВР
- - 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Organizing increased output of diesel engines with a prospective program of up to 3,000 engines per year at "Tulamashzavod". The project is aimed at reconstructing production facilities and purchasing the necessary equipment to expand production capacity and increase diesel engine output.

دعم البنية التحتية:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$3M

Construction of a composite coating plant (ID 17.35)

NPV
IRR
РВР
- - 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of an organization for the production of polymer and composite coatings for aviation, rocket and space, special equipment, and other industries

دعم البنية التحتية:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don" (1 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$22M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$22M

Creation of an automotive component production complex (ID 17.42)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a production complex for automotive components in the private and commercial vehicle segments

دعم البنية التحتية:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don" (1 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$270,3M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$270,3M

Creation of a rabbit farm (ID 1.7)

NPV
IRR
РВР
$173К 39,7% 49,56 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a rabbit farm located in the Ivnyansky district, Belgorod Oblast
The project involves farming meat rabbits of the California breed. 
The planned date of reaching the projected capacity is 2022.
The project site is currently an undeveloped land plot of 55.9 hectares, 64 km from the city of Belgorod. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. 
The distance from the industrial site to the federal highway M-2 "Krym" is 5.5 km.
The main consumers of the project's products are located in the Central Federal District.

دعم البنية التحتية:

1. Power: available;
2. Water: m3/h: available;
3. Gas:m3/h: available;
4. The nearest federal highway: available.

فترة التنفيذ

8 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$280К

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$280К

Construction of a plant for the production of frozen cooked potatoes and potato flakes (ID 2.2)

NPV
IRR
РВР
$27M 15,4% 76 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of frozen cooked potatoes and potato flakes

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$62M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$66M

Construction of a greenhouse complex for year-round cultivation of vegetable crops (ID 2.4)

NPV
IRR
РВР
$2,53M 3,95% 7,4 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the construction of an ultra-modern greenhouse complex using the latest achievements of the world's crop production in the protected ground.

دعم البنية التحتية:

1. Power: connectivity available;
2. Water: m3/h: connectivity available;
3. Sewage: m3/h: connectivity available;
4. Gas: connectivity available;
5. The nearest federal highway: R-120 (1,5 km).

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$25M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$25M

Production of pharmaceutical substances (ID 17.7)

NPV
IRR
РВР
- -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Production of pharmaceutical substances

دعم البنية التحتية:

1. Power, MW: 8;
2. Water, m3/hour: 12;
3. Sewage, m3/hour: 12;
4. Gas, m3/hour: 6;
5. The nearest federal highway: M-4 Don.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$27M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$27M

Construction of a grain advanced processing complex (ID 4.6)

NPV
IRR
РВР
$42M 15,78% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a complex for advanced processing of wheat grain to produce gluten, bran, amino acids, lactic acid, fodder product, crystalline glucose

دعم البنية التحتية:

1. Power: 15 MW;
2. Water: 62 m3/h;
3. Sewage: 62 m3/h;
4. Gas: 6000 m3/h.

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$203M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$203M

Construction of a plant for the production of medical isotope (ID 17.17)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of the production of medical isotope TS99.

دعم البنية التحتية:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The presence of a railway line:;
6. The nearest federal highway: M-4 Don (1 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$81M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$81M

Manufacture of 10-wire reinforcing ropes (ID 3.2)

NPV
IRR
РВР
$864M 58,87 -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

When reinforcing prestressed products with K7 ropes, one of the key problems is the insufficient adhesion force of the rope to concrete. When transversely cutting the workpiece into products, rope slippage often occurs, which is manifested by the retraction of the reinforcement deep into the product. This phenomenon has a negative effect on the bearing capacity, so the product, depending on the scale of the problem, is transferred to lower strength groups or cut to smaller lengths for which the stored tension is sufficient, and in some cases even rejected. These problems are completely solved by using the TK10 rope as reinforcement on the BOF lines.
TK10 is an innovative ten-wire steel triangular rebar intended for use in prestressed concrete products. The innovation consists in changing the cross-sectional shape of a standard 7-wire reinforcing rope by creating pronounced side edges by adding 3 additional wires to the rope, which protrude significantly in space.
This form gives a high grip to the reinforcing rope, in contrast to the standard rope in which the grip occurs only due to adhesion. The protruding edges of the TK10 rope increase grip, similar to the protruding threads. In addition, the adhesion is additionally reinforced with a periodic profile, which excludes the rope from being screwed into the concrete according to its own imprint.

دعم البنية التحتية:

1. Power, MW: the estimated power of electrical receivers is 2.7 MW,
2. Water, m3/h: the stabilization line includes a closed water cooling system using clean industrial water. Compensation for evaporation losses in
volume of 0.1 m3 for the production of 1 ton of products. At maximum production capacity, clean water consumption for technological needs will not exceed 1 m3/hour.
The laboratory and administrative premises use drinking water that meets the requirements of SanPiN 2.1.4.559 “Drinking water. Hygienic requirements for
water quality of centralized drinking water supply systems”. Average consumption of drinking water: 3 m3/day.

فترة التنفيذ

9 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$29M

مكان البيع

Vladimir Oblast, Kameshkovo

التكلفة الإجمالية للمشروع

$29M

Modernization of tool production (ID 17.11)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

New tool production of ITO-Tulamash JSC.

دعم البنية التحتية:

1. Power, MW: 100;
2. Water, m3/hour: 1000;
3. Sewage, m3/hour: 7000;
4. Gas, m3/hour: 1000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$5M

Construction of a turkey breeding complex (ID 4.9)

NPV
IRR
РВР
$47M 27,8% 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a turkey breeding complex

دعم البنية التحتية:

1. Power: 3,09 MW;
2. Water: 1000 m3/h;
3. The nearest federal highway: R-193 "Voronezh - Tambov" (3,8 km), R-22 "Caspiy" (110 km), M-4 "Don" (97 km)..

فترة التنفيذ

9 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$11,4M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$11,4M

Construction of a dairy cattle complex (ID 4.16)

NPV
IRR
РВР
$2M 11,96% 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a dairy complex in Voronezh Oblast - a loose housing farm for 1,000 dairy cows with a complete herd reproduction cycle, organisation of milk processing and fodder provision

دعم البنية التحتية:

1. Power: 1,5 MW;
2. Water: 3 m3/h;
3. Sewage: 5 m3/h;
4. The railway line: available.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$17,6M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$17,6M

Construction of a cattle breeding livestock complex (ID 4.18)

NPV
IRR
РВР
- - 3 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a modern and efficient agricultural facility for breeding livestock, milk, and meat production

دعم البنية التحتية:

1. Power: 2 MW;
2. Water: 5,5 m3/h;
3. Sewage: 5 m3/h;
4. Gas: 3000 m3/h
5. The railway line: available.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$67,6M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$67,6M

Construction of a fruit and vegetable storage facility (ID 4.19)

NPV
IRR
РВР
$7,23M 25,63% 39 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a fruit and vegetable storage facility with a capacity of 12,000 tonnes

دعم البنية التحتية:

1. Power: 5 MW;
2. Water: 1000 m3/h;
5. The railway line: available.

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$15M

Construction of a high-efficiency wheat processing industrial complex (ID 8.1)

NPV
IRR
РВР
$80M 15,96% 69 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The investment project aims to create and commercially operate a high-tech wheat advanced processing complex. The facility will produce the following products: dry wheat gluten, native starch, modified starches, maltodextrin, dry glucose syrup, caramel molasses, and wheat bran-based feedstuff.

