IRR:
Investments:
Reset filters

About branch

Projects 210

Creation of the mud resort “Pokrovskoye” (ID 13.1)

15% $2B investments

Construction of a greenhouse complex (ID 4.16)

$90.48M investments

Creation of moisture retaining superabsorbent production (ID 4.15)

15.23% $0.44M investments

Creation of a biocoal plant (ID 4.12)

28.7% $2.25M investments

Construction of a plant for deep processing of grain (ID 4.14)

27.09% $270.72M investments

Inulin production (ID 4.13)

17.6% $19.3M investments

Creation of the mud resort “Pokrovskoye” (ID 13.1)

NPV
IRR
РВР
15 % 60 months

Objective of the project

The development of 124,000 m2 area to create the Pokrovskoye mud resort.

Brief description and idea

The development involves the construction of medical rehabilitation centers equipped with modern balneological equipment. Construction of infrastructure for living, entertainment, sports. Tourist routes - walking, cycling, horseback riding. Thematic museums - the museum of the writer Vasily Pavlovich Aksenov, the museum “History of Sapozhkovsky Muds”. The basis of rehabilitation is rare Sapozhkovsky medicinal acidic mud.

Infrastructure support:

Full compliance to the needs of the project.
The need for energy resources (electricity, natural gas, drinking water) is provided with sufficient capacity.

Implementation period

60 months

The need for additional funding

$2B

Place of implementation

Ryazan oblast

The total cost of the project

$2B

Construction of a greenhouse complex (ID 4.16)

NPV
IRR
РВР
$6.02M - 88 months

Objective of the project

Construction of a greenhouse complex

Brief description and idea

Greenhouses allow eliminate a seasonal character of work and grow various cultures all year round. At the same time, the most comfortable conditions are created not only for the growing of crops but also for the working personnel that looks after the plants.

Infrastructure support:

1. Power: up to 75 MW
2. Water supply:100 m3/h
3. Sewage: 100 m3/h
4. Gas: 75 m3/h
5. The railway line: 6.5 km away
6. The nearest federal highway: R-298, 34 km

Project implementation stage

Proposal

The need for additional funding

$90.48M

Place of implementation

Voronezh Oblast

The total cost of the project

$90.48M

Creation of moisture retaining superabsorbent production (ID 4.15)

NPV
IRR
РВР
$0.08M 15.23% 67 months

Objective of the project

Creation of moisture retaining superabsorbent production in Voronezh region

Brief description and idea

To effectively retain large volumes of water and nutritive elements in the soil, special products are used - superabsorbents. Taking into account the trend of climate change, the relevance of applying superabsorbent increases significantly.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 30 m3/h
3. Sewage: 30 m3/h
4. Gas: 60 m3/h
5. The railway line: 3 km away
6. The nearest federal highway: R-193, 13 km

Project implementation stage

Proposal

The need for additional funding

$0.44M

Place of implementation

Voronezh Oblast

The total cost of the project

$0.44M

Creation of a biocoal plant (ID 4.12)

NPV
IRR
РВР
$4.82M 28.7% 55 months

Objective of the project

Creation of a biocoal plant

Brief description and idea

Creation of the production of mobile lines for the processing of illiquid wood of any species, located at the place of formation of this wood, with its further cost-effective processing into the goods in demand on the market.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 47 m3/h
3. Sewage: 47 m3/h
4. Gas: 50 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: R-298, 69 km away

Project implementation stage

Proposal

The need for additional funding

$2.25M

Place of implementation

Voronezh Oblast

The total cost of the project

$2.25M

Construction of a plant for deep processing of grain (ID 4.14)

NPV
IRR
РВР
$385.53M 27.09% 66 months

Objective of the project

The goal of the project is construction of a plant for deep processing of grain with the emphasis on the production of food lysine in Voronezh region

Brief description and idea

Agriculture is interested in the development of the industry and the construction of new plants for deep processing of grain. This will allow to reduce the import of lysine and tryptophan, threonine and valine, gluten, glucose, natural sweeteners and bio-products.

Infrastructure support:

1. Power: up to 75 MW
2. Water supply: 280 m3/h
3. Sewage: 280 m3/h
4. Gas: 300 m3/h
5. The railway line: 3.5 km away
6. The nearest federal highway: R-298, 1 km away

Project implementation stage

Proposal

The need for additional funding

$270.72M

Place of implementation

Voronezh Oblast

The total cost of the project

$270.72M

Inulin production (ID 4.13)

NPV
IRR
РВР
$9.61M 17.6% 85 months

Objective of the project

Production of the prebiotic inulin

Brief description and idea

According to the estimates of world analytical agencies, the most promising area for the development of food industry is production of functional food.
Prebiotics are physiologically functional food ingredients in the form of substances, if systematically taken in the form of a preparation or as a part of food products, provide favourable influence on human body as a result of normalization of composition and/or biological activity of the normal intestinal microflora.
There is practically no market in Russia. Presently, domestic producers use mainly imported inulin. There is a necessity of import substitution and organization of own production of valuable food ingredients.

Infrastructure support:

1. Power: up to 75 MW
2. Water supply: 210 m3/h
3. Sewage: 210 m3/h
4. Gas: 180 m3/h
5. The railway line: 25 km away
6. The nearest federal highway: M-4, 10 km away

Project implementation stage

Proposal

The need for additional funding

$19.3M

Place of implementation

Voronezh Oblast

The total cost of the project

$19.3M

Construction of a year-round glamping (ID 4.11)

NPV
IRR
РВР
$0.28M 11.88% 52 months

Objective of the project

Construction of a year-round glamping in Voronezh region.

Brief description and idea

The year-round recreation center offers guests a comfortable stay away from the city. It is possible to have a calm and quiet rest in coisy and comfortable glampings, as well as an active leisure: bike rides, stand-up boards rides, participation in various events.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 1 m3/h
3. Sewage: 1 m3/h
4. Gas: 0.5 m3/h
5. The railway line: 100 m away
6. The nearest federal highway: R-298, 30 km away

Project implementation stage

Proposal

The need for additional funding

$0.91M

Place of implementation

Voronezh Oblast

The total cost of the project

$0.91M

Construction of a gas processing plant for the production of synthetic fuel (ID 4.10)

NPV
IRR
РВР
$411.91M 18.43% 71 months

Objective of the project

Deep processing of natural gas, significant reduction of hydrocarbon raw materials import and strengthening the energу independence of the country.

Brief description and idea

A gas processing plant is an industrial enterprise that processes natural or associated gas with the purpose of obtaining petrochemical products with high added value (base polymers, plastics, rubbers, sulfur, helium, dry gas, gasoline, diesel).

Infrastructure support:

1. Power: up to 75 MW
2. Water supply: 150 m3/h
3. Sewage: 150 m3/h
4. Gas: 3500 m3/h
5. The railway line: 10 km away
6. The nearest federal highway: M-4, 80 km away

Project implementation stage

Proposal

The need for additional funding

$3408.89M

Place of implementation

Voronezh Oblast

The total cost of the project

$3408.89M

Construction of a machine tool factory in Voronezh region (ID 4.9)

NPV
IRR
РВР
$8.13M 16.89% 80 months

Objective of the project

Import substitution and development of the machine tool industry in the Russian Federation.

Brief description and idea

The relevance of the project lies in the intention to improve the Russian economy, the growth of which will not occur without the powerful development of the machine tool industry, since this industry is "backbone".

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 50 m3/h
3. Sewage: 50 m3/h
4. Gas: 15 m3/h
5. The railway line: 500 m away
6. The nearest federal highway: R-298, 50 km away

Project implementation stage

Proposal

The need for additional funding

$23.07M

Place of implementation

Voronezh Oblast

The total cost of the project

$23.07M

Construction of a breeding and seed complex in Voronezh region (ID 4.8)

NPV
IRR
РВР
$2.29M 15.71% 61 months

Objective of the project

Development of the seed industry in Voronezh region and enhancing the food security of the region and the country.

Brief description and idea

The production of selected seeds allows farmers and large farms to obtain fruit-bearing fields even under the adverse conditions.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 50 m3/h
3. Sewage: 50 m3/h
4. Gas: 30 m3/h
5. The railway line: 250 m away
6. The nearest federal highway: M-4, 1.5 km away

Project implementation stage

Proposal

The need for additional funding

$12.45M

Place of implementation

Voronezh Oblast

The total cost of the project

$12.45M

Organization of canned vegetables and berries production in Voronezh region (ID 4.7)

NPV
IRR
РВР
$57.05M 85% 24 months

Objective of the project

Development of the production of canned vegetables and berries in Voronezh region, enhancing the food security in the region.

Brief description and idea

Organizaton of production: a line for canning cucumbers and tomatoes, a line for canning cabbage, production line for jams from honeysuckle, black current and apples.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 22 m3/h
3. Sewage: 22 m3/h
4. Gas: 280 m3/h
5. The railway line: 60 km away
6. The nearest federal highway: M-4, 100 m away

Project implementation stage

Proposal

The need for additional funding

$4.27M

Place of implementation

Voronezh Oblast

The total cost of the project

$4.27M

Construction of a compound feed plant in Voronezh region (ID 4.6)

NPV
IRR
РВР
$15.49M 25.69% 62 months

Objective of the project

Construction of a compound feed plant in Voronezh region.

Brief description and idea

The profitable implementation of this project on the territory of Voronezh region is due to the fact that the region occupies in the Central Federal District: 1st place in milk production, 2nd place on the number of kettle.

Infrastructure support:

1. Power: up to 75 MW
2. Water supply: 40 m3/h
3. Sewage: 40 m3/h
4. Gas: 250 m3/h
5. The railway line: 23 km away
6. The nearest federal highway: M-4, 150 m away

Project implementation stage

Proposal

The need for additional funding

$13.23M

Place of implementation

Voronezh Oblast

The total cost of the project

$13.23M

Potato cultivation in Voronezh region (ID 4.5)

NPV
IRR
РВР
$2.71M 40.34% 34 months

Objective of the project

Development of potato cultivation in Voronezh region, enhancing the food security in the region, creation of a competitive potato farm.

Brief description and idea

The implementation of the project assumes planting of proven varieties of potatoes on the traditionally used lands with storage and packing of this crop, as well as its sale. Potatoes are planned to be sold to the potato processing organizations (LLC Domfri, Voronezh region) and retail stores through the regional network.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 20 m3/h
3. Sewage: 20 m3/h
4. Gas: 1 m3/h
5. The railway line: 28 km away
6. The nearest federal highway: M-4, 35 km away

Project implementation stage

Proposal

The need for additional funding

$1.38M

Place of implementation

Voronezh Oblast

The total cost of the project

$1.38M

Construction of an aquapark on the territory of Petrovskaya embankment (ID 4.4)

NPV
IRR
РВР
$33.17M 24.47% 64 months

Objective of the project

Construction of an aquapark with the first and nowadays the only sports and entertainment complex with water slides and artificial wave at disposal, with year-round functioning.

Brief description and idea

The project is competitive on the market as there are no complexes of this type in the region today and the demand for the services remains unsatisfied. It is assumed that the main visitors to the aquapark will be residents and guests of the city.

Infrastructure support:

1. Power: up to 75 MW
2. Water supply: 400 m3/h
3. Sewage: 400 m3/h
4. Gas: 10 m3/h
5. The railway line: 4 km away
6. The nearest federal highway: M-4, 17 km away

Project implementation stage

Proposal

The need for additional funding

$32.29M

Place of implementation

Voronezh Oblast

The total cost of the project

$32.29M

Creation of a plant for the production of pharmaceutical substancies (ID 4.3)

NPV
IRR
РВР
$282.8M 38.82% 49 months

Objective of the project

Construction of a plant for the production of pharmaceutical substances from which medicines are made

Brief description and idea

Currently the share of foreign substancies comprises 80% of the total volume on the Russian market. In the conditions of sanctions pressure from the foreign states many foreign pharmaceutical companies ceased investment activities in our country. Although they did not officially refuse to supply vital drugs and ingredients for them, problems with shipment happened due to the broken logistics chains.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 20 m3/h
3. Sewage: 20 m3/h
4. Gas: 75 m3/h
5. The railway line: available
6. The nearest federal highway: 50 km away

Project implementation stage

Proposal

The need for additional funding

$144.51M

Place of implementation

Voronezh Oblast

The total cost of the project

$144.51M

Creation of a plant for the production of mineral fertilizers (ID 4.2)

NPV
IRR
РВР
$129.1M - 90 months

Objective of the project

Creation of highly efficient, export-oriented and competitive production of mineral fertilizers in Voronezh region

Brief description and idea

The implementation of this investment proposal is due to the growing demand for nitrogen fertilizers on a global scale as well as to the positive dynamics of price growth for the products of this group. The products planned for output are in demand in all regions of the world associated with the agricultural production.

Infrastructure support:

1. Power: up to 75 MW
2. Water supply: 200 m3/h
3. Sewage: 200 m3/h
4. Gas: 500 m3/h
5. The railway line: 15 km away
6. The nearest federal highway: M-4, 10 km away

Project implementation stage

Proposal

The need for additional funding

$1.18M

Place of implementation

Voronezh Oblast

The total cost of the project

$1.18M

Creation of glass production in Voronezh region (ID 4.1)

NPV
IRR
РВР
$12.28M 35.03% 44 months

Objective of the project

Construction of a plant for the production of glass bottles and jars in Voronezh region

Brief description and idea

The project assumes creation of glass containers intended for manufacturers of alcoholic, non-alcoholic, carbonated and non-carbonated drinks, for food manufacurers producing canned, sour-milk products, and for public consumption.