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$209M

مكان البيع

Kursk Oblast

التكلفة الإجمالية للمشروع

$209M

Construction of a horticultural processing plant (ID 4.13)

NPV
IRR
РВР
$2M 10,62% 42 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a horticultural processing plant

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$7M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$7M

Construction of a seed production complex (ID 4.24)

NPV
IRR
РВР
$3M 40% 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a breeding and seed-breeding complex in the Voronezh Oblast

دعم البنية التحتية:

1. Power: 2х6, 3 MW;
2. Water: m3/h: construction of artesian wells/water intake required.

فترة التنفيذ

9 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3,24M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$6M

Creation of super-intensive type gardens (ID 4.22)

NPV
IRR
РВР
- 10,53% -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of super-intensive type gardens

دعم البنية التحتية:

1. Water: 150-200 m3/h.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$7,4M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$7,4M

Construction of a plant for component parts for metalworking machines (ID 17.19)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a new production of components for the repair and modernization of metalworking machines.

دعم البنية التحتية:

1. Power, MW: 100;
2. Water, m3/hour: 1000;
3. Sewage, m3/hour: 7000;
4. Gas, m3/hour: 1000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$675K

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$675K

Construction of a compound feed mill (ID 4.12)

NPV
IRR
РВР
$31,08M 20,15% 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of an all-purpose feed mill with a granary with a capacity of 120,000 tonnes of grain storage

دعم البنية التحتية:

1. Power: 192 MW;
2. Water: 158,3 m3/h;
3. Sewage: 3 500 m3/h;
4. Gas: 64 900 m3/h
5. The railway line: South-Eastern Railways "Section Liski-Povorino" and "Bityug" railway station;
6. The nearest federal highway: M4 "Bobrov - Talovaya - Novokhopersk, M4 "Don" (11 km).

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,5M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$13,5M

Construction of a modern greenhouse complex (ID 4.29)

NPV
IRR
РВР
$56M 42 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of an indoor greenhouse complex in the Voronezh region, producing vegetables all year round and equipped with modern equipment with automated control systems, mineral nutrition, the newest low-volume hydroponic technology with extra lighting, climate control, and a meteorological station

دعم البنية التحتية:

1. Power: MW: 12.14 MVA;
2. Water: m3/: 1,000 cubic meters per day.

فترة التنفيذ

9 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$40,5M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$40,5M

Mushroom production (ID 12.3)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves 4 types of products:
- Fresh eringas in raw condition;
- Varietal shimeji in packs;
- Raw agaric honey;
- Selected sorted chanterelles in packs.

دعم البنية التحتية:

1. Power: MW: 10 kV: located on the land;
2. Water: m3/h: water supply is available from a wood processing plant 0.5 km from the site.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$5M

Production of baby porridge (ID 12.4)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a baby food production facility
All ingredients for production are purchased in the Orel Oblast or neighboring regions
Capital costs for land lease, construction of facilities, purchase of equipment

دعم البنية التحتية:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 ""Crimea Highway"" (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$65M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$65M

Organization of production of automated control and metering stations for electricity (ID 5.1)

NPV
IRR
РВР
$16M 31% 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.

دعم البنية التحتية:

1. Power, MW: 10;
2. Water supply, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$47M

مكان البيع

Ivanov Oblast

التكلفة الإجمالية للمشروع

$47m

Production of baby fruit puree (ID 12.5)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The aim of the project is to start the production of fruit puree for children. All ingredients for production are purchased in the Oryol Oblast from farms and agricultural farms.
Capital costs for land lease, construction of facilities, purchase of equipment

دعم البنية التحتية:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 "Crimea Highway" (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$27M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$27M

Production of distilled potable alcoholic and non-alcoholic beverages (ID 14.3)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distillery

دعم البنية التحتية:

1. Power: MW: 600 kW;
2. The railway line: available;
3. The nearest federal highway: M1 "Belarus" (4 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$2M

Construction project for an automated cattle dairy farm (ID 14.1)

NPV
IRR
РВР
- 19,2% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cows

دعم البنية التحتية:

1. The railway line: available;
2. The nearest federal highway: M-1 (25 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$2,3M

Creation of a broiler poultry farm (ID 14.4)

NPV
IRR
РВР
- 31 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Investment attraction at the former broiler farm site
Reconstruction of the production and storage site and the launch of a new production facility at the former broiler farm.

دعم البنية التحتية:

1. Power: 3,8 MW;
2. Water: m3/h: 4 artesian wells;
3. Gas: m3/h: annual limit - 3,644,100 m3;
4. The nearest federal highway: M1 "Belarus" highway (160 km, near the road "Smolensk-Bryansk").

فترة التنفيذ

36 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$29M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$29M

Construction and maintenance of an industrial greenhouse complex (ID 14.5)

NPV
IRR
РВР
$39,2M 15,6% 111 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per year

دعم البنية التحتية:

1. Power: 36 MW;
2. The railway line: available;
3. The nearest federal highway: M1 "Belarus" highway (1 km)."

فترة التنفيذ

37 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$84,3M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$84,3M

Construction of a vegetable drying complex project (ID 14.2)

NPV
IRR
РВР
$45M 29,2% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.
Production technology: by dehydration the most efficient in these conditions method of convective drying with the use of automatic raw material processing lines was selected.

دعم البنية التحتية:

1. Power: 26 MW;
2. Water: 685 m3/h;
3. Sewage: 685 m3/h;
4. Gas: 495 m3/h;
5. The nearest federal highway: M1 "Belarus" highway (7,5 km).

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$17M

مكان البيع

Smolensk Oblast

التكلفة الإجمالية للمشروع

$17M

Production of frozen berry and vegetable crops (ID 1.4)

NPV
IRR
РВР
$2,3M 31,17% 64,56 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.
The project is expected to reach its projected capacity in 2022.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement Ivnya. The land plot is owned by Belgorod Oblast. The construction of engineering and transport infrastructure facilities, driveways, roads, and logistics sites, as well as electricity, gas, and water supply systems is planned.
The project includes the construction of a long-term storage facility for frozen products with a capacity of up to 5,000 tonnes, a sorting facility, and the purchase of blast freezing equipment.
The main consumers of the project's products are located in the Central Federal District.

دعم البنية التحتية:

1. Power, MW: available:
2. Water, m3/hour: available;
3. Sewage, m3/hour: available;
4. Gas, m3/hour: available;
5. The nearest federal highway: M-2 "Crimea Highway" (5,5 km).