Infrastructure support:

1. Power: up to 5 MW
2. Water supply: 170 m3/h
3. Sewage: 170 m3/h
4. Gas: 192 m3/h
5. The railway line: 10 m away
6. The nearest federal highway: M-6, 2.5 km away

Project implementation stage

Proposal

The need for additional funding

$12.28M

Place of implementation

Voronezh Oblast

The total cost of the project

$6.53M

Construction of a greenhouse complex (ID 12.32)

NPV
IRR
РВР
- 8,11% 92 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes the construction of a greenhouse complex with the area of 5 hectares. The aim of the project is to create the production of greenhouse vegetables (cucumbers, tomatoes) on a mineral substrate in year-round greenhouses with the use of additional illumination system on the territory of Oryol region.

Infrastructure support:

1. Power: 5 MW
2. Water: 2100 m3/h
3. Gas: 13 000 m3/h
4. The railway line: 52 km away
5. The nearest federal highway: М2 - 60 km away

Project implementation stage

Proposal

The need for additional funding

$24M

Place of implementation

Oryol Oblast

The total cost of the project

$24M

Construction of a plant for precision alloys production (ID 12.31)

NPV
IRR
РВР
- 10,6% 29 months

Objective of the project

Creation of a new production

Brief description and idea

Organization of the production of bars made of precision alloys in small batches with a quality exceeding domestic and world analogues in the city of Mtsensk.

Infrastructure support:

1. Power: 1.5 MW
2. The railway line: 1.5 km away
3. The nearest federal highway: М2 - 7 km away

Project implementation stage

Proposal

The need for additional funding

$0.2M

Place of implementation

Oryol Oblast

The total cost of the project

$0.2M

Construction of a mill (ID 12.30)

NPV
IRR
РВР
- 19.2% 54 months

Objective of the project

Creation of a new production

Brief description and idea

Сonstruction of a mill grinding 2 types of grain with productivity of 150 tons per day

Infrastructure support:

1. Power: 1.55 MW
2. Water: 10 m3/h
3. Gas: 1 000 m3/h
4. The railway line: 100 m away
5. The nearest federal highway: М2 - 90 km away, М4 - 110 km away

Project implementation stage

Proposal

The need for additional funding

$5.8M

Place of implementation

Oryol Oblast

The total cost of the project

$5.8M

Construction of a potato storage facility (ID 12.29)

NPV
IRR
РВР
- 19.2% 54 months

Objective of the project

Creation of a new production

Brief description and idea

The object is a building for potatoes storage. Technology of potatoes storage "APH Group" (Netherlands) is based on Omnivent ventilation equipment (Netherlands) and Munters air humidification system (Sweden). All components of the vegetables storage process are compurterized and automated. The APH Group company is a provider of technological equipment and carries out its installation and comissioning works (turnkeys). The maximum one-time volume of stored products is 8,100 tons.

Infrastructure support:

1. Power: 0.178 MW
2. Water: 0.5 m3/h
3. Sewage: 0.28 m3/h
4. The railway line: 1.5 km away
5. The nearest federal highway: М2 - 2 km away

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Oryol Oblast

The total cost of the project

$2M

Construction of a plant for the production of glass products (ID 12.28)

NPV
IRR
РВР
- 35% 36 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes construction of a plant for the production of glass products on the territory of the special economic zone Oryol.

Infrastructure support:

1. Power: 4.7 MW
2. Water: 37 m3/h
3. Sewage: 66 m3/h
4. Gas: 6 260 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: М2 - 5 km away

Project implementation stage

Proposal

The need for additional funding

$75M

Place of implementation

Oryol Oblast

The total cost of the project

$75M

Organization of cold-pressed sunflower, rapeseed and soybean oils production (ID 12.27)

NPV
IRR
РВР
- 19.2% 53 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a modern factory for the production of vegetable oils (sunflower, soybean, rapeseed).

Infrastructure support:

1. Power: 0.85 MW
2. The railway line: 1,5 km away
3. The nearest federal highway: М2 - 55 km away, М4 - 50 km away

Project implementation stage

Proposal

The need for additional funding

$6.1M

Place of implementation

Oryol Oblast

The total cost of the project

$6.1M

Construction of a Data centre (ID 12.26)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes construction of a Data centre (Data Processing Centre - DPC). It is created with the purpose of processing and storing of huge amounts of information. The project is implemented taking into account the requirements towards data backup, stability and security of storage and processing of data.

Infrastructure support:

1. Power: 1 MW
2. Water: 5 m3/h
3. Sewage: 5 m3/h
4. The railway line: 1.5 km away
5. The nearest federal highway: М2 - 8 km away

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Oryol Oblast

The total cost of the project

$10M

Electronics production (ID 12.25)

NPV
IRR
РВР
- 37% 32 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes production of consumer electronics and engineering networks. Production line consists of: a line for the production of printed circuit assemblies, a line for washing and varnishing, a selective soldering oven, a vapor-phase oven with a vacuum.

Infrastructure support:

1. Power: 5 MW
2. Gas: 500 m3/h
3. The railway line: 2 km away
4. The nearest federal highway: М2 - 3 km away

Project implementation stage

Proposal

The need for additional funding

$101.7M

Place of implementation

Oryol Oblast

The total cost of the project

$101.7M

Organization of block-containers and switchboard equipment production (ID 12.24)

NPV
IRR
РВР
- 73.4% 38 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes creation of block-containers and switchboard equipment production with the highest possible level of factory readiness, with mounted technological equipment and engineering systems.

Infrastructure support:

1. Power: 5 MW
2. Gas: 500 m3/h
3. The railway line: 1 km away
4. The nearest federal highway: М2 - 8.5 km away

Project implementation stage

Proposal

The need for additional funding

$0.25M

Place of implementation

Oryol Oblast

The total cost of the project

$0.25M

Reconstruction of the Hotel Intourist-Yelets (ID 9.6)

NPV
IRR
РВР
$3.7M 18% 6.5 years

Objective of the project

Modernization

Brief description and idea

The project assumes reconstruction of the Hotel Intourist-Yelets:
year of construction - 1988, number of rooms - 136, territory of the hotel - 6,042 square meters

Infrastructure support:

1. Power: 0.15 MW
2. Water: 50 m3/h
3. Sewage: 50 m3/h
4. Gas: 500 m3/h
5. The railway line: available: 0 km
6. The nearest federal highway: 15 km

Project implementation stage

Proposal

The need for additional funding

$13.3M

Place of implementation

Lipetsk Oblast

The total cost of the project

$13.3M

Agro-industrial complex for the production of goat milk and dairy products (ID 9.5)

NPV
IRR
РВР
$5.4M 24% 3.75 years

Objective of the project

Creation of a new production

Brief description and idea

Creation of an agro-industrial complex for the production of goat milk and dairy products in Lipetsk region

Infrastructure support:

1. Power: 0.4 MW
2. Water: 20 m3/h
3. Sewage: 20 m3/h
4. Gas: 50 m3/h

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$5.8M

Place of implementation

Lipetsk Oblast

The total cost of the project

$5.8M

Construction of a vegetable and fruit chips plant (ID 1.26)

NPV
IRR
РВР
$0.6M 21.53% 87.9 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of vegetable and fruit chips with a production capacity of 40 tons per year

Infrastructure support:

1. Power, MW: source 1 - substation 35/10 kW "Kochetovka", power supply using a temporary scheme - 630 kW, ТУ №5-199/20284964 from 19.12.2013.
2. Water, m3/h: possible by drilling of wells. To provide 125 m3/h it is necessary to drill 6 water wells with the capacity of 25 m3/h each (5 working and 1 reserve).
3. Gas, m3/h: source - gas distribution station Malye Mayachki (P 0,6 mPa), underground gas pipline; free peak load - 2000-6700 m3/h; gas pipeline with the maximum hourly consumption 6600 m3/h, ТУ №7566 from 29.11.2013.
4. Federal highway: asphalt road next to the site.

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$1.7M

Place of implementation

Belgorod Oblast

The total cost of the project

$1.7M

Construction of a ready-made frozen pasta factory (ID 1.25)

NPV
IRR
РВР
$0.7M 19.8% 59 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes construction of a complex for the production of ready-made frozen pasta with a maximum production capacity of 1,200 tons per month in the village Belovskoe in Belgorod region. Planned commissioning date is March, 2023. Creation of 29 working places with an average salary of 33,4 thousand rubles. Manufacture is planned to be located on the territory of land plot with the cadastral number 31:15:0904001:3793, address: Belgorod region, village Belovskoe, Magistralnaya street, № 16в. In the production of pasta only natural, environmentally friendly ingredients will be used - flour, eggs, spices and water. There is no need to use any preservatives, flavourings and colorants - the production and storage technology allows to save mineral-vitamin complex for 2 years.
Import substitution. Manufactured product is not a novelty, in addition to the fact that it has a large and established sales market in Europe, Russian customers are familiar with it as this product has been imported to Russia for more that 3 years.
Development of the food industry in Belgorod region with the launch of a product that has no Russian analogue on the market. The company plans to concentrate sales in the following segments: HoReCa - 50%, municipal institutions (hospitals, schools, pre-school institutions etc.) - 20%, catering companies - 30%.

Infrastructure support:

1. Power, MW: 1 MW
2. Water, m3/month: 400 m3/month
3. Sewage, m3/month: 400 m3/month
4. Gas, m3/h: 60 m3/h

Implementation period

14 months

Project implementation stage

Proposal

The need for additional funding

$13.9M

Place of implementation

Belgorod Oblast

The total cost of the project

$13.9M

Construction of a knitwear fabric (ID 16.6)

NPV
IRR
РВР
- 21% 92 months

Objective of the project

Creation of a new production

Brief description and idea

Creation and development of a modern textile enterprise. The project assumes construction of a knitwear factory, purchase of equipment.

Project implementation stage

Proposal

The need for additional funding

$266.7M

Place of implementation

Tver Oblast

The total cost of the project

$266.7M

Construction of a modern dairy complex (ID 5.12)

NPV
IRR
РВР
$42.7M 33% 168 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a modern highly efficient dairy complex with automated processes of manufacture management, with a full processing cycle starting from receiving of raw milk to the shipment of finished product, corresponding to all requirements of technical regulations of the Customs Union, current technological regulatory legal acts, State Standards, Sanitary-epidemiological rules and norms, food and dairy product safety programs and sanitary requirements for the design of dairy industry enterprises.
Finished product at the initial stage - dry milk skimmed by the technology low-heat and butter. In the future - production of whole and fermented milk products - drinking milk, drinking cream, baked milk, fermented baked milk, sour cream, ice cream.

Project implementation stage

Proposal

The need for additional funding

$35M

Place of implementation

Ivanovo Oblast

The total cost of the project

$35M

Creation of microcalcite production (ID 14.18)

NPV
IRR
РВР
$6.7M 55% 35 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of modern production of microcalcite from calcium carbonate for the needs of enterprises of Russian Federation engaged in the production of plastics, polymers, paints and varnishes, linoleum, cable plastic, rubber products, sealants and drilling fluids

Infrastructure support:

1. Power: 3.86 MW
2. Gas: 1,911 m3/h
3. The railway line: 82 km away

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Smolensk Oblast

The total cost of the project

$5M

Manufacture of prosthetic and orthopedic products (ID 14.17)

NPV
IRR
РВР
$30.8M 23% 82 months

Objective of the project

Creation of a new production

Brief description and idea

Production of endoprostheses of the knee and hip joints with the potential of 30-40% of imported goods substitution

Infrastructure support:

1. Power: 3.86 MW
2. Gas: 1,911 m3/h
3. The railway line: 82 km away

Implementation period

20 months

Project implementation stage

Proposal

The need for additional funding

$28.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$28.3M

Creation of a transport and logistics complex (ID 14.16)

NPV
IRR
РВР
$24.2M 29% 70 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a transport and logistics complex for 3,000-4,000 vehicles with arrangement of parking and storage places for transport, construction of warehouses and of a training and educational complex for employees

Infrastructure support:

1. Power: 4.54 MW
2. Gas: 37,100 m3/h
3. The railway line: 8 km away
4. The nearest federal highway: М1 - 9 km away

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$21.7M

Place of implementation

Smolensk Oblast

The total cost of the project

$21.7M

Creation of a high-tech coworking with IT specialization (ID 14.15)

NPV
IRR
РВР
$1.8M 23% 48 months

Objective of the project

Creation of a new production

Brief description and idea

Organization of an activity center for IT specialists (a single platform for collaborative work, an "idea generation" center) with the purpose of retaining existing and attracting new qualified personnel for IT companies in Smolensk region, with the option of buying out the cultural center "Youth" (city of Smolensk) for placement of specialists

Infrastructure support:

1. Power: 10.31 MW
2. Gas: 26,902 m3/h
3. The railway line: 2.5 km away
4. The nearest federal highway: М1 - 20 km away; P-120 - 8 km away

Implementation period

7 months

Project implementation stage

Proposal

The need for additional funding

$1.6M

Place of implementation

Smolensk Oblast

The total cost of the project

$1.6M

Costruction of a flax plant (ID 14.14)

NPV
IRR
РВР
$56.7M 23% 86 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a flax factory including a factory processing flax straw and a yarn factory. The factory will become a part of a flax cluster. The new production will be aimed at creating high quality competitive products with a focus on import substitution and export. Long and cottonized flax fiber, the most in demand on the market, will be used as a raw material for the production of yarn.