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$8M

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$8M

Construction of a confectionery plant (ID 16.2)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Production of breadcrumbs, biscuits, and other dry bakery products, production of flour confectionery, cakes, pastries, pies, and biscuits intended for long-term storage.

فترة التنفيذ

36 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$63,5M

مكان البيع

Tver Oblast

التكلفة الإجمالية للمشروع

$63,5M

Creation of a modern high-tech swine-breeding complex (ID 16.4)

NPV
IRR
РВР
- -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Investment project for the construction of a high-tech meat processing complex, a feed mill, and a livestock breeding complex, including its own five swine-breeding complexes, a breeding and genetic center for 2,500 sows, a feed mill for up to 150,000 tonnes per year, a drying complex, a separation plant, a grass meal facility, and a storage complex. Project implementation period: 36 months. The number of employment places is 790.

فترة التنفيذ

36 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$62,2M

مكان البيع

Tver Oblast

التكلفة الإجمالية للمشروع

$62,2M

Creation of an innovative greenhouse complex for vegetable production (ID 16.5)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

High-tech greenhouse complex for growing greenhouse vegetables, with three phases of implementation.
The investment project involves the use of advanced and innovative equipment and technology. 
The total cost of the project is Rub 4.6 billion ($62,2 million). Project implementation period: 36 months.  

دعم البنية التحتية:

1. The nearest federal highway: M-10 (1,5 km)

فترة التنفيذ

36 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$62,2M

مكان البيع

Tver Oblast

التكلفة الإجمالية للمشروع

$62,2M

Construction of a plant for the production of semi-soft and hard cheese (ID 1.16)

NPV
IRR
РВР
$3M 10,8% 100,6 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.
The planned commissioning date is 2023.
Requirements for the project site: a land plot of at least 3 hectares for the construction of a production building.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement of Ivnya. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. "

دعم البنية التحتية:

1. The nearest federal highway: M-2 "Crimea Highway" (5,5 km)

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$7M

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$7M

Construction of a plant for the production of integrated circuits (ID 6.3)

NPV
IRR
РВР
$1M 15% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a plant for the production of microcircuits.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.4 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$25M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$25M

Organization of production of charging stations for electric vehicles (ID 5.2)

NPV
IRR
РВР
$8M 2% 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.

دعم البنية التحتية:

1. Power, MW: 10;
2. Water, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

فترة التنفيذ

8 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5M

مكان البيع

Ivanov Oblast

التكلفة الإجمالية للمشروع

$5M

Organization of production of energy storage systems (ID 5.7)

NPV
IRR
РВР
- - 7,4 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.

دعم البنية التحتية:

1. Power, MW: 10;
2. Water, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$24M

مكان البيع

Ivanov Oblast

التكلفة الإجمالية للمشروع

$24M

Manufacture of complete busbar systems (ID 3.1)

NPV
IRR
РВР
$45 thousand 20,8% 170,16 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.

The investment project involves the production of complete busbar systems for power transmission with a degree of protection IP55, IP68.

The main parameters of the products planned for release:
- Bus material: copper or aluminum;
- Degree of protection of the case: IP55, IP68;
- Cast insulation is used as insulation - a compound of our own design (application
No. 2018116892 dated May 18, 2018 for obtaining a patent for the invention "Polyurethane compound of cold curing");
- The size of a standard section of busbar trunking is 3 meters.

Sections of the bus duct (bus duct system) are made using an aluminum or copper bus as a current-carrying element. The busbar section is selected depending on the electrical power transmitted by the system. The design uses a tightly compressed package of insulated busbars, enclosed in a metal or polymer case, depending on the required degree of protection.

Depending on the design and requirements of the consumer, the busbar system can contain up to five independent current-carrying conductors enclosed in one housing. The connection of the consumer of electricity to the busbar system is carried out either with the help of terminal sections of the busbar, which allow taking full power from the busbar, or by power take-offs, each designed for a certain power.

The size of a standard busbar section is 3 meters, which is a multiple of the standard column grid in construction. Also, busbar sections can be made smaller, for ease of routing and installation of the system.

دعم البنية التحتية:

1. Power, MW: 0.37;
2. Water, m3/h: 8.11;
3. Sewage, m3/hour: 8.11;
4. Gas, m3/hour: 650;
5. The nearest federal highway: M-8.

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Vladimir Oblast, Kolchuginsky district, Kolchugino city

التكلفة الإجمالية للمشروع

$2M

Organization of production of household appliances (ID 12.2)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the creation of a plant for the production of household appliances.

After the completion of the construction of the plant and the launch of production, it is planned to produce the following products:
- Vacuum cleaners;
- Mixers;
- Meat grinders;
- Accessories.

دعم البنية التحتية:

1. Power, MW: 0.25-14.98;
2. Water, m3/hour: there is a possibility of connection;
3. Sewage, m3/hour: there is a possibility of connection;
4. Gas, m3/hour: 500;
5. Availability of a railway line: 5 km from the railway station;
6. The nearest federal highway: M-2, E-105 (10 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$21M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$21M

Organization of production of logistics controllers and switching equipment (ID 12.11)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Logistic controllers and switching equipment are designed to control technological processes. These products are used both in manufacturing (for example, equipment for an automation system designed to monitor and control process processors in the quality control line of tubing, casing and oil and gas pipes) and in household appliances (for example, a washing machine control module).

The project aims to create a line of specialized products with a high level of localization for the needs of government organizations, state-owned enterprises and commercial enterprises, which will reduce dependence on foreign manufacturers.

دعم البنية التحتية:

1. Power, MW: 0.25;
2. Water, m3/h: private networks;
3. Sewage, m3/hour: private networks;
4. Gas, m3/hour: 300;
5. Availability of a railway line: 5 km from the railway station;
6. The nearest federal highway: M-2, E-105, (7 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$54M

مكان البيع

Orlov Oblast

التكلفة الإجمالية للمشروع

$54M

Organization of production of electric drives (ID 5.11)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Establishment of an enterprise for the production of electric drives.

The main products are electric drives for industrial equipment, pipeline fittings, household appliances, ventilation systems.

دعم البنية التحتية:

1. Power, MW: 8;
2. Water, m3/hour: 550;
3. Sewage, m3/hour: 160;
4. Gas, m3/hour: ;
5. Availability of a railway line: 4,000;
6. The nearest federal highway: M-7, 100 km.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$27M

مكان البيع

Ivanov Oblast

التكلفة الإجمالية للمشروع

$27M

Deep processing of plant products (ID 17.3)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a production facility for the deep processing of horticultural, fruit, berry products and the creation of ready-made meals

دعم البنية التحتية:

1. Power: up to 100 MW: eventually up to 150 MW;
2. Water: m3/h: up to 26 000 m3/day;
3. Sewage: m3/h: up to 26 000 m3/day;
4. Gas: m3/h: up to 500 000 m3/day;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$38M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$38M

Creating a craft lemonade and cider production(ID 12.10)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project aims to create a business from scratch. Foreseen costs are for the lease/purchase of land; construction of facilities for production and storage; transportation; purchase of equipment for lemonade and cider production and bottling; regular delivery of raw materials and containers; marketing strategy for market entry; advertising campaign; training and staff salaries.