Infrastructure support:

1. Power: 4.53 MW
2. Gas: 4,947 m3/h
3. The railway line: 8 km away
4. The nearest federal highway: М1 - 3 km away

Implementation period

25 months

Project implementation stage

Proposal

The need for additional funding

$52.5M

Place of implementation

Smolensk Oblast

The total cost of the project

$52.5M

Construction of a factory for cultivating and processing of champignons (ID 14.13)

NPV
IRR
РВР
$19M 14% 90 months

Objective of the project

Creation of a new production

Brief description and idea

It is planned to build a factory for cultivating and processing of champignons on the territory of the state industrial park "Phoenix"

Infrastructure support:

1. Power: 4.53 MW
2. Water: 36,000 m3/h
3. Sewage: 36,000 m3/h
4. Gas: 26,902 m3/h
5. The railway line: 1 km away
6. The nearest federal highway: М1 - 20 km away; Р-120 - 8 km

Implementation period

90 months

Project implementation stage

Proposal

The need for additional funding

$15.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$15.3M

Organization of production of slab glued products from natural veneer (ID 14.12)

NPV
IRR
РВР
$2.5M 22% 78 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an enterprise specializing in deep processing of raw materials - wood for the manufacture of products in demand on the territory of the state industrial park "Phoenix"

Infrastructure support:

1. Power: 10.31 MW
2. Water: 36,000 m3/h
3. Sewage: 36,000 m3/h
4. Gas: 26,902 m3/h
5. The railway line: 1 km away
6. The nearest federal highway: М1 - 20 km away; Р-120 - 8 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$1.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$1.3M

Creation of pallet blanks production (ID 14.11)

NPV
IRR
РВР
$1.7M 35% 25 months

Objective of the project

Creation of a new production

Brief description and idea

Organization of manufacture specializing in deep processing of wood and the sale of manufactured products for export in order to make profit

Infrastructure support:

1. Power: 5.48 MW
2. Gas: 6 000 m3/h
3. The railway line: 74 km away

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$0.7M

Place of implementation

Smolensk Oblast

The total cost of the project

$0.7M

Construction of a complex for receiving, cleaning, drying and shipping of grain crops (ID 14.10)

NPV
IRR
РВР
$2.7M 29% 56 months

Objective of the project

Creation of a new production

Brief description and idea

In the result of the project will be constructed a high-tech complex for receiving, cleaning, drying and shipping of grain crops. The complex will allow simultaneous storage of 4 types of crops which, in turn, will allow to sell products at the most optimal prices in different time periods.

Infrastructure support:

1. Power: 2.1 MW
2. Gas: 63,791 m3/h
3. The railway line: 90 km away
4. The nearest federal highway: А-130 - 5 km away

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$2.4M

Place of implementation

Smolensk Oblast

The total cost of the project

$2.4M

Creation of a recreation complex “Olshansky quarries” (ID 14.9)

NPV
IRR
РВР
$9M 19% 97 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an all-season recreation complex for residents, tourists and autotourists of Smolensk region and adjacent regions on the territory with a total area of more than 14 hectares, located near Olshansky quarries.

Infrastructure support:

1. Power: 3.86 MW
2. Gas: 37,206 m3/h
3. The railway line: 12.5 km away
4. The nearest federal highway: М1 - 5 km away; P-120 - 4.5 km away

Implementation period

13 months

Project implementation stage

Proposal

The need for additional funding

$4.6M

Place of implementation

Smolensk Oblast

The total cost of the project

$4.6M

Creation of livestock complex for 1200 dairy cows (ID 14.8)

NPV
IRR
РВР
$17.5M 19% 49 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a modern high-tech dairy complex for 1200 dairy cows within the available fund of agricultural land in Smolensk region

Infrastructure support:

1. Power: 1.36 MW
2. Gas: 30 000 m3/h
3. The railway line: 108 km away
4. The nearest federal highway: A-130 - 3 km; P-120 - 3 km away

Implementation period

11 months

Project implementation stage

Proposal

The need for additional funding

$14.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$14.3M

Construction of a gas generating complex for the production of medical oxygen (ID 14.7)

NPV
IRR
РВР
$14.3M 23% 59 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a full-cycle enterprise for the production of liquid medical oxygen (with the possibility of subsequent gasification) on the territory of the state industrial park "Safonovo"

Infrastructure support:

1. Power: 6.62 MW
2. Water: 16,440 m3/h
3. Sewage: 16,440 m3/h
4. Gas: 495 m3/h
5. The railway line: 84 km away
6. The nearest federal highway: М1 - 9 km away

Implementation period

10 months

Project implementation stage

Proposal

The need for additional funding

$9.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$9.3M

Construction of a gas silicate blocks plant (ID 14.6)

NPV
IRR
РВР
$24.2M 29% 70 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of autoclaved cellular concrete blocks (gas silicate blocks) on the territory of the state industrial park "Safonovo"

Infrastructure support:

1. Power: 6.62 MW
2. Water: 16,440 m3/h
3. Sewage: 16,440 m3/h
4. Gas: 495 m3/h
5. The railway line: 84 km away
6. The nearest federal highway: М1 - 9 km away

Implementation period

28 months

Project implementation stage

Proposal

The need for additional funding

$48.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$48.3M

Organization of lignin processing production (ID 7.4)

NPV
IRR
РВР
$0.4M 29.4% 48 months

Objective of the project

Creation of a new production

Brief description and idea

Construction in Kostroma region of a plant for processing of hydrolytic lignin dumps in the amount of 1.4 million tons

Infrastructure support:

1. Power, MW: FSK networks: substation 500 kW "Zvezda" 220/110/10, power reserve - 240 MW. MRSK networks: substation 110/10 kW, power reserve - 24 MW
2. Water, m3/h: depends on technical conditions. Distance from connection point - 100 m
3. Sewage, m3/h: depends on technical conditions. Distance from tie-in point - 100 m
4. Gas, m3/h: absent. Construction of a gas pipeline and gas outlet "Galich - Manturovo - Sharya". Planned data - 2023
5. Availability of a railway line: privately owned in close proximity
6. Federal highway: 2 km from the federal highway P-243 "Kostroma - Sharya - Kirov - Perm"

Implementation period

16 months

Project implementation stage

Proposal

The need for additional funding

$1.9M

Place of implementation

Kostroma Oblast

The total cost of the project

$1.9M

Construction of a vegetable storage (ID 7.3)

NPV
IRR
РВР
$0.3M 11.86% 94.8 months

Objective of the project

Creation of a new production

Brief description and idea

Construction in Kostroma region of a vegetable storage corresponding to the modern standards, for storage and year-round supply of products to consumers

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$95M

Place of implementation

Kostroma Oblast

The total cost of the project

$95M

Creation of a corrugated cardboard manufactury (ID 2.8)

NPV
IRR
РВР
$1.9M 11% 84 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes construction of a plant for the manufacture of paper for corrugation and cardboard for flat layers

Infrastructure support:

1. Power, MW: 1.44 MW. There is a possibility of connection. Current power reserve - 1.44 MVA (substation Surazh).
2. Gas, m3/h: 4,800 m3/h. There is a possiiblity of connection. Gas throughput - 4,800 m3/h (gas distribution station Surazh).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$21.2M

Place of implementation

Bryansk Oblast

The total cost of the project

$21.2M

Construction of a carbamide-methanol complex (ID 2.6)

NPV
IRR
РВР
$0.5M 29% 63 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes construction of an ultra-modern carbamide-methanol complex applying the most promising technologies - the combined production of ammonia and methanol, followed by the production of carbamide

Infrastructure support:

1. Power: 3.73 MW

Implementation period

120 months

Project implementation stage

Proposal

The need for additional funding

$341.7M

Place of implementation

Bryansk Oblast

The total cost of the project

$341.7M

Construction of 2 pig breeding complexes (ID 2.7)

NPV
IRR
РВР
$31M - 114 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes construction of 2 pig breeding complexes for 6800 sows with a total capacity of 26,000 tons of commercial pork per year

Infrastructure support:

1. Power, MW: 14.8 MW. There is a possibility of connection. Current power reserve - 14.8 MWA (Substation 110/35/10 kW Pochepskaya)

Implementation period

10 months

Project implementation stage

Proposal

The need for additional funding

$53.5M

Place of implementation

Bryansk Oblast

The total cost of the project

$53.5M

Creation of a milk processing and cheese production enterprise (ID 2.5)

NPV
IRR
РВР
$0.6M 16.52% 63 months

Objective of the project

Creation of a new production

Brief description and idea

The project assumes construction of a plant for the manufacture of pickled cheeses with the potential of futher development and offering consumers high quality products at competitive prices

Infrastructure support:

1. Power, MW: 9.68 MW. There is a possibility of connection. Substation 110/35/10 kW Nerussa: tranformers capacity - 16 MVA, current power reserve/shortage for the transformer substation - 8.86 MVA.
2. Gas, m3/h: 30,000 m3/h. There is a possibility of connection. Gas throughput - 30,000 m3/h.

Implementation period

84 months

Project implementation stage

Proposal

The need for additional funding

$12.9M

Place of implementation

Bryansk Oblast

The total cost of the project

$12.9M

Biodegradable tableware production (ID 1.10)

NPV
IRR
РВР
$4M 15% 156 months

Objective of the project

Creation of a new production

Brief description and idea

Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.

Infrastructure support:

1. Power: available;
2. Water: available;
3. Gas: available;
4. The nearest federal highway: the federal highway Belgorod-Grayvoron-border of Ukraine.

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Belgorod Oblast

The total cost of the project

$3M

LED production (ID 12.16)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of the production of LED products as part of the development of the Russian Federation's program for a gradual transition to energy-saving technologies and the abandonment of traditional light sources.

Infrastructure support:

1. Power: 0.25-14.98 MW
2. Gas: 500 m3/h
3. The railway line: 5 km
4. The nearest federal highway: M2, E105 - 10 km

Project implementation stage

Proposal

The need for additional funding

$36M

Place of implementation

Oryol Oblast

The total cost of the project

$36M

Complex development of territories (ID 10.2)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.

Project implementation stage

Proposal

The need for additional funding

$1B

Place of implementation

Moscow

The total cost of the project

$1B

Construction of a sports and recreation complex (ID 11.25)

NPV
IRR
РВР
$20M - 36 months

Objective of the project

Creation of a new production

Brief description and idea

The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8,000 m2, with an emphasis on self-service, low prices and high throughput.

Infrastructure support:

1. Power: 0,4 and 1 MW;
2. Water: 2,71 m3/h (cold water); 3 m3/h;
4. Gas: 357 m3/h;
5. The nearest federal highway: "Ural" M-5, about 15 km from the sports complex.

Implementation period

Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)

Project implementation stage

Proposal

The need for additional funding

$1.7M

Place of implementation

Moscow Oblast

The total cost of the project

$3M

Reconstruction of a shopping facility (ID 11.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.

Infrastructure support:

1. Power, MW: there is a substation for 800 kW on the territory of the plant;
2. Water, m3/hour: available;
3. Sewage, m3/hour: available;
4. Gas, m3/hour: not required;
5. The nearest federal highway: A-108 (50m), M-5 Ural (8km).

The need for additional funding

$20M

Place of implementation

Moscow Oblast

The total cost of the project

$28M

Organization of production of heating elements (ID 12.17)

NPV
IRR
РВР
- 20% 3.5 years

Objective of the project

Creation of a new production

Brief description and idea

It is planned to create production lines, including the following stages of production:
- Oxide;
- Recovery;
- Manufacture of alloys;
- Pressing;
- Sintering;
- Forming;
- Heat treatment;
- Mechanical restoration.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$13M

Place of implementation

Oryol Oblast

The total cost of the project

$13M

Organization of production of electric stoves (ID 12.20)

NPV
IRR
РВР
- 31% 3.4 years

Objective of the project

Creation of a new production

Brief description and idea

The project envisages the production of electric stoves with several hermetic levels, using energy-saving technology, as well as the possible production of built-in ovens and built-in hobs.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$47M

Place of implementation

Oryol Oblast

The total cost of the project

$47M

Construction of an international medical cluster (ID 10.3)

NPV
IRR
РВР
-

Objective of the project

Creation of a new production

Brief description and idea

The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.

The project is being implemented on the principles of PPP, and the leading medical centers of the OECD countries will be involved in the management of MMK facilities.

Infrastructure support:

The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.

Project implementation stage

Proposal

The need for additional funding

$486M

Place of implementation

Moscow

The total cost of the project

$486M

Creation of places of application of labor (ID 10.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.

The mechanism for granting benefits (exemption from payment for changing the type of permitted use (VRI) of a land plot) is extended to the creation of not only objects of administrative and business or industrial and production purposes, but also objects of education, science, health and social security, sports, culture, trade , shopping and entertainment facilities, public catering, as well as multifunctional facilities, including all of the above types.

Project implementation stage

Proposal

The need for additional funding

$105M

Place of implementation

Moscow

The total cost of the project

$105M

Creation of a children’s technopark (ID 11.28)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.

Infrastructure support:

1. Power, MW: 0.4;
2. Water, m3/hour: 1DN=100mm from the water supply networks of our own water intake unit with the possibility of purchasing additional the volume of drinking water at MUE "Vodokanal-Service";
3. Availability of a railway line: yes;
4. The nearest federal highway: M-2 "Crimea" (2 km).

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Moscow Oblast

The total cost of the project

$10M

Creation of a multifunctional sports complex (ID 11.32)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.

Infrastructure support:

1. The nearest federal highway: M-7 Volga - 11 km, MKAD - 15 km.

The need for additional funding

$4M

The total cost of the project

$4M

Organization of production of ceramic refractory products (ID 12.1)

NPV
IRR
РВР
- 16% 4.1 years

Brief description and idea

It is planned to create the production of ceramic refractory products of several types.
The main stages of production of ceramic refractory products:
- extraction and transportation of raw materials;
- preparation and storage of raw materials;
- molding;
- drying;
- roasting;
- control;
- packing and shipment.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$13M

Place of implementation

Oryol Oblast

The total cost of the project

$13M

Organization of production of ceramic sanitary ware (ID 12.6)

NPV
IRR
РВР
- 17% 6.8 years

Objective of the project

Creation of a new production

Brief description and idea

"It is planned to create the production of ceramic sanitary ware. The production line consists of:
- kilns for roasting,
- molds for the product,
- foundry conveyor."

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$60M

Place of implementation

Oryol Oblast

The total cost of the project

$60M

Construction of a cement plant (ID 7.2)

NPV
IRR
РВР
$418M 20.8% 80 months

Objective of the project

Creation of a new production

Brief description and idea

This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.

Infrastructure support:

1. Power: available;
2. Water: available ;
3. Sewage: available ;
4. Gas: available;
5. The nearest federal highway: 235 km, 8.5 km, 5.5 km.

Project implementation stage

Proposal

The need for additional funding

$283M

Place of implementation

Kostroma Oblast

The total cost of the project

$283M

Organization of modern production of ceramic facade materials (ID 1.18)

NPV
IRR
РВР
$13M 37.47% 60 months

Objective of the project

Creation of a new production

Brief description and idea

The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.

The planned commissioning date is 2022.

The main raw material is our own raw material source - clays and loams of the Western area of ​​the Bykovsky ceramic clay deposit (up to 50%). Location of the deposit: Belgorod region, Yakovlevsky district, 0.5-1 km. South-west of the city of Stroitel and 3 km from the production site.

The main products are a wide range of ceramic panels (terracotta) for ventilated facades and decorative finishes for any type of building (up to 30 items).

The main consumers of the manufactured products are large and small enterprises of the Belgorod region and other regions of Russia, engaged in the construction industry.

Infrastructure support:

The industrial site has all the necessary engineering infrastructure: power supply, gas supply, water supply and sanitation, access roads and railways. The distance from the industrial site to the Tomarovka railway station is 22 km. The site has storage areas for raw materials and finished products.

The organization of production is planned on the basis of the operating production site of Belgorodskaya Keramika LLC, located in the Belgorod Region (Stroitel). Address: Russian Federation, Belgorod region, Stroitel, the territory of the concrete goods plant-3.

Production is supposed to be located in the existing production building of a group of workshops with adjoining technical facilities with a total area of ​​12,352 m2.

The capacity of the existing infrastructure:
1. Power, MW: 17.46;
2. Water, m3/hour: 4 artesian wells, capacity - 120 m3/hour, when replacing pumps, an increase up to 200 m3/hour is possible; 2 tanks, capacity - 800 m3/hour; 2 pipelines, d = 100 mm, capacity - 360 m3/hour;
3. Sewage, m3/hour: 520;
4. Gas, m3/hour: 500 m3/hour, when replacing the HPH (high pressure reducer), it is possible to increase up to 4000 m3/hour;
5. The nearest federal highway: M-2 (2.5 km).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$24M

Place of implementation

Belgorod Oblast

The total cost of the project

$24M

Organization of production of strontium based on celestite ores (ID 17.5)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

It is planned to build an enterprise for the extraction and processing of celestite ores.

Celestine is a raw material for the production of strontium compounds used in sugar, glass, ceramics, pharmaceutical industries, and pyrotechnics. During the extraction of strontium, an equally important by-product is formed - dolomite, which is used in the production of refractory material, building materials, and rubber.

Infrastructure support:

More than 20 deposits of strontium ores with total predicted resources of about 200 million tons have been discovered. In the Tula region, the Tabolskoye deposit has been explored and about 30 ore occurrences have been discovered.

The capacity of the existing infrastructure:
1. Power, MW: up to 100 MW (in the future, up to 150 MW);
2. Water, m3/hour: up to 26 thousand m3/day;
3. Sevage, m3/hour: up to 26 thousand m³/day;
4. Gas, m3/hour: up to 500 thousand m³/day;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 "Don" (passes along the border of the industrial park and the SEZ).

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Tula Oblast

The total cost of the project

$29M

Organization of production of clinker tiles (ID 12.7)

NPV
IRR
РВР
- 15% 3.1 years

Objective of the project

Creation of a new production

Brief description and idea

It is planned to create the production of clinker tiles. Products are manufactured on a conveyor line. Each of its components is an independent unit, with the possibility of replacement.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Oryol Oblast

The total cost of the project

$4M

Organization of red brick production (ID 12.9)

NPV
IRR
РВР
- 22% 3,5 years

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.

Infrastructure support:

1. Power: 30 MW
2. Gas: >1,000 m3/h
3. The railway line: 15.5 km away
4. The nearest federal highway: M-2, 50 km away

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Oryol Oblast

The total cost of the project

$3M

Organization of production of refractory red bricks (ID 12.12)

NPV
IRR
РВР
- 16% 6.4 years

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of an enterprise for the production of refractory bricks. The scope of this brick as the main furnace material in civil engineering, municipal infrastructure of settlements, including boiler houses, thermal power plants.

Infrastructure support:

1. Power: 30 MW
2. Gas: >1,000 m3/h
3. The railway line: 15.5 km away
4. The nearest federal highway: M-2, 50 km away

Project implementation stage

Proposal

The need for additional funding

$39M

Place of implementation

Oryol Oblast

The total cost of the project

$39M

Organization of production of panels for industrial housing construction (ID 12.13)

NPV
IRR
РВР
- 15% 6.3 years

Objective of the project

Creation of a new production

Brief description and idea

It is planned to create the production of panels for industrial housing construction:
- construction of production areas and warehouses;
- acquisition of metal molds and lifting mechanisms;
- creation of a concrete mixing unit.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,260 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Oryol Oblast

The total cost of the project

$4M

Plaster production (ID 12.19)

NPV
IRR
РВР
- 19% 2.9 years

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of a production line (a set of standard equipment and molds). The production process of dry construction mixtures includes certain stages: preparation of components and their transshipment, sifting, placing raw materials in storage bins, dosing, mixing, packaging, storage.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$3.9M

Place of implementation

Oryol Oblast

The total cost of the project

$3.9M

Establishment of building materials production (ID 11.33)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Manufacture of finishing products and construction products.

Infrastructure support:

1. The nearest federal highway: M-1 (24 km), M-9 (42 km).

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Moscow Oblast

The total cost of the project

$3M

Construction of a cement plant (1st stage) (ID 6.13)

NPV
IRR
РВР
$79M 17% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of the first stage of the plant for the production of cement.

Infrastructure support:

1. Power: 1.5 MW
2. Water supply: 16 m3/h
3. Sewage: 6 m3/h
4. Gas: 84 m3/h
5. The nearest federal highway: M-3, 15 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$600M

Place of implementation

Kaluga Oblast

The total cost of the project

$621M

Construction of a cement plant (2nd stage) (ID 6.14)

NPV
IRR
РВР
$17M 17% 60 months

Brief description and idea

Construction of the second stage of the plant for the production of cement.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 13 m3/h
3. Sewage: 5 m3/h
4. Gas: 115 m3/h
5. The nearest federal highway: M-3, 15 km

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$148M

Place of implementation

Kaluga Oblast

The total cost of the project

$148M

Construction of a plant for the production of wood-based sheet materials (ID 6.25)

NPV
IRR
РВР
$76К 31% 42 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of wood-based sheet materials in order to meet the needs of the domestic market for high-quality and competitive domestic timber and paper products, ensure environmental safety, and sustainably meet public needs for forest resources and services.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 8 m3/h
3. Sewage: 8 m3/h
4. Gas: 90 m3/h
5. The nearest federal highway: M-3, 20 km

Implementation period

4 months

Project implementation stage

Proposal

The need for additional funding

$304 thousand

Place of implementation

Kaluga Oblast

The total cost of the project

$304К

Construction of a factory for the production of ceramic masses (ID 6.28)

NPV
IRR
РВР
$1M 18.75% 75 months

Objective of the project

Creation of a new production

Brief description and idea

Development of the Ulyanovsk deposit of refractory and refractory clays and construction of a factory for processing the extracted raw materials. The region has a developed mineral resource base, which makes it possible not only to maintain the region's high industrial potential, but also to export certain types of mineral raw materials and products of its processing to neighboring regions of Russia.

Implementation period

12 months

The need for additional funding

$62M

Place of implementation

Kaluga Oblast

The total cost of the project

$62M

Construction of a plant for the production of radio-transparent and radio-absorbing materials (ID 17.9)

NPV
IRR
РВР
- - 72 months

Brief description and idea

Construction of a plant for the production of radio-transparent and radio-absorbing materials

Infrastructure support:

1. Power, MW: 100;
2. Water, m3/hour: 1,000;
3. Sewage, m3/hour: 7,000;
4. Gas, m3/hour: 1,000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Tula Oblast

The total cost of the project

$27M

Construction of an enterprise for the extraction of gypsum stone (ID 17.16)

NPV
IRR
РВР
- - 96 months

Brief description and idea

Construction of an enterprise for the extraction of gypsum stone at the Bolokhovsky, Obolensky, Skuratovsky deposits.

Infrastructure support:

1. Power, MW: 30;
2. Water, m3/hour: 20;
3. Sewage, m3/hour: 20;
4. Gas, m3/hour: 15;
5. The nearest federal highway: M-4 Don.

Project implementation stage

Proposal

The need for additional funding

$67M

Place of implementation

Tula Oblast

The total cost of the project

$67M

Creation of paint and varnish production (ID 17.28)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of varnishes, paints, enamels, primers, adhesives, fillers, coloring pigments and drying oils.

Infrastructure support:

1. Power, MW: 60;
2. Water, m3/hour: 100;
3. Sewage, m3/hour: 100;
4. Gas, m3/hour: 450;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-2 Crimea.

Project implementation stage

Proposal

The need for additional funding

$13M

Place of implementation

Tula Oblast

The total cost of the project

$13M

Construction of a modern production facility for the production of knitwear (ID 6.12)

NPV
IRR
РВР
$8M 53% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a modern production facility for the production of knitwear.

Infrastructure support:

1. Power: 0.5 MW
2. Water supply: 3 m3/h
3. Sewage: 3 m3/h
4. Gas: 20 m3/h
5. The nearest federal highway: M-3, 17 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$21M

Place of implementation

Kaluga Oblast

The total cost of the project

$21M

Organization of production of medical textiles (ID 5.3)

NPV
IRR
РВР
$10M 19% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Enterprise for the production of medical textiles. The main products are functional medical textiles.

Infrastructure support:

1. Power, MW: 8;
2. Water, m3/hour: 550;
3. Sewage, m3/hour: 160;
4. Gas, m3/hour: 4,000;
5. The presence of a railway line;
6. The nearest federal highway: M-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$16M

Place of implementation

Ivanovo Oblast

The total cost of the project

$8M

Organization of import-substituting production of vials for medical packaging (ID 2.3)

NPV
IRR
РВР
$1M 25.31% 44 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the creation on the territory of the Bryansk region of a modern, highly efficient production facility for the production of vials from medical glass of the second hydrolytic class to meet the demand of the pharmaceutical industry in high-quality medical glassware of domestic production.

Infrastructure support:

1. Power: 4,61 MW
2. Gas: available
3. Availability of a railway line: 500 m away
4. The nearest federal highway: R-120, 56 km

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Bryansk Oblast

The total cost of the project

$3M

Construction of an automotive components production plant (ID 6.2)

NPV
IRR
РВР
$9.5M 17% 84 months

Objective of the project

Creation of a new production

Brief description and idea

The project aims to build a plant for the production of automotive components.

Infrastructure support:

1. Power: 4 MW
2. Water supply: 7 m3/h
3. Sewage: 7 m3/h
4. Gas: 340 m3/h
5. The nearest federal highway: M-3, 6 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$13.5M

Place of implementation

Kaluga Oblast

The total cost of the project

$13.5M

Production of small aviation aircraft for agricultural use (ID 11.1)

NPV
IRR
РВР
- - 36-60 months

Objective of the project

Creation of a new production

Brief description and idea

Development of the "RATAY" aeromobile aircraft complex for agricultural use

Infrastructure support:

1. Power: MW: 800 KW;
2. Water: m3/h: available;
3. Sewage: m3/h: available;
4. Gas: m3/h: not required;
5. The nearest federal highway: A-108 (50m), M-5 "Ural" (8km).