دعم البنية التحتية:

1. Power: 0,25 MW;
2. Water: m3/h: private;
3. Sewage: m3/h: private;
4. Gas: 300 m3/h;
5. The railway line: railway station (5 km);
6. The nearest federal highway: M-2, E-107 (7 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,5M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$1,5M

Creation of a beer production (ID 12.14)

NPV
IRR
РВР
- -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The aim of the project is to open a brewery in the Orel Oblast. Sales are planned in the oblast and neighboring oblasts.

دعم البنية التحتية:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 (2 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$62,2M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$62,2M

Construction of a duck production and selling complex (ID 12.21)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the construction of a complex for the production and selling of 7,000 ducks per year. The project includes the creation of a processing chain, including the purchase of ducklings, their raising, and further resale.

دعم البنية التحتية:

1. Power: 30 MW: substation is 1,2 km away;
2. Water: m3/h: drilling of an artesian well is required;
3. Gas: m3/h: there is a high-pressure gas pipeline running 500 m away from the site;
4. The nearest federal highway: M-2 "Crimea Highway" (50 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$300K

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$300K

Construction of a berry farm (ID 12.22)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The implementation of an investment project involves expenses for:
- Lease (purchase) of land;
- Seedings purchase;
- Gardening equipment purchase;
- Paying salaries to hired workers;
- Expenses for the transportation of products.

دعم البنية التحتية:

1. Power: MW:10 kV, on the land;
2. Water: m3/h: possible from wood processing plant (0,5 km);
3. Gas: m3/h: high-pressure gas pipeline - d 225, polyethylene 1 km from the site;
4. The railway line: railway station (300 m);
5. The nearest federal highway: M-2 "Crimea Highway" (50 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$110K

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$110K

Construction of a berry greenhouse (ID 12.23)

NPV
IRR
РВР
- -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of an industrial multi-span greenhouse
The greenhouse is a prefabricated structure assembled from a variety of prefabricated elements

دعم البنية التحتية:

1. Power: MW:10 kV, on the land;
2. Water: m3/h: possible from wood processing plant (0,5 km);
3. Gas: m3/h: high-pressure gas pipeline - d 225, polyethylene 1 km from the site;
4. The railway line: railway station (300 m);
5. The nearest federal highway: M-2 "Crimea Highway" (50 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$34M

مكان البيع

Oryol Oblast

التكلفة الإجمالية للمشروع

$34M

Construction of a wholesale distribution center for agricultural products (ID 4.20)

NPV
IRR
РВР
$98M 20,31% 32 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction in the Voronezh region of a wholesale distribution center for agricultural products, designed to supply potatoes, onions, cabbage, carrots and table beets, storage, pre-sale preparation and delivery of products grown by local producers to retail chains and other trade organizations.

دعم البنية التحتية:

1. Power, MW: SS 110 kV "Bobrov" 20 km, power reserve 192 MVA;
2. Water, m3/h: own water intake facilities, groundwater depth
90-110m;
3. Gas, m3/hour: 15-20 thousand;
4. The nearest federal highway: the site is located 30 km from the federal highway M4 "DON".

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$45M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$45M

Construction of an industrial park (ID 11.3)

NPV
IRR
РВР
$6M - 204 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.

دعم البنية التحتية:

1. Power, MW: 40;
2 Gas, m3/hour: 15,000;
3. The nearest federal highway: A-107 (0 m), Central Ring Road (1 km), M-4 "Don" (13 km), M-2 "Crimea" (28 km).

فترة التنفيذ

18 months (for one object)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$675M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$675M

Creation of an agro-industrial technology park (ID 11.16)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.

دعم البنية التحتية:

1. Power, 3 MW;
2. Water: m3/hour: 650 m3/day;
3. Sewage: m3/hour: 2000 m3/day;
4. Gas: 2200 m3/hour;
5. The nearest federal highway: R-106 (2 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$68,5M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$68,5M

Creation of an Atlantic salmon farming plant (ID 11.23)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of an Atlantic salmon farming plant in the Kashira urban district

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$54M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$54M

Construction of a wholesale distribution center (ID 1.11)

NPV
IRR
РВР
$857 thousand 11,32$ 112,56

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.

The presence of a slaughterhouse for up to 5 cattle or 10 pigs and equipment for intensive cooling and shock freezing will ensure high-quality primary processing of pork and cattle meat, which will significantly increase the competitiveness and profitability of the products.

The planned date for reaching the design capacity is 2022.

The project site is currently an undeveloped land plot with an area of ​​55.9 hectares, 64 km from the city of Belgorod and 26 km from the village of Ivnya (the center of the municipality). The land plot is owned by the Belgorod region.

The construction of engineering and transport infrastructure facilities, driveways, roads and logistics sites, a system of electricity, gas and water supply (increasing the capacity of networks) is envisaged.

The project involves the construction of a warehouse for long-term storage of apples with a total capacity of up to 1500 tons with a sorting workshop (LLC EUROHOLOD, Moscow). Construction of a refrigeration and freezing warehouse (LLC PROFSTAL). Completion of the slaughter shop for up to 5 cattle or 10 pigs (DiPiProm LLC).

The main consumers of the services of the wholesale distribution center are small-scale agricultural producers of the Ivnyansky, Rakityansky, Prokhorovsky districts of the Belgorod region, as well as Bolshesoldatsky, Belovsky, Oboyansky districts of the Kursk region.

دعم البنية التحتية:

1. Power, MW: source 1 - SS-35/10kV "Kochetovka"; electricity was supplied according to a temporary scheme with a capacity of 630 kW, TU No. 5-199 / 20284964 of 12/19/2013;
2. Water, m3/h: possible with the help of well drilling; to meet the demand of 125 m3/hour, it is necessary to drill 6 water wells of 25 m3/hour each (5 working and 1 reserve);
3. Gas, m3/h: source - GDS s. Small Mayachki (P 0.6 MPa), underground gas pipeline; free peak load 2 - 6.7 thousand m3/hour; a gas pipeline with a maximum hourly flow rate of 6.6 thousand m3/hour was connected, TU No. 7566 dated November 29, 2013;
4. The nearest federal highway: M-2 "Crimea" (5.5 km).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$26M

مكان البيع

Belgorod Oblast

التكلفة الإجمالية للمشروع

$26M

Organization of logistics and storage facilities (ID 17.4)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Organization of industrial real estate objects in the Tula region (distribution center, fulfillment, temperature warehouse, temporary storage warehouse, etc.).