Project implementation stage

Proposal

The need for additional funding

$7.4M

Place of implementation

Moscow Oblast

The total cost of the project

$7.4M

Production of filling and packaging machines (ID 5.9)

NPV
IRR
РВР
- 18% 5.5 years

Objective of the project

Creation of a new production

Brief description and idea

Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.

Infrastructure support:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. Gas: m3/h: 25 Gcal/hour;
4. The railway line: available;
6. The nearest federal highway: М-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$9.5M

Place of implementation

Ivanovo Oblast

The total cost of the project

$9.5M

Production of components for specialized machinery (ID 5.10)

NPV
IRR
РВР
- 21% 5.5 years

Objective of the project

Creation of a new production

Brief description and idea

The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.

Infrastructure support:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. Gas: m3/h: 25 Gcal/hour;
4. The railway line: available;
6. The nearest federal highway: М-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$11M

Place of implementation

Ivanovo Oblast

The total cost of the project

$11M

Construction of an automotive components production plant (ID 17.1)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

"The Uzlovaya" Industrial Park was the site of one of Russia's largest car manufacturing projects in 2018, implemented by the Russian division of China's Great Wall Motor Company Limited.

Infrastructure support:

1. Power: up to 100 MW;
2. Water: m3/h: 26,000 m3/day;
3. Sewage: m3/h: 26,000 m3/day;
4. Gas: m3/h: 500,000 m3/day;
5. The nearest federal highway: М-4 (100 m).

Project implementation stage

Proposal

The need for additional funding

$13.5M

Place of implementation

Tula Oblast

The total cost of the project

$13.5M

Industrial electric motor production (ID 12.15)

NPV
IRR
РВР
- 25% 6.7 years

Objective of the project

Creation of a new production

Brief description and idea

The project involves the production of electric motors designed to convert energy. This type of device transforms electric power into motive power or mechanical work.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$122M

Place of implementation

Oryol Oblast

The total cost of the project

$122M

Production of traction electric motors (ID 12.18)

NPV
IRR
РВР
- 40% 5.3 years

Objective of the project

Creation of a new production

Brief description and idea

The project involves creating a full production cycle for traction electric motors: producing components, assembling, and testing them.
In addition to railway transport, traction motors will also be in demand in other sectors of the economy - oil and gas, metallurgy, mining, and power generation.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$88M

Place of implementation

Oryol Oblast

The total cost of the project

$88M

Creation of a sealing materials plant (ID 17.25)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of production of high-temperature composite sealing materials

Infrastructure support:

1. Power: 100 MW;
2. Water: 1,000 m3/h;
3. Sewage: 7,000 m3/h;
4. Gas: 1,000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 ""Don"" (1 km).

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Tula Oblast

The total cost of the project

$4M

Expansion of diesel engine production (ID 17.31)

NPV
IRR
РВР
- - 84 months

Objective of the project

Creation of a new production

Brief description and idea

Organizing increased output of diesel engines with a prospective program of up to 3,000 engines per year at "Tulamashzavod". The project is aimed at reconstructing production facilities and purchasing the necessary equipment to expand production capacity and increase diesel engine output.

Infrastructure support:

1. Power: 100 MW;
2. Water: 1,000 m3/h;
3. Sewage: 7,000 m3/h;
4. Gas: 1,000 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway".

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Tula Oblast

The total cost of the project

$3M

Construction of a composite coating plant (ID 17.35)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an organization for the production of polymer and composite coatings for aviation, rocket and space, special equipment, and other industries

Infrastructure support:

1. Power: 100 MW;
2. Water: 1,000 m3/h;
3. Sewage: 7,000 m3/h;
4. Gas: 1,000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don" (1 km).

Project implementation stage

Proposal

The need for additional funding

$22M

Place of implementation

Tula Oblast

The total cost of the project

$22M

Creation of an automotive component production complex (ID 17.42)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a production complex for automotive components in the private and commercial vehicle segments

Infrastructure support:

1. Power: 100 MW;
2. Water: 1,000 m3/h;
3. Sewage: 7,000 m3/h;
4. Gas: 1,000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don" (1 km).

Project implementation stage

Proposal

The need for additional funding

$270.3M

Place of implementation

Tula Oblast

The total cost of the project

$270.3M

Creation of a rabbit farm (ID 1.7)

NPV
IRR
РВР
$173К 39.7% 49.56 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a rabbit farm located in the Ivnyansky district, Belgorod Oblast
The project involves farming meat rabbits of the California breed. 
The planned date of reaching the projected capacity is 2022.
The project site is currently an undeveloped land plot of 55.9 hectares, 64 km from the city of Belgorod. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. 
The distance from the industrial site to the federal highway M-2 "Krym" is 5.5 km.
The main consumers of the project's products are located in the Central Federal District.

Infrastructure support:

1. Power: available;
2. Water: m3/h: available;
3. Gas:m3/h: available;
4. The nearest federal highway: available.

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$280К

Place of implementation

Belgorod Oblast

The total cost of the project

$280К

Construction of a plant for the production of frozen cooked potatoes and potato flakes (ID 2.2)

NPV
IRR
РВР
$27M 15.4% 76 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of frozen cooked potatoes and potato flakes

Infrastructure support:

1. Power: available
2. Gas: available
3. Availability of a railway line: 15 km away
4. The nearest federal highway: A-240, 500 m

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$62M

Place of implementation

Bryansk Oblast

The total cost of the project

$66M

Construction of a greenhouse complex for year-round cultivation of vegetable crops (ID 2.4)

NPV
IRR
РВР
$2.3M - 7.4 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of an ultra-modern greenhouse complex using the latest achievements of the world's crop production in the protected ground.

Infrastructure support:

1. Power: connectivity available;
2. Water: m3/h: connectivity available;
3. Sewage: m3/h: connectivity available;
4. Gas: connectivity available;
5. The nearest federal highway: R-120 (1.5 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$25M

Place of implementation

Bryansk Oblast

The total cost of the project

$25M

Production of pharmaceutical substances (ID 17.7)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Production of pharmaceutical substances

Infrastructure support:

1. Power, MW: 8;
2. Water, m3/hour: 12;
3. Sewage, m3/hour: 12;
4. Gas, m3/hour: 6;
5. The nearest federal highway: M-4 Don.

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Tula Oblast

The total cost of the project

$27M

Construction of a plant for the production of medical isotope (ID 17.17)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of the production of medical isotope TS99.

Infrastructure support:

1. Power: 100 MW;
2. Water: 1,000 m3/h;
3. Sewage: 7,000 m3/h;
4. Gas: 1,000 m3/h;
5. The presence of a railway line:;
6. The nearest federal highway: M-4 Don (1 km)

Project implementation stage

Proposal

The need for additional funding

$81M

Place of implementation

Tula Oblast

The total cost of the project

$81M

Manufacture of 10-wire reinforcing ropes (ID 3.2)

NPV
IRR
РВР
$864M 58.87% -

Objective of the project

Creation of a new production

Brief description and idea

When reinforcing prestressed products with K7 ropes, one of the key problems is the insufficient adhesion force of the rope to concrete. When transversely cutting the workpiece into products, rope slippage often occurs, which is manifested by the retraction of the reinforcement deep into the product. This phenomenon has a negative effect on the bearing capacity, so the product, depending on the scale of the problem, is transferred to lower strength groups or cut to smaller lengths for which the stored tension is sufficient, and in some cases even rejected. These problems are completely solved by using the TK10 rope as reinforcement on the BOF lines.
TK10 is an innovative ten-wire steel triangular rebar intended for use in prestressed concrete products. The innovation consists in changing the cross-sectional shape of a standard 7-wire reinforcing rope by creating pronounced side edges by adding 3 additional wires to the rope, which protrude significantly in space.
This form gives a high grip to the reinforcing rope, in contrast to the standard rope in which the grip occurs only due to adhesion. The protruding edges of the TK10 rope increase grip, similar to the protruding threads. In addition, the adhesion is additionally reinforced with a periodic profile, which excludes the rope from being screwed into the concrete according to its own imprint.

Infrastructure support:

1. Power, MW: the estimated power of electrical receivers is 2.7 MW,
2. Water, m3/h: the stabilization line includes a closed water cooling system using clean industrial water. Compensation for evaporation losses in
volume of 0.1 m3 for the production of 1 ton of products. At maximum production capacity, clean water consumption for technological needs will not exceed 1 m3/hour.
The laboratory and administrative premises use drinking water that meets the requirements of SanPiN 2.1.4.559 “Drinking water. Hygienic requirements for
water quality of centralized drinking water supply systems”. Average consumption of drinking water: 3 m3/day.

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Vladimir Oblast, Kameshkovo

The total cost of the project

$29M

Modernization of tool production (ID 17.11)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

New tool production of ITO-Tulamash JSC.

Infrastructure support:

1. Power, MW: 100;
2. Water, m3/hour: 1,000;
3. Sewage, m3/hour: 7,000;
4. Gas, m3/hour: 1,000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Tula Oblast

The total cost of the project

$5M

Construction of a high-efficiency wheat processing industrial complex (ID 8.1)

NPV
IRR
РВР
$255M 30.77% 72 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project aims to create and commercially operate a high-tech wheat advanced processing complex. The facility will produce the following products: dry wheat gluten, native starch, modified starches, maltodextrin, dry glucose syrup, caramel molasses, and wheat bran-based feedstuff.

Infrastructure support:

1. Power: 16 MW
2. Water: 220 m3/h
3. Sewage: 100 m3/h
4. Gas: 9000 m3/h
5. The railway line: available: 0.1 km
6. The nearest federal highway: 0.7 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$209M

Place of implementation

Kursk Oblast

The total cost of the project

$209M

Construction of a plant for component parts for metalworking machines (ID 17.19)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a new production of components for the repair and modernization of metalworking machines.

Infrastructure support:

1. Power, MW: 100;
2. Water, m3/hour: 1,000;
3. Sewage, m3/hour: 7,000;
4. Gas, m3/hour: 1,000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

Project implementation stage

Proposal

The need for additional funding

$675K

Place of implementation

Tula Oblast

The total cost of the project

$675K

Mushrooms production (ID 12.3)

NPV
IRR
РВР
- 25% 4.2 years

Objective of the project

Creation of a new production

Brief description and idea

The project involves 4 types of products:
- Fresh eringas in raw condition;
- Varietal shimeji in packs;
- Raw agaric honey;
- Selected sorted chanterelles in packs.

Infrastructure support:

1. Power: 10 MW
2. The railway line: 300 m away
3. The nearest federal highway: М2 - 50 km away

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Oryol Oblast

The total cost of the project

$5M

Production of baby porridge (ID 12.4)

NPV
IRR
РВР
- 20% 4.5 years

Objective of the project

Creation of a new production

Brief description and idea

Creation of a baby food production facility
All ingredients for production are purchased in the Orel Oblast or neighboring regions
Capital costs for land lease, construction of facilities, purchase of equipment

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$65M

Place of implementation

Oryol Oblast

The total cost of the project

$65M

Organization of production of automated control and metering stations for electricity (ID 5.1)

NPV
IRR
РВР
$16M 31% 48 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.

Infrastructure support:

1. Power, MW: 10;
2. Water supply, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$47M

Place of implementation

Ivanovo Oblast

The total cost of the project

$47m

Production of baby fruit puree (ID 12.5)

NPV
IRR
РВР
- 20% 4.5 years

Objective of the project

Creation of a new production

Brief description and idea

The aim of the project is to start the production of fruit puree for children. All ingredients for production are purchased in the Oryol Oblast from farms and agricultural farms.
Capital costs for land lease, construction of facilities, purchase of equipment

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Oryol Oblast

The total cost of the project

$27M

Production of distilled potable alcoholic and non-alcoholic beverages (ID 14.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distillery

Infrastructure support:

1. Power: 9.89 MW
2. Gas: 26,902 m3/h
3. The railway line: 0.5 km away
4. The nearest federal highway: M1 "Belarus" - 4 km away

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Smolensk Oblast

The total cost of the project

$2M

Construction project for an automated cattle dairy farm (ID 14.1)

NPV
IRR
РВР
- 19.2% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cows

Infrastructure support:

1. Power: 6.19 MW
2. Gas: 6,537 m3/h
3. The nearest federal highway: M-1 - 25 km away

Project implementation stage

Proposal

The need for additional funding

$2.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$2.3M

Creation of a broiler poultry farm (ID 14.4)

NPV
IRR
РВР
- 31% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Investment attraction at the former broiler farm site
Reconstruction of the production and storage site and the launch of a new production facility at the former broiler farm.

Infrastructure support:

1. Power: 3.8 MW
2. Gas: 13,390 m3/h
3. The railway line: 43 km away
4. The nearest federal highway: M1 "Belarus" highway (160 km away, near the road "Smolensk-Bryansk")

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Smolensk Oblast

The total cost of the project

$29M

Construction and maintenance of an industrial greenhouse complex (ID 14.5)

NPV
IRR
РВР
$39.2M 15.6% 111 months

Objective of the project

Creation of a new production

Brief description and idea

The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per year

Infrastructure support:

1. Power: 36 MW
2. Gas: 62,794 m3/h
3. The railway line: 151 km away
4. The nearest federal highway: M1 "Belarus" highway (1 km away)

Implementation period

37 months

Project implementation stage

Proposal

The need for additional funding

$84.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$84.3M

Construction of a vegetable drying complex project (ID 14.2)

NPV
IRR
РВР
$45M 29.2% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.
Production technology: by dehydration the most efficient in these conditions method of convective drying with the use of automatic raw material processing lines was selected.