دعم البنية التحتية:

1. Power, MW: up to 100 MW (in the future, up to 150 MW);
2. Water, m3/hour: up to 26 thousand m3/day;
3. Sewage, m3/hour: up to 26 thousand m³/day;
4. Gas, m3/hour: up to 500 thousand m³/day;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 "Don" (passes along the border of the industrial park).

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$40M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$40M

Construction of transport interchange hub of TPU (ID 11.9)

NPV
IRR
РВР
$1M 21,4% 7,9 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.

فترة التنفيذ

108 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1B

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$1B

Construction of transport interchange hub of TPU (ID 11.17)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.

فترة التنفيذ

36 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$181M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$181M

Construction of transport interchange hub of TPU (ID 11.18)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.

دعم البنية التحتية:

1. The presence of a railway line

فترة التنفيذ

36 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$67M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$67M

Construction of a production and warehouse complex (ID 11.20)

NPV
IRR
РВР
- 19,4% 96 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Design and construction of a production and warehouse complex in the Mozhaisk city district.

دعم البنية التحتية:

1. Power, MW: 3;
2. Water, m3/hour: 510;
3. Sewage, m3/hour: 980;
4. Gas, m3/hour: 1194;
5. The nearest federal highway: M1 "Belarus", 0 km (ZU are adjacent to the highway).

فترة التنفيذ

14 months – 1st stage, 12 months. – 2nd stage

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$47M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$47M

Construction of an industrial and logistics complex (ID 11.21)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.

دعم البنية التحتية:

1. Power, MW: 10 with a possible increase;
2. Water, m3/hour: individual well;
3. Gas, m3/hour: gas pipeline along the border, but reconstruction of the Yakot GDS is required;
5. Availability of a railway line: ;
6. The nearest federal highway: Dmitrovskoe shosse (A-104) - 300 m, A-108 (part of the Dmitrov bypass) - passes through the project area.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$40M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$40M

Construction of a logistics center (ID 11.34)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a logistics center in the urban district of Serebryanye Prudy.

دعم البنية التحتية:

1. Power, MW: 5.53;
2. The nearest federal highway: M-6 Caspian, 300 m.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$2M

Construction of light rail lines (ID 11.37)

NPV
IRR
РВР
- - 168 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$2M

Construction of warehouse complexes for the storage of dry materials (ID 6.19)

NPV
IRR
РВР
$1M 37,2% 62 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of warehouses. This project involves the construction of warehouses for the storage of cement and finished products of other dry building mixtures. The project offers rooms that meet the requirements for humidity, temperature of storage of mixtures.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 1 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$1M

Construction of new transfer hubs (ID 10.8)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The area of ​​most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.

The construction of technological zones of TPU will be carried out by the investor with subsequent transfer to the city. For TPU projects with separated technological and commercial facilities, the construction of the technological part will be financed from funds received from the sale of development rights to commercial real estate.

26 TPU projects were raffled off. As part of the implementation of these TPU projects, investors will build about 2.0 million square meters. m of total area of ​​real estate objects. The projected volume of private investment may amount to about 160.0 billion rubles.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$9B

مكان البيع

Moscow

التكلفة الإجمالية للمشروع

$9B

Fruit storage construction (ID 17.6)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a modern fruit storage facility for fruit storage

دعم البنية التحتية:

1. Power: 8 MW;
2. Water: 6 m3/h;
3. Sewage: 6 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-2, Crimea.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$5M

Construction of a distribution center (ID 17.10)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Organization of industrial real estate objects on the territory of the Tula region (distribution center, production and logistics complex, container hub).

دعم البنية التحتية:

1. Power, MW 12:
2. Water, m3/hour:20 ;
3. Sewage, m3/hour: 20 ;
4. Gas, m3/hour: 15 ;
5. The nearest federal highway: M-4, Don.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$40M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$40M

Creation of an industrial aquaculture cluster (ID 11.24)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky district

دعم البنية التحتية:

1. The nearest federal highway: A-107 (17 km), A-113 (17 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$61M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$61M

Construction of a goat farm (ID 11.26)

NPV
IRR
РВР
- - 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a goat farm with 6,400 milking goats in Shchelkovo district
Main consumers are milk processing plants in Moscow and the Moscow Oblast (~4 million tonnes/year).

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,5M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$13,5M

Construction of a plant protection center (ID 11.29)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Market launch of competitive, highly effective products

Field trials of new preparations, evaluation of active ingredients' efficiency, including biological, ecological, and chemical crop protection agents, and new preparative forms

Kashir district

دعم البنية التحتية:

1. Power: 0,15 MW;
2. Water: 2 m3/h;
3. Sewage: 2 m3/h;
4. Gas: 0,3 m3/h;
5. The nearest federal highway: M-4 (6 km), M-6 (6,2 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$9M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$9M

Establishment of an advanced milk processing production facility (ID 11.30)

NPV
IRR
РВР
- 19,5% 120 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.

دعم البنية التحتية:

1. Power: MW: 380/220 W is needed;
2. Water: m3/h: hot water - 0,5 and cold water - 9;
3. Sewage: 9,5 m3/h;
4. The nearest federal highway: A-108, A-107, A-104, P-113.

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$6,4M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$6,4M

Construction of a robotised dairy farm (ID 6.26)

NPV
IRR
РВР
$0,12M 16,04% 96 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a robotised dairy farm
The Robotised Dairy Farm will utilise the high genetic potential of cattle to ensure a high level of productivity, the safety of breeding stock, and effective disease prevention.

دعم البنية التحتية:

A milking module with free range will be used. A shelter with straw bedding will be built to house the animals. The calves will be housed in special barns.

فترة التنفيذ

11 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2,5M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$2,5M

Construction of a cattle farm (ID 6.27)

NPV
IRR
РВР
$200K 16,95% 88 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a cattle farm

The main area of specialisation in agricultural production is meat stockbreeding. The project uses cow-calf technology. The daily weight gain is 1–1.2 kg. The fattening period is 6–8 months. The sale weight of calves is 250-280 kg.

فترة التنفيذ

6 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$400K

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$400K

Construction of a food processing plant (ID 6.18)

NPV
IRR
РВР
$220K 24% 68 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of food products, a milk processing plant

The project will produce dairy food products. The main products are milk, cheese, cottage cheese, yogurt, butter, and sour cream.

دعم البنية التحتية:

1. Power: available;
2. Water: available;
3. Sewage: available;
4. Gas: available;
5. The nearest federal highway: M-3 (40 km)

فترة التنفيذ

6 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,3M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$1,3M

Creation of a complex for the production of cow and buffalo milk (ID 11.19)

NPV
IRR
РВР
$21M 5,4% 156 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$66,2M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$66,2M

Creation of a rabbit breeding farm (ID 2.1)

NPV
IRR
РВР
$4M 10,3% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the construction of a working rabbit farm with 18 fattening and rearing houses with a capacity of 1,430 females. 

دعم البنية التحتية:

1. Power: connection point at a distance of 100 m;
2. Water: connection point at a distance of 100 m;
3. Gas: connection point at a distance of 100 m.

فترة التنفيذ

9 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$17M

مكان البيع

Bryansk Oblast

التكلفة الإجمالية للمشروع

$17M

Establishment of a gas processing facility (ID 4.5)

NPV
IRR
РВР
- - 10 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Methanol production

دعم البنية التحتية:

1. Gas, MW: 12.14 MVA;
2. Water, m3/hour: 1 thousand cubic meters per day;
3. The nearest federal highway: P194 "Voronezh-Ostrogozhsk-Rossosh-Kantemirovka" at a distance of 2.1 km.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1B

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$1B

Construction of a polymer processing plant (ID 6.4)

NPV
IRR
РВР
$2M 21% 54 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a plant for the production of plastic products.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 17 km.

فترة التنفيذ

5 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$10M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$10M

Construction of a polymer processing plant (ID 6.5)

NPV
IRR
РВР
$7M 19% 73 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a polymer processing plant.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 900 m.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$6M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$6M

Construction of a polymer processing plant (ID 6.6)

NPV
IRR
РВР
$648K 22% 75 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a plant for the production of woven packaging (raffia).

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.4 km.

فترة التنفيذ

14 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$1M

Construction of a polymer processing plant (ID 6.7)

NPV
IRR
РВР
$21M 19% 80 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a polymer processing plant.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 900 m.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$20M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$20M

Construction of a polymer processing plant (ID 6.8)

NPV
IRR
РВР
$2M 19% 85 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a plant for the production of polymer fibers.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 17 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$2M

Construction of a polymer processing plant (ID 6.10)

NPV
IRR
РВР
$18M 19% 90 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project involves the construction of a plant for the production of BOPP membraine liner.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.7 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$16M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$16M

Construction of a polymer processing plant (ID 6.11)

NPV
IRR
РВР
$2M 19% 83 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a plant for the production of polyethylene film.

دعم البنية التحتية:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.4 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$2M

Organization of production of synthetic resins (ID 5.6)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Establishment of an enterprise for the production of synthetic resins.

دعم البنية التحتية:

1. Power, MW: 20;
2. Water, m3/hour: 60;
3. Gas, m3/hour: 32 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

فترة التنفيذ

7 years

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$10M

مكان البيع

Ivanov Oblast

التكلفة الإجمالية للمشروع

$10M

Dairy farming and milk production (single-cycle farm-complex) (ID 16.3)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Investment project for the construction of three dairy complexes (farms) with a total herd size of up to 10,000 cows, as well as a milk processing plant

Sources of capital investment: own and borrowed funds raised by the company

Creation of at least 600 employment positions, including about 360 at all farms and 240 at the dairy processing plant

فترة التنفيذ

40 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$162,2M

مكان البيع

Tver Oblast

التكلفة الإجمالية للمشروع

$162,2M

Construction of a dairy farm (ID 17.14)

NPV
IRR
РВР
- - 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a dairy farm

دعم البنية التحتية:

1. Power: 8 MW;
2. Water: 9 m3/h;
3. Sewage: 9 m3/h;
4. Gas: 6 m3/h;
5. The nearest federal highway: M-4 "Don", M-2 "Crimea Highway".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$27M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$27M

Construction of a plant for advanced processing of coarse grains for the production of amino acids (ID 17.15)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Project for the construction of a plant for the deep processing of coarse grains to produce amino acids and other functional additives for the agricultural and food industries

دعم البنية التحتية:

1. Power: 9 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$39,2M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$39,2M

Construction of an acetic acid plant (ID 17.20)

NPV
IRR
РВР
- - 96 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of acetic acid by fermentation and chemical processing of products from destructive distillation of wood

دعم البنية التحتية:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$40,5M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$40,5M

Creation of a cattle farm (ID 17.22)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The investment project aims to increase the production of livestock products (milk and meat) through the construction of closed-type farms with year-round stabling of cattle.

دعم البنية التحتية:

1. Power: 9 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$4M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$7M

Construction of an extraction plant for processing soybean and rapeseed (ID 17.23)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of an extraction complex for processing soybean and rapeseed

دعم البنية التحتية:

1. Power: 14 MW;
2. Water: 15 m3/h;
3. Sewage: 15 m3/h;
4. Gas: 9 m3/h;
5. The nearest federal highway: M-4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$54M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$54M

Construction of a line elevator with grain cleaning and drying equipment (ID 17.29)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project is aimed at building a modern linear elevator with a storage capacity of 100,000 tonnes, including grain cleaning and drying equipment. The maximum investment amount is $4.05 million. The project is expected to create 45 employment placements.

دعم البنية التحتية:

1. Power: 10 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$4M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$4M

Construction of a sugar beet processing plant (ID 17.34)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a sugar beet processing complex

دعم البنية التحتية:

1. Power: 8 MW;
2. Water: 11 m3/h;
3. Sewage: 11 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$11M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$11M

Construction of a horticultural processing plant (ID 17.40)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a horticultural processing complex.

دعم البنية التحتية:

1. Power: 2 MW;
2. Water: 9 m3/h;
3. Sewage: 9 m3/h;
4. Gas: 2 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$55,4M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$55,4M

Construction of a congress and exhibition complex (ID 11.38)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilities

دعم البنية التحتية:

1. Power: 32,93 MW required;
2. Water: m3/h: 1,553 m3/day required;
3. Sewage: m3/h: 1467 m3/day required;
4. Gas m3/h: 15500 m3/h required;
5. The railway line: "Krasnogorsk-Khimki-Sheremetyevo" LRT projected station is planned;
6. The nearest federal highway: access to the M11, International Route is planned.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$676M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$676M

Organization of production of products based on surfactants (ID 5.5)

NPV
IRR
РВР
- 4% 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

An enterprise for the manufactoring of products based on surfactants is being created. The main products are detergents and cleaning products, laundry and toilet soap, personal hygiene products.

دعم البنية التحتية:

1. Power: 20 MW;
2. Water: 60 m3/h;
3. Gas 35 Gcal/hour;
4. Inventory of branch railway line;
5. The nearest federal highway M-7 (100 km):

فترة التنفيذ

16 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$6M

مكان البيع

Ivanov Oblast

التكلفة الإجمالية للمشروع

$6M

Construction of a plant for the production of carbamide (ID 17.12)

NPV
IRR
РВР
- - 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The production of urea (urea) is a chemical compound, carbonic acid diamide. White crystals, soluble in polar solvents (water, ethanol, liquid ammonia).

دعم البنية التحتية:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-2 Crimea:

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$270M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$270M

Establishment of a plant for the production of components for composite materials (ID 17.30)

NPV
IRR
РВР
- - 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of small-tonnage chemical production of components for high-tech polymer composite materials. Production of phthalonitriles. Binders based on phthalonitrile resins.

دعم البنية التحتية:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage:7000 m3/h;
4. Gas: 100 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-4 Don (1 km):

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$2M

Establishment of production of plastic products (ID 17.33)

NPV
IRR
РВР
- - 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Plant for the production of plastics using natural or synthetic polymers.