Infrastructure support:

1. Power: 26 MW
2. Water: 685 m3/h
3. Sewage: 685 m3/h
4. Gas: 495 m3/h
5. The railway line: 1 km away
6. The nearest federal highway: M1 "Belarus" highway (7.5 km away)

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$17M

Place of implementation

Smolensk Oblast

The total cost of the project

$17M

Production of frozen berry and vegetable crops (ID 1.4)

NPV
IRR
РВР
$2.3M 31.17% 64.56 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.
The project is expected to reach its projected capacity in 2022.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement Ivnya. The land plot is owned by Belgorod Oblast. The construction of engineering and transport infrastructure facilities, driveways, roads, and logistics sites, as well as electricity, gas, and water supply systems is planned.
The project includes the construction of a long-term storage facility for frozen products with a capacity of up to 5,000 tonnes, a sorting facility, and the purchase of blast freezing equipment.
The main consumers of the project's products are located in the Central Federal District.

Infrastructure support:

1. Power, MW: available:
2. Water, m3/hour: available;
3. Sewage, m3/hour: available;
4. Gas, m3/hour: available;
5. The nearest federal highway: M-2 "Crimea Highway" (5,5 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$8M

Place of implementation

Belgorod Oblast

The total cost of the project

$8M

Construction of a confectionery plant (ID 16.2)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Production of crackers, biscuits, and other dry bakery products, production of flour confectionery, cakes, pastries, pies, and biscuits intended for long-term storage.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$63.5M

Place of implementation

Tver Oblast

The total cost of the project

$63.5M

Creation of a modern high-tech swine-breeding complex (ID 16.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Investment project for the construction of a high-tech meat processing complex, a feed mill, and a livestock breeding complex, including its own five swine-breeding complexes, a breeding and genetic center for 2,500 sows, a feed mill for up to 150,000 tonnes per year, a drying complex, a separation plant, a grass meal facility, and a storage complex. Project implementation period: 36 months. The number of employment places is 790.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$62.2M

Place of implementation

Tver Oblast

The total cost of the project

$62.2M

Creation of an innovative greenhouse complex for vegetable production (ID 16.5)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

High-tech greenhouse complex for growing greenhouse vegetables, with three phases of implementation.
The investment project involves the use of advanced and innovative equipment and technology. 
The total cost of the project is Rub 4.6 billion ($62.2 million). Project implementation period: 36 months.  

Infrastructure support:

1. The nearest federal highway: M-10 (1.5 km)

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$62.2M

Place of implementation

Tver Oblast

The total cost of the project

$62.2M

Construction of a plant for the production of semi-soft and hard cheese (ID 1.16)

NPV
IRR
РВР
$3M 10.8% 100.6 months

Objective of the project

Creation of a new production

Brief description and idea

"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.
The planned commissioning date is 2023.
Requirements for the project site: a land plot of at least 3 hectares for the construction of a production building.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement of Ivnya. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. "

Infrastructure support:

1. The nearest federal highway: M-2 "Crimea Highway" (5,5 km)

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$7M

Place of implementation

Belgorod Oblast

The total cost of the project

$7M

Construction of a plant for the production of integrated circuits (ID 6.3)

NPV
IRR
РВР
$1M 15% 84 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of microcircuits.

Infrastructure support:

1. Power: 2 MW
2. Water supply: 5 m3/h
3. Sewage: 5 m3/h
4. Gas: 20 m3/h
5. The nearest federal highway: M-3, 2.4 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$25M

Place of implementation

Kaluga Oblast

The total cost of the project

$25M

Organization of production of charging stations for electric vehicles (ID 5.2)

NPV
IRR
РВР
$8M 2% 72 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.

Infrastructure support:

1. Power, MW: 10;
2. Water, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Ivanovo Oblast

The total cost of the project

$5M

Organization of production of energy storage systems (ID 5.7)

NPV
IRR
РВР
- 27% 7.4 years

Objective of the project

Creation of a new production

Brief description and idea

Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.

Infrastructure support:

1. Power, MW: 10;
2. Water, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$24M

Place of implementation

Ivanovo Oblast

The total cost of the project

$24M

Manufacture of complete busbar systems (ID 3.1)

NPV
IRR
РВР
$45K 20.8% 170.16 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.

The investment project involves the production of complete busbar systems for power transmission with a degree of protection IP55, IP68.

The main parameters of the products planned for release:
- Bus material: copper or aluminum;
- Degree of protection of the case: IP55, IP68;
- Cast insulation is used as insulation - a compound of our own design (application
No. 2018116892 dated May 18, 2018 for obtaining a patent for the invention "Polyurethane compound of cold curing");
- The size of a standard section of busbar trunking is 3 meters.

Sections of the bus duct (bus duct system) are made using an aluminum or copper bus as a current-carrying element. The busbar section is selected depending on the electrical power transmitted by the system. The design uses a tightly compressed package of insulated busbars, enclosed in a metal or polymer case, depending on the required degree of protection.

Depending on the design and requirements of the consumer, the busbar system can contain up to five independent current-carrying conductors enclosed in one housing. The connection of the consumer of electricity to the busbar system is carried out either with the help of terminal sections of the busbar, which allow taking full power from the busbar, or by power take-offs, each designed for a certain power.

The size of a standard busbar section is 3 meters, which is a multiple of the standard column grid in construction. Also, busbar sections can be made smaller, for ease of routing and installation of the system.

Infrastructure support:

1. Power, MW: 0.37;
2. Water, m3/h: 8.11;
3. Sewage, m3/hour: 8.11;
4. Gas, m3/hour: 650;
5. The nearest federal highway: M-8.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Vladimir Oblast, Kolchuginsky district, Kolchugino city

The total cost of the project

$2M

Organization of production of household appliances (ID 12.2)

NPV
IRR
РВР
- 35% 2.8 years

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of a plant for the production of household appliances.

After the completion of the construction of the plant and the launch of production, it is planned to produce the following products:
- Vacuum cleaners;
- Mixers;
- Meat grinders;
- Accessories.

Infrastructure support:

1. Power: 0.25-14.98 MW
2. Gas: 500 m3/h
3. The railway line: 5 km
4. The nearest federal highway: M-2, E-105 (10 km)

Project implementation stage

Proposal

The need for additional funding

$21M

Place of implementation

Oryol Oblast

The total cost of the project

$21M

Organization of production of logistics controllers and switching equipment (ID 12.11)

NPV
IRR
РВР
- 30% 4.4 years

Objective of the project

Creation of a new production

Brief description and idea

Logistic controllers and switching equipment are designed to control technological processes. These products are used both in manufacturing (for example, equipment for an automation system designed to monitor and control process processors in the quality control line of tubing, casing and oil and gas pipes) and in household appliances (for example, a washing machine control module).

The project aims to create a line of specialized products with a high level of localization for the needs of government organizations, state-owned enterprises and commercial enterprises, which will reduce dependence on foreign manufacturers.

Infrastructure support:

1. Power: 0.25 MW
2. Sewage: 400 m3/h
3. Gas: 300 m3/h
4. The railway line: 5 km
5. The nearest federal highway: M-2, E-105, (7 km)

Project implementation stage

Proposal

The need for additional funding

$54M

Place of implementation

Orlov Oblast

The total cost of the project

$54M

Organization of production of electric drives (ID 5.11)

NPV
IRR
РВР
- 23% 5.2 years

Objective of the project

Creation of a new production

Brief description and idea

Establishment of an enterprise for the production of electric drives.

The main products are electric drives for industrial equipment, pipeline fittings, household appliances, ventilation systems.

Infrastructure support:

1. Power, MW: 8;
2. Water, m3/hour: 550;
3. Sewage, m3/hour: 160;
4. Gas, m3/hour: ;
5. Availability of a railway line: 4,000;
6. The nearest federal highway: M-7, 100 km.

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Ivanovo Oblast

The total cost of the project

$27M

Deep processing of plant products (ID 17.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a production facility for the deep processing of horticultural, fruit, berry products and the creation of ready-made meals

Infrastructure support:

1. Power: up to 100 MW: eventually up to 150 MW;
2. Water: m3/h: up to 26,000 m3/day;
3. Sewage: m3/h: up to 26,000 m3/day;
4. Gas: m3/h: up to 500,000 m3/day;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$38M

Place of implementation

Tula Oblast

The total cost of the project

$38M

Creating a craft lemonade and cider production (ID 12.10)

NPV
IRR
РВР
- 15% 2.1 years

Objective of the project

Creation of a new production

Brief description and idea

The project aims to create a business from scratch. Foreseen costs are for the lease/purchase of land; construction of facilities for production and storage; transportation; purchase of equipment for lemonade and cider production and bottling; regular delivery of raw materials and containers; marketing strategy for market entry; advertising campaign; training and staff salaries.

Infrastructure support:

1. Power: 0.25 MW
2. Sewage: 400 m3/h
3. Gas: 300 m3/h
4. The railway line: 5 km
5. The nearest federal highway: M-2, E-105, (7 km)

Project implementation stage

Proposal

The need for additional funding

$1.5M

Place of implementation

Oryol Oblast

The total cost of the project

$1.5M

Creation of a beer production (ID 12.14)

NPV
IRR
РВР
15% 5.1 years

Objective of the project

Creation of a new production

Brief description and idea

The aim of the project is to open a brewery in the Orel Oblast. Sales are planned in the oblast and neighboring oblasts.

Infrastructure support:

1. Power: 10 MW
2. Water: 36 m3/h
3. Sewage: 75 m3/h
4. Gas: 6,500 m3/h
5. The railway line: 1.5 km away
6. The nearest federal highway: M-2 (2 km)

Project implementation stage

Proposal

The need for additional funding

$62.2M

Place of implementation

Oryol Oblast

The total cost of the project

$62.2M

Сonstruction of a complex for the production and sale of ducks (ID 12.21)

NPV
IRR
РВР
- 20% 24 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of a complex for the production and selling of 7,000 ducks per year. The project includes the creation of a processing chain, including the purchase of ducklings, their raising, and further resale.

Infrastructure support:

1. Power: 30 MW
2. Gas: >1,000 m3/h
3. The railway line: 15.5 km away
4. The nearest federal highway: M-2, 50 km away

Project implementation stage

Proposal

The need for additional funding

$300K

Place of implementation

Oryol Oblast

The total cost of the project

$300K

Construction of a berry farm (ID 12.22)

NPV
IRR
РВР
- 25% 2.4 years

Objective of the project

Creation of a new production

Brief description and idea

The implementation of an investment project involves expenses for:
- Lease (purchase) of land;
- Seedings purchase;
- Gardening equipment purchase;
- Paying salaries to hired workers;
- Expenses for the transportation of products.

Infrastructure support:

1. Power: 10 kW
2. The railway line: 300 m away
3. The nearest federal highway: M-2, 50 km away

Project implementation stage

Proposal

The need for additional funding

$110K

Place of implementation

Oryol Oblast

The total cost of the project

$110K

Construction of a berry greenhouse (ID 12.23)

NPV
IRR
РВР
- 25% 5.1 years

Objective of the project

Creation of a new production

Brief description and idea

Construction of an industrial multi-span greenhouse
The greenhouse is a prefabricated structure assembled from a variety of prefabricated elements

Infrastructure support:

1. Power: 10 kW
2. The railway line: 300 m away
3. The nearest federal highway: M-2, 50 km away

Project implementation stage

Proposal

The need for additional funding

$34M

Place of implementation

Oryol Oblast

The total cost of the project

$34M

Construction of an industrial park (ID 11.3)

NPV
IRR
РВР
$6M - 204 months

Objective of the project

Creation of a new production

Brief description and idea

An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.

Infrastructure support:

1. Power, MW: 40;
2 Gas, m3/hour: 15,000;
3. The nearest federal highway: A-107 (0 m), Central Ring Road (1 km), M-4 "Don" (13 km), M-2 "Crimea" (28 km).

Implementation period

18 months (for one object)

Project implementation stage

Proposal

The need for additional funding

$675M

Place of implementation

Moscow Oblast

The total cost of the project

$675M

Creation of an agro-industrial technology park (ID 11.16)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.

Infrastructure support:

1. Power, 3 MW;
2. Water: m3/hour: 650 m3/day;
3. Sewage: m3/hour: 2,000 m3/day;
4. Gas: 2,200 m3/hour;
5. The nearest federal highway: R-106 (2 km)

Project implementation stage

Proposal

The need for additional funding

$68.5M

Place of implementation

Moscow Oblast

The total cost of the project

$68.5M

Creation of an Atlantic salmon farming plant (ID 11.23)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of an Atlantic salmon farming plant in the Kashira urban district

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$54M

Place of implementation

Moscow Oblast

The total cost of the project

$54M

Construction of a wholesale distribution center (ID 1.11)

NPV
IRR
РВР
$857K 11.32% 112.56 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.

The presence of a slaughterhouse for up to 5 cattle or 10 pigs and equipment for intensive cooling and shock freezing will ensure high-quality primary processing of pork and cattle meat, which will significantly increase the competitiveness and profitability of the products.

The planned date for reaching the design capacity is 2022.