دعم البنية التحتية:

1. Power: 50 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-2, Crimea:

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$20M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$20M

Construction of a plant for the production of monoethylene glycol (ID 17.37)

NPV
IRR
РВР
- - 36 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Production of monoethylene glycol MEG-300

دعم البنية التحتية:

1. Power: 30 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway: N4 "Don".

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$381M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$381M

Construction of the “Space City” theme park (ID 6.24)

NPV
IRR
РВР
$170K 24,3% 61 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a theme park on a 17,000 sq m land area. Estimated number of visits - 200 people/day.

دعم البنية التحتية:

The area of the water park is 3000-5000 sq m

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$12M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$12M

Voronezh Heat SupplyNuclear Power Plant area development (ID 4.3)

NPV
IRR
РВР
- - 3,5 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a modern multifunctional entertainment and business center on the basis of the buildings of the frozen Voronezh Heat Supply Nuclear Power Plant.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$3M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$3M

Construction of a methanol plant (ID 17.39)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a methanol plant

دعم البنية التحتية:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. The nearest federal highway: M-2 "Crimea" M-4 "Don"

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$252M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$252M

Construction of congress and exhibition, hotel, trade and entertainment infrastructure facilities (ID 11.2)

NPV
IRR
РВР
- - 5 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure. 

دعم البنية التحتية:

1. The nearest federal highway: M-4 "Don Highway", A-105, A-107, M-2

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5,1B

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$5,1B

Creation of a water health-resort SPA complex (ID 4.26)

NPV
IRR
РВР
- - 3,5 years

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The implementation of the water health-resort SPA complex project will increase the load on the existing facilities of the hospitality industry; new sites of tourist interest will be created, localized in one area in proximity to the urban agglomeration, the international airport, and the M-4 "Don" highway.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$135M

مكان البيع

Voronezh Oblast

التكلفة الإجمالية للمشروع

$135M

Creation of a multifunctional hotel complex (ID 17.2)

NPV
IRR
РВР
- -

الهدف من المشروع

7,2 years

وصف موجز وفكرة

The creation of a multifunctional five-star hotel complex.

The complex will include a hotel, a restaurant, a bar with roof access, a fitness club, a high-class spa center, bank offices, parking lots.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$20,3M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$20,3M

Recreational theme park (ID 11.27)

NPV
IRR
РВР
- - 144 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".

دعم البنية التحتية:

1. Power: MW, at the border;
2. Water: m3/h, at the border;
3. Sewage: m3/h, at the border;
4. Gas: m3/h, at the border;
5. The railway line: Shmatovo railway station (1.6 km);
6. The nearest federal highway: M-4 "Don" (15.1 km).

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$92M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$11M

Construction of a hotel in a ski complex (ID 11.31)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.

دعم البنية التحتية:

1. Power: MW; 10 kV own independent transmission line, provides full power supply to the resort;
2. Water: m3/hour; 560 m3/day own water intake for domestic drinking water supply;
3. Sewage: m3/h; 200 m3/day own treatment facilities for domestic wastewater;
4. Gas: 1,08 m3/h;
5. The nearest federal highway: 45.0 km away from MKAD (The Moscow Automobile Ring Road), and 7.0 km away from the "Moscow-Dubna" highway.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$5M

Manor restoration with adaptations to the chosen function of the site (ID 11.36)

NPV
IRR
РВР
-

وصف موجز وفكرة

Restoration of a cultural heritage site with adaptation to the chosen function of the site.

دعم البنية التحتية:

1. Power: available;
2. The nearest federal highway: M-5 "Ural Highway"(6 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$2M

Creation of an all-season multifunctional, eco-educational, and recreational tourist complex (ID 11.39)

NPV
IRR
РВР
$13M 56% 44,3 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:
-five-star "Zoo-Safari" style hotel with panoramic glazing;
-a glass multi-hall restaurant;
- "Zoo Water Park" with a fitness and spa center in a glass building with a similar congress center;
- "The International Children's Academy of Ecology and Zoology"
- and other infrastructure facilities of the modern tourism industry
"The International Children's Academy of Ecology and Zoology, located near Moscow Safari Park, will contribute to the ecological and patriotic education of the youth.

فترة التنفيذ

27 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$16,4M

مكان البيع

Moscow Oblast, Chekhov district, Meshcherskoye area

التكلفة الإجمالية للمشروع

$16,4M

Preservation project for a cultural heritage object (ID 6.22)

NPV
IRR
РВР
$1,2M 25,35% 82 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The purpose of the project is the reconstruction of the manor into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region and the proximity of the Moscow Oblast, the expected number of visitors is at least 20,000 people per year.

دعم البنية التحتية:

1. Power: available;
2. Water: available;
3. Sewage: available;
4. Gas: available;
5. The nearest federal highway: A-108 highway

فترة التنفيذ

33 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$2M

Construction of a tourism and hotel complex (ID 6.23)

NPV
IRR
РВР
$0,3M 21,45% 98 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Renovation of the manor
The complex will be used to accommodate the staff of the existing residents of the "Vorsino" Industrial Park and the special economic zone of industrial and production type "Kaluga" Borovskaya site, as well as to promote tourism in the region.

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$2M

Construction of a plant for the production of composite cylinders (ID 17.41)

NPV
IRR
РВР
- - 54 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Establishment of the production of high-pressure composite cylinders.

دعم البنية التحتية:

1. Power, MW: 100,
2. Water: m3/hour: 1000;
3. Sewage: m3/hour: 7000;
4. Gas: m3/hour: 1000;
5. Inventory of branch railway line
6. The nearest federal highway: M-4 Don (1 km)

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$41M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$41M

Complex for the production of nitric acid and ammonium nitrate (ID 17.43)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a complex for the production of nitric acid with a capacity of 270 thousand tons per year and ammonium nitrate with a capacity of 340 thousand tons per year.

دعم البنية التحتية:

1. Power, MW: 20,
2. Water: m3/hour: 100;
3. Sewage: m3/hour: 100;
4. Gas: m3/hour: 450;
5. Inventory of branch railway line
6. The nearest federal highway: M-2 Crimea

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$93M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$93M

Creation of a complex for the production of ammonia and carbamide (ID 17.44)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of an ammonia production complex with a capacity of 525 thousand tons per year and carbamide with an output of 700 thousand tons per year.

دعم البنية التحتية:

1. Power, MW: 15,
2. Water: m3/hour: 100;
3. Sewage: m3/hour: 100;
4. Gas: m3/hour: 450;
5. Inventory of branch railway line
6. The nearest federal highway: M-2 Crimea

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$551M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$551M

Creation of a year-round “car camping” area (ID 17.13)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms. The concept of the project aims to preserve the area and, at the same time, create a comfortable setting for outdoor recreation at all times of the year.