The project site is currently an undeveloped land plot with an area of ​​55.9 hectares, 64 km from the city of Belgorod and 26 km from the village of Ivnya (the center of the municipality). The land plot is owned by the Belgorod region.

The construction of engineering and transport infrastructure facilities, driveways, roads and logistics sites, a system of electricity, gas and water supply (increasing the capacity of networks) is envisaged.

The project involves the construction of a warehouse for long-term storage of apples with a total capacity of up to 1500 tons with a sorting workshop (LLC EUROHOLOD, Moscow). Construction of a refrigeration and freezing warehouse (LLC PROFSTAL). Completion of the slaughter shop for up to 5 cattle or 10 pigs (DiPiProm LLC).

The main consumers of the services of the wholesale distribution center are small-scale agricultural producers of the Ivnyansky, Rakityansky, Prokhorovsky districts of the Belgorod region, as well as Bolshesoldatsky, Belovsky, Oboyansky districts of the Kursk region.

Infrastructure support:

1. Power, MW: source 1 - SS-35/10kV "Kochetovka"; electricity was supplied according to a temporary scheme with a capacity of 630 kW, TU No. 5-199 / 20284964 of 12/19/2013;
2. Water, m3/h: possible with the help of well drilling; to meet the demand of 125 m3/hour, it is necessary to drill 6 water wells of 25 m3/hour each (5 working and 1 reserve);
3. Gas, m3/h: source - GDS s. Small Mayachki (P 0.6 MPa), underground gas pipeline; free peak load 2 - 6.7 thousand m3/hour; a gas pipeline with a maximum hourly flow rate of 6.6 thousand m3/hour was connected, TU No. 7566 dated November 29, 2013;
4. The nearest federal highway: M-2 "Crimea" (5.5 km).

Project implementation stage

Proposal

The need for additional funding

$26M

Place of implementation

Belgorod Oblast

The total cost of the project

$26M

Organization of logistics and storage facilities (ID 17.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Organization of industrial real estate objects in the Tula region (distribution center, fulfillment, temperature warehouse, temporary storage warehouse, etc.).

Infrastructure support:

1. Power, MW: up to 100 MW (in the future, up to 150 MW);
2. Water, m3/hour: up to 26 thousand m3/day;
3. Sewage, m3/hour: up to 26 thousand m³/day;
4. Gas, m3/hour: up to 500 thousand m³/day;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 "Don" (passes along the border of the industrial park).

Project implementation stage

Proposal

The need for additional funding

$40M

Place of implementation

Tula Oblast

The total cost of the project

$40M

Construction of transport interchange hub of TPU (ID 11.9)

NPV
IRR
РВР
$1M 21.4% 7.9 months

Objective of the project

Creation of a new production

Brief description and idea

Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.

Implementation period

108 months

Project implementation stage

Proposal

The need for additional funding

$1B

Place of implementation

Moscow Oblast

The total cost of the project

$1B

Construction of transport interchange hub of TPU (ID 11.17)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$181M

Place of implementation

Moscow Oblast

The total cost of the project

$181M

Construction of transport interchange hub of TPU (ID 11.18)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.

Infrastructure support:

1. The presence of a railway line

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$67M

Place of implementation

Moscow Oblast

The total cost of the project

$67M

Construction of a production and warehouse complex (ID 11.20)

NPV
IRR
РВР
- 19,4% 96 months

Objective of the project

Creation of a new production

Brief description and idea

Design and construction of a production and warehouse complex in the Mozhaisk city district.

Infrastructure support:

1. Power, MW: 3;
2. Water, m3/hour: 510;
3. Sewage, m3/hour: 980;
4. Gas, m3/hour: 1194;
5. The nearest federal highway: M1 "Belarus", 0 km (ZU are adjacent to the highway).

Implementation period

14 months – 1st stage, 12 months. – 2nd stage

Project implementation stage

Proposal

The need for additional funding

$47M

Place of implementation

Moscow Oblast

The total cost of the project

$47M

Construction of an industrial and logistics complex (ID 11.21)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.

Infrastructure support:

1. Power, MW: 10 with a possible increase;
2. Water, m3/hour: individual well;
3. Gas, m3/hour: gas pipeline along the border, but reconstruction of the Yakot GDS is required;
5. Availability of a railway line: ;
6. The nearest federal highway: Dmitrovskoe shosse (A-104) - 300 m, A-108 (part of the Dmitrov bypass) - passes through the project area.

Project implementation stage

Proposal

The need for additional funding

$40M

Place of implementation

Moscow Oblast

The total cost of the project

$40M

Construction of a logistics center (ID 11.34)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Construction of a logistics center in the urban district of Serebryanye Prudy.

Infrastructure support:

1. Power, MW: 5.53;
2. The nearest federal highway: M-6 Caspian, 300 m.

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Construction of light rail lines (ID 11.37)

NPV
IRR
РВР
- - 168 months

Objective of the project

Creation of a new production

Brief description and idea

The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Construction of warehouse complexes for the storage of dry materials (ID 6.19)

NPV
IRR
РВР
$1M 37.2% 62 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of warehouses. This project involves the construction of warehouses for the storage of cement and finished products of other dry building mixtures. The project offers rooms that meet the requirements for humidity, temperature of storage of mixtures.

Infrastructure support:

1. Power: 0.5 MW
2. Water supply: 1 m3/h
3. Sewage: 1 m3/h
4. Gas: 8 m3/h
5. The nearest federal highway: M-3, 1 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$1M

Place of implementation

Kaluga Oblast

The total cost of the project

$1M

Construction of new transfer hubs (ID 10.8)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The area of ​​most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.

The construction of technological zones of TPU will be carried out by the investor with subsequent transfer to the city. For TPU projects with separated technological and commercial facilities, the construction of the technological part will be financed from funds received from the sale of development rights to commercial real estate.

26 TPU projects were raffled off. As part of the implementation of these TPU projects, investors will build about 2.0 million square meters. m of total area of ​​real estate objects. The projected volume of private investment may amount to about 160.0 billion rubles.

Project implementation stage

Proposal

The need for additional funding

$9B

Place of implementation

Moscow

The total cost of the project

$9B

Fruit storage construction (ID 17.6)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a modern fruit storage facility for fruit storage

Infrastructure support:

1. Power: 8 MW;
2. Water: 6 m3/h;
3. Sewage: 6 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-2, Crimea.

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Tula Oblast

The total cost of the project

$5M

Construction of a distribution center (ID 17.10)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Organization of industrial real estate objects on the territory of the Tula region (distribution center, production and logistics complex, container hub).

Infrastructure support:

1. Power, MW 12:
2. Water, m3/hour:20 ;
3. Sewage, m3/hour: 20 ;
4. Gas, m3/hour: 15 ;
5. The nearest federal highway: M-4, Don.

Project implementation stage

Proposal

The need for additional funding

$40M

Place of implementation

Tula Oblast

The total cost of the project

$40M

Creation of an industrial aquaculture cluster (ID 11.24)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky district

Infrastructure support:

1. The nearest federal highway: A-107 (17 km), A-113 (17 km)

Project implementation stage

Proposal

The need for additional funding

$61M

Place of implementation

Moscow Oblast

The total cost of the project

$61M

Construction of a goat farm (ID 11.26)

NPV
IRR
РВР
- - 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a goat farm with 6,400 milking goats in Shchelkovo district
Main consumers are milk processing plants in Moscow and the Moscow Oblast (~4 million tonnes/year).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$13.5M

Place of implementation

Moscow Oblast

The total cost of the project

$13.5M

Construction of a plant protection center (ID 11.29)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Market launch of competitive, highly effective products

Field trials of new preparations, evaluation of active ingredients' efficiency, including biological, ecological, and chemical crop protection agents, and new preparative forms

Kashir district

Infrastructure support:

1. Power: 0,15 MW;
2. Water: 2 m3/h;
3. Sewage: 2 m3/h;
4. Gas: 0,3 m3/h;
5. The nearest federal highway: M-4 (6 km), M-6 (6,2 km)

Project implementation stage

Proposal

The need for additional funding

$9M

Place of implementation

Moscow Oblast

The total cost of the project

$9M

Establishment of an advanced milk processing production facility (ID 11.30)

NPV
IRR
РВР
- 19.5% 120 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.

Infrastructure support:

1. Power: MW: 380/220 W is needed;
2. Water: m3/h: hot water - 0.5 and cold water - 9;
3. Sewage: 9.5 m3/h;
4. The nearest federal highway: A-108, A-107, A-104, P-113.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$6.4M

Place of implementation

Moscow Oblast

The total cost of the project

$6.4M

Construction of a robotised dairy farm (ID 6.26)

NPV
IRR
РВР
$120K 16.04% 96 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a robotised dairy farm
The Robotised Dairy Farm will utilise the high genetic potential of cattle to ensure a high level of productivity, the safety of breeding stock, and effective disease prevention.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 8 m3/h
3. Sewage: 7 m3/h
4. Gas: 10 m3/h

Implementation period

11 months

Project implementation stage

Proposal

The need for additional funding

$2.5M

Place of implementation

Kaluga Oblast

The total cost of the project

$2.5M

Construction of a cattle farm (ID 6.27)

NPV
IRR
РВР
$200K 16.95% 88 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a cattle farm

The main area of specialisation in agricultural production is meat stockbreeding. The project uses cow-calf technology. The daily weight gain is 1–1.2 kg. The fattening period is 6–8 months. The sale weight of calves is 250-280 kg.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 8 m3/h
4. Gas: 11 m3/h

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$400K

Place of implementation

Kaluga Oblast

The total cost of the project

$400K

Construction of a food processing plant (ID 6.18)

NPV
IRR
РВР
$220K 24% 68 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of food products, a milk processing plant

The project will produce dairy food products. The main products are milk, cheese, cottage cheese, yogurt, butter, and sour cream.

Infrastructure support:

1. Power: 0.5 MW
2. Water supply: 10 m3/h
3. Sewage: 4 m3/h
4. Gas: 34 m3/h
5. The nearest federal highway: M-3 (40 km)

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$1.3M

Place of implementation

Kaluga Oblast

The total cost of the project

$1.3M

Creation of a complex for the production of cow and buffalo milk (ID 11.19)

NPV
IRR
РВР
$21M 5,4% 156 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$66,2M

Place of implementation

Moscow Oblast

The total cost of the project

$66,2M

Creation of a rabbit breeding farm (ID 2.1)

NPV
IRR
РВР
$4M - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of a working rabbit farm with 18 fattening and rearing houses with a capacity of 1,430 females. 

Infrastructure support:

1. Power: connection point at a distance of 100 m;
2. Water: connection point at a distance of 100 m;
3. Gas: connection point at a distance of 100 m.

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$17M

Place of implementation

Bryansk Oblast

The total cost of the project

$17M

Construction of a polymer processing plant (ID 6.4)

NPV
IRR
РВР
$2M 21% 54 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of plastic products.

Infrastructure support:

1. Power: 0.5 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 35 m3/h
5. The nearest federal highway: M-3, 17 km

Implementation period

5 months

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Kaluga Oblast

The total cost of the project

$10M

Construction of a polymer processing plant (ID 6.5)

NPV
IRR
РВР
$7M 19% 73 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a polymer processing plant.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 64 m3/h
5. The nearest federal highway: M-3, 900 m

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$6M

Place of implementation

Kaluga Oblast

The total cost of the project

$6M

Construction of a polymer processing plant (ID 6.6)

NPV
IRR
РВР
$648K 22% 75 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of woven packaging (raffia).

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 37 m3/h
5. The nearest federal highway: M-3, 2.4 km

Implementation period

14 months

Project implementation stage

Proposal

The need for additional funding

$1M

Place of implementation

Kaluga Oblast

The total cost of the project

$1M

Construction of a polymer processing plant (ID 6.7)

NPV
IRR
РВР
$21M 19% 80 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a polymer processing plant.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 44 m3/h
5. The nearest federal highway: M-3, 2.4 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$20M

Place of implementation

Kaluga Oblast

The total cost of the project

$20M

Construction of a polymer processing plant (ID 6.8)

NPV
IRR
РВР
$2M 19% 85 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of polymer fibers.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 49 m3/h
5. The nearest federal highway: M-3, 2.4 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Construction of a polymer processing plant (ID 6.10)

NPV
IRR
РВР
$18M 19% 90 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of a plant for the production of BOPP membraine liner.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 68 m3/h
5. The nearest federal highway: M-3, 2.4 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$16M

Place of implementation

Kaluga Oblast

The total cost of the project

$16M

Construction of a polymer processing plant (ID 6.11)

NPV
IRR
РВР
$2M 19% 83 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of polyethylene film.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 68 m3/h
5. The nearest federal highway: M-3, 2.4 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Organization of production of synthetic resins (ID 5.6)

NPV
IRR
РВР
- 21% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Establishment of an enterprise for the production of synthetic resins.

Infrastructure support:

1. Power, MW: 20;
2. Water, m3/hour: 60;
3. Gas, m3/hour: 32 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Implementation period

7 years

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Ivanovo Oblast

The total cost of the project

$10M

Dairy farming and milk production (single-cycle farm-complex) (ID 16.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Investment project for the construction of three dairy complexes (farms) with a total herd size of up to 10,000 cows, as well as a milk processing plant.

Sources of capital investment: own and borrowed funds raised by the company.