دعم البنية التحتية:

1. Power: 9 MW;
2. Water: 17 m3/h;
3. Sewage: 17 m3/h;
4. Gas: 11 m3/h;
5. The nearest federal highway: M-4 "Don"

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,5M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$23M

Construction of a complex for the production of ammonia and carbamide (ID 17.45)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The complex of ammonia and carbamide AMKAR-1400, manufacturing productivity estimates 3000 tons of ammonia and 4200 tons of carbamide per day. The project is directed at increasing the export capacity of Tula Oblast, production release with higher added value cost.

دعم البنية التحتية:

1. Power, MW: 25;
2. Water: m3/hour: 80;
3. Sewage: m3/hour: 80;
4. Gas: m3/hour: 340;
5. The nearest federal highway: M-4 Don.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$847M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$847M

Creation of a “car camping” area (ID 17.21)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms.

دعم البنية التحتية:

1. Power: 6 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-4 "Don"

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$5,4M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$12,1M

Reconstruction of a health resort complex (ID 17.27)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The reconstruction of the health resort complex Sanatorium "Krainka" involves the modernisation of infrastructure, improvement of accommodation facilities, improvement of the adjoining territory, and an increase of the number of available accommodation places.

دعم البنية التحتية:

1. Power: 8 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway"

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$13,5M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$13,5M

Construction of a chain hotel (ID 17.32)

NPV
IRR
РВР
- - 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a 150-bed 2 or 3-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".

دعم البنية التحتية:

1. Power: 3 MW;
2. Water: 2 m3/h;
3. Sewage: 2 m3/h;
4. Gas: 4 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway", M-4 "Don"

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$8,1M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$8,1M

Construction of an international chain hotel (ID 17.38)

NPV
IRR
РВР
- - 72 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a 750-bed 5-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".

دعم البنية التحتية:

1. Power: 6 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 9 m3/h;
5. The nearest federal highway: M-4 "Don"

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$40,5M

مكان البيع

Tula Oblast

التكلفة الإجمالية للمشروع

$40,5M

Children’s recreation center (ID 6.20)

NPV
IRR
РВР
$912K 15% 76 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of infrastructure for food, accommodation and active recreation with a year-round stay.

دعم البنية التحتية:

1. The nearest federal highway: M-3, 7 km.

فترة التنفيذ

16 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,3M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$1,3M

Amusement park (ID 11.11)

NPV
IRR
РВР
$85M 23% 101 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.

دعم البنية التحتية:

1. Water: 10401 m3/h;
2. Sewage: 10401 m3/h;
3. Gas: 1214000 m3/h;
4. The nearest federal highway: Dmitrovskoe highway, 17 km from Moscow Ring Road.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$149M

مكان البيع

Moscow Oblast

التكلفة الإجمالية للمشروع

$149M

Organization of geotextiles production (ID 5.8)

NPV
IRR
РВР
$4,4M 18% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

An enterprise for the production of geotextiles.

دعم البنية التحتية:

1. Power: 8 MW;
2. Water: 550 m3/h;
3. Sewage: 160 m3/h;
4. Gas: 40000 m3/h;
5. Railway: on request;
6. The nearest federal highway: M-7, 100 km.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$32M

مكان البيع

Ivanovo Oblast

التكلفة الإجمالية للمشروع

$32M

Production of sanitary ware products from ceramic masses (ID 6.29)

NPV
IRR
РВР
$3,4M 20,15% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a factory for the production of sanitary ware products from raw materials extracted in the Ulyanovsk region. The main products are sanitary ware made of ceramic masses.

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$30M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$30M

Factory for the production of dosage forms (ID 6.16)

NPV
IRR
РВР
$8M 53% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a factory for the production of finished dosage forms. The number of jobs created is 225.

دعم البنية التحتية:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3 (6 km), A-108 (4 km).

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$38M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$38M

Mini excavators production (ID 5.4)

NPV
IRR
РВР
$1,7M 21% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation of an enterprise for the mini excavator's production.

دعم البنية التحتية:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. The nearest federal highway: M-7, 100 km.

فترة التنفيذ

4 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$1,6M

مكان البيع

Ivanovo Oblast

التكلفة الإجمالية للمشروع

$1,6M

Construction of a factory for the automotive components production (ID 6.1)

NPV
IRR
РВР
$77M 53% 60 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project provides for the construction of a factory for the production of automotive components for Volkswagen, Skoda, Volvo, Renault, Mitsubishi car brands.

دعم البنية التحتية:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 6 km.

فترة التنفيذ

12 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$18M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$18M

Construction of a woodworking factory (ID 16.1)

NPV
IRR
РВР
- - -

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Creation and development of a modern timber industry enterprise - a woodworking factory. The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging transport.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$9,4M

مكان البيع

Tver Oblast

التكلفة الإجمالية للمشروع

$9,4M

Production of MDF boards (ID 7.1)

NPV
IRR
РВР
$17M 33,6% 57,6 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.

دعم البنية التحتية:

1. Power: 250 MW and 4,934 MW;
2. Water: up to 20 m3/h, the possibility of artesian wells construction;
3. Sewage: construction of local cleaning facilities.

فترة التنفيذ

18 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$33M

مكان البيع

Kostroma Oblast

التكلفة الإجمالية للمشروع

$33M

The program for creating a new production of grinding balls (ID 3.3)

NPV
IRR
РВР
$5,2M 25% 48 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The main goal of the project is to create a new production facility equipped with modern, energy-efficient devices to make a profit through the sale of manufactured products: steel grinding balls with a diameter of 30-100 mm.

دعم البنية التحتية:

1. Power: 13 MW;
2. Water: 71,67 m3/h;
3. Sewage: 71,67 m3/h;
4. Gas: 2000 m3/h;
5. The nearest federal highway: M-7, 0,1 km.

فترة التنفيذ

16 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$14M

مكان البيع

Vladimir Oblast

التكلفة الإجمالية للمشروع

$14M

Construction of a plant for the production of cast iron and steel casting (ID 6.15)

NPV
IRR
РВР
$4,4M 14,48% 120 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of cast iron and steel: plumbing casting (plumbing and accessories), accessories for anchor-rail fastening, artistic casting.

دعم البنية التحتية:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 5,5 km.

فترة التنفيذ

24 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$432M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$432M

Construction of a plant for the production of radio and mobile communications (ID 6.17)

NPV
IRR
РВР
$4,4M 18,71% 84 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

Construction of a plant for the production of radio and mobile communications.

دعم البنية التحتية:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 1,5 km.

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$76M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$76M

Construction of a polymer processing plant (ID 6.9)

NPV
IRR
РВР
$1,5M 27% 59 months

الهدف من المشروع

Creation of a new production

وصف موجز وفكرة

The project is aimed at the construction of a thermoforming plant for products.

دعم البنية التحتية:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: М-3, 17 km.

فترة التنفيذ

11 months

مرحلة تنفيذ المشروع

Proposal

الحاجة إلى تمويل إضافي

$2M

مكان البيع

Kaluga Oblast

التكلفة الإجمالية للمشروع

$2M