Creation of at least 600 employment positions, including about 360 at all farms and 240 at the dairy processing plant.

Implementation period

40 months

Project implementation stage

Proposal

The need for additional funding

$162.2M

Place of implementation

Tver Oblast

The total cost of the project

$162.2M

Construction of a dairy farm (ID 17.14)

NPV
IRR
РВР
- - 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a dairy farm

Infrastructure support:

1. Power: 8 MW;
2. Water: 9 m3/h;
3. Sewage: 9 m3/h;
4. Gas: 6 m3/h;
5. The nearest federal highway: M-4 "Don", M-2 "Crimea Highway".

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Tula Oblast

The total cost of the project

$27M

Construction of a plant for advanced processing of coarse grains for the production of amino acids (ID 17.15)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Project for the construction of a plant for the deep processing of coarse grains to produce amino acids and other functional additives for the agricultural and food industries

Infrastructure support:

1. Power: 9 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$39.2M

Place of implementation

Tula Oblast

The total cost of the project

$39.2M

Construction of an acetic acid plant (ID 17.20)

NPV
IRR
РВР
- - 96 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of acetic acid by fermentation and chemical processing of products from destructive distillation of wood

Infrastructure support:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$40.5M

Place of implementation

Tula Oblast

The total cost of the project

$40.5M

Creation of a cattle farm (ID 17.22)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project aims to increase the production of livestock products (milk and meat) through the construction of closed-type farms with year-round stabling of cattle.

Infrastructure support:

1. Power: 9 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Tula Oblast

The total cost of the project

$7M

Construction of an extraction plant for processing soybean and rapeseed (ID 17.23)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of an extraction complex for processing soybean and rapeseed

Infrastructure support:

1. Power: 14 MW;
2. Water: 15 m3/h;
3. Sewage: 15 m3/h;
4. Gas: 9 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$54M

Place of implementation

Tula Oblast

The total cost of the project

$54M

Construction of a line elevator with grain cleaning and drying equipment (ID 17.29)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The project is aimed at building a modern linear elevator with a storage capacity of 100,000 tonnes, including grain cleaning and drying equipment. The maximum investment amount is $4.05 million. The project is expected to create 45 employment placements.

Infrastructure support:

1. Power: 10 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Tula Oblast

The total cost of the project

$4M

Construction of a sugar beet processing plant (ID 17.34)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a sugar beet processing complex

Infrastructure support:

1. Power: 8 MW;
2. Water: 11 m3/h;
3. Sewage: 11 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$11M

Place of implementation

Tula Oblast

The total cost of the project

$11M

Construction of a horticultural processing plant (ID 17.40)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a horticultural processing complex.

Infrastructure support:

1. Power: 2 MW;
2. Water: 9 m3/h;
3. Sewage: 9 m3/h;
4. Gas: 2 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway".

Project implementation stage

Proposal

The need for additional funding

$55.4M

Place of implementation

Tula Oblast

The total cost of the project

$55.4M

Construction of a congress and exhibition complex (ID 11.38)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilities

Infrastructure support:

1. Power: 32.93 MW required;
2. Water: m3/h: 1,553 m3/day required;
3. Sewage: m3/h: 1,467 m3/day required;
4. Gas m3/h: 15,500 m3/h required;
5. The railway line: "Krasnogorsk-Khimki-Sheremetyevo" LRT projected station is planned;
6. The nearest federal highway: access to the M11, International Route is planned.

Project implementation stage

Proposal

The need for additional funding

$676M

Place of implementation

Moscow Oblast

The total cost of the project

$676M

Organization of production of products based on surfactants (ID 5.5)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the manufactoring of products based on surfactants is being created. The main products are detergents and cleaning products, laundry and toilet soap, personal hygiene products.

Infrastructure support:

1. Power: 20 MW;
2. Water: 60 m3/h;
3. Gas 35 Gcal/hour;
4. Inventory of branch railway line;
5. The nearest federal highway M-7 (100 km):

Implementation period

16 months

Project implementation stage

Proposal

The need for additional funding

$6M

Place of implementation

Ivanovo Oblast

The total cost of the project

$6M

Construction of a plant for the production of carbamide (ID 17.12)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

The production of urea (urea) is a chemical compound, carbonic acid diamide. White crystals, soluble in polar solvents (water, ethanol, liquid ammonia).

Infrastructure support:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-2 Crimea:

Project implementation stage

Proposal

The need for additional funding

$270M

Place of implementation

Tula Oblast

The total cost of the project

$270M

Establishment of a plant for the production of components for composite materials (ID 17.30)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of small-tonnage chemical production of components for high-tech polymer composite materials. Production of phthalonitriles. Binders based on phthalonitrile resins.

Infrastructure support:

1. Power: 100 MW;
2. Water: 1,000 m3/h;
3. Sewage: 7,000 m3/h;
4. Gas: 100 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-4 Don (1 km):

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Tula Oblast

The total cost of the project

$2M

Establishment of production of plastic products (ID 17.33)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

Plant for the production of plastics using natural or synthetic polymers.

Infrastructure support:

1. Power: 50 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-2, Crimea:

Project implementation stage

Proposal

The need for additional funding

$20M

Place of implementation

Tula Oblast

The total cost of the project

$20M

Construction of a plant for the production of monoethylene glycol (ID 17.37)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

Production of monoethylene glycol MEG-300

Infrastructure support:

1. Power: 30 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway: N4 "Don".

Project implementation stage

Proposal

The need for additional funding

$381M

Place of implementation

Tula Oblast

The total cost of the project

$381M

Construction of the “Space City” theme park (ID 6.24)

NPV
IRR
РВР
$170K 24.3% 61 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a theme park on a 17,000 sq m land area. Estimated number of visits - 200 people/day.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 3 m3/h
3. Sewage: 3 m3/h
4. Gas: 7 m3/h

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$12M

Place of implementation

Kaluga Oblast

The total cost of the project

$12M

Construction of a methanol plant (ID 17.39)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a methanol plant

Infrastructure support:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. The nearest federal highway: M-2 "Crimea" M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$252M

Place of implementation

Tula Oblast

The total cost of the project

$252M

Construction of congress and exhibition, hotel, trade and entertainment infrastructure facilities (ID 11.2)

NPV
IRR
РВР
- - 5 years

Objective of the project

Creation of a new production

Brief description and idea

The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure. 

Infrastructure support:

1. The nearest federal highway: M-4 "Don Highway", A-105, A-107, M-2

Project implementation stage

Proposal

The need for additional funding

$5.1B

Place of implementation

Moscow Oblast

The total cost of the project

$5.1B

Creation of a multifunctional hotel complex (ID 17.2)

NPV
IRR
РВР
- - 7.2 years

Objective of the project

Creation of a new production

Brief description and idea

The creation of a multifunctional five-star hotel complex.

The complex will include a hotel, a restaurant, a bar with roof access, a fitness club, a high-class spa center, bank offices, parking lots.

Project implementation stage

Proposal

The need for additional funding

$20.3M

Place of implementation

Tula Oblast

The total cost of the project

$20.3M

Recreational theme park (ID 11.27)

NPV
IRR
РВР
- - 144 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".

Infrastructure support:

1. Power: MW, at the border;
2. Water: m3/h, at the border;
3. Sewage: m3/h, at the border;
4. Gas: m3/h, at the border;
5. The railway line: Shmatovo railway station (1.6 km);
6. The nearest federal highway: M-4 "Don" (15.1 km).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$92M

Place of implementation

Moscow Oblast

The total cost of the project

$11M

Construction of a hotel in a ski complex (ID 11.31)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.

Infrastructure support:

1. Power: MW; 10 kV own independent transmission line, provides full power supply to the resort;
2. Water: m3/hour; 560 m3/day own water intake for domestic drinking water supply;
3. Sewage: m3/h; 200 m3/day own treatment facilities for domestic wastewater;
4. Gas: 1.08 m3/h;
5. The nearest federal highway: 45.0 km away from MKAD (The Moscow Automobile Ring Road), and 7.0 km away from the "Moscow-Dubna" highway.

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Moscow Oblast

The total cost of the project

$5M

Manor restoration with adaptations to the chosen function of the site (ID 11.36)

NPV
IRR
РВР
- - -

Brief description and idea

Restoration of a cultural heritage site with adaptation to the chosen function of the site

Infrastructure support:

1. Power: available;
2. The nearest federal highway: M-5 "Ural Highway"(6 km)

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Creation of an all-season multifunctional, eco-educational, and recreational tourist complex (ID 11.39)

NPV
IRR
РВР
$13M 56% 44.3 months

Objective of the project

Creation of a new production

Brief description and idea

A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:
-five-star "Zoo-Safari" style hotel with panoramic glazing;
-a glass multi-hall restaurant;
- "Zoo Water Park" with a fitness and spa center in a glass building with a similar congress center;
- "The International Children's Academy of Ecology and Zoology"
- and other infrastructure facilities of the modern tourism industry
"The International Children's Academy of Ecology and Zoology, located near Moscow Safari Park, will contribute to the ecological and patriotic education of the youth.

Implementation period

27 months

Project implementation stage

Proposal

The need for additional funding

$16.4M

Place of implementation

Moscow Oblast, Chekhov district, Meshcherskoye area

The total cost of the project

$16.4M

Preservation project for a cultural heritage object (ID 6.22)

NPV
IRR
РВР
$1.2M 25.35% 82 months

Objective of the project

Creation of a new production

Brief description and idea

The purpose of the project is the reconstruction of the manor into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region and the proximity of the Moscow Oblast, the expected number of visitors is at least 20,000 people per year.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 2 m3/h
3. Sewage: 2 m3/h
4. Gas: 3 m3/h
5. The nearest federal highway: A-108 highway

Implementation period

33 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Construction of a tourism and hotel complex (ID 6.23)

NPV
IRR
РВР
$300K 21.45% 98 months

Objective of the project

Creation of a new production

Brief description and idea

Renovation of the manor
The complex will be used to accommodate the staff of the existing residents of the "Vorsino" Industrial Park and the special economic zone of industrial and production type "Kaluga" Borovskaya site, as well as to promote tourism in the region.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 7 m3/h
3. Sewage: 7 m3/h
4. Gas: 17 m3/h

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Construction of a plant for the production of composite cylinders (ID 17.41)

NPV
IRR
РВР
- - 54 months

Objective of the project

Creation of a new production

Brief description and idea

Establishment of the production of high-pressure composite cylinders.

Infrastructure support:

1. Power, MW: 100,
2. Water: m3/hour: 1,000;
3. Sewage: m3/hour: 7,000;
4. Gas: m3/hour: 1,000;
5. Inventory of branch railway line
6. The nearest federal highway: M-4 Don (1 km)

Project implementation stage

Proposal

The need for additional funding

$41M

Place of implementation

Tula Oblast

The total cost of the project

$41M

Complex for the production of nitric acid and ammonium nitrate (ID 17.43)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a complex for the production of nitric acid with a capacity of 270 thousand tons per year and ammonium nitrate with a capacity of 340 thousand tons per year.

Infrastructure support:

1. Power, MW: 20,
2. Water: m3/hour: 100;
3. Sewage: m3/hour: 100;
4. Gas: m3/hour: 450;
5. Inventory of branch railway line
6. The nearest federal highway: M-2 Crimea

Project implementation stage

Proposal

The need for additional funding

$93M

Place of implementation

Tula Oblast

The total cost of the project

$93M

Creation of a complex for the production of ammonia and carbamide (ID 17.44)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of an ammonia production complex with a capacity of 525 thousand tons per year and carbamide with an output of 700 thousand tons per year.

Infrastructure support:

1. Power, MW: 15,
2. Water: m3/hour: 100;
3. Sewage: m3/hour: 100;
4. Gas: m3/hour: 450;
5. Inventory of branch railway line
6. The nearest federal highway: M-2 Crimea

Project implementation stage

Proposal

The need for additional funding

$551M

Place of implementation

Tula Oblast

The total cost of the project

$551M

Creation of a year-round “car camping” area (ID 17.13)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms. The concept of the project aims to preserve the area and, at the same time, create a comfortable setting for outdoor recreation at all times of the year.

Infrastructure support:

1. Power: 9 MW;
2. Water: 17 m3/h;
3. Sewage: 17 m3/h;
4. Gas: 11 m3/h;
5. The nearest federal highway: M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$13.5M

Place of implementation

Tula Oblast

The total cost of the project

$23M

Construction of a complex for the production of ammonia and carbamide (ID 17.45)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The complex of ammonia and carbamide AMKAR-1400, manufacturing productivity estimates 3,000 tons of ammonia and 4,200 tons of carbamide per day. The project is directed at increasing the export capacity of Tula Oblast, production release with higher added value cost.

Infrastructure support:

1. Power, MW: 25;
2. Water: m3/hour: 80;
3. Sewage: m3/hour: 80;
4. Gas: m3/hour: 340;
5. The nearest federal highway: M-4 Don.

Project implementation stage

Proposal

The need for additional funding

$847M

Place of implementation

Tula Oblast

The total cost of the project

$847M

Creation of a “car camping” area (ID 17.21)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms.

Infrastructure support:

1. Power: 6 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$5.4M

Place of implementation

Tula Oblast

The total cost of the project

$12.1M

Reconstruction of a health resort complex (ID 17.27)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The reconstruction of the health resort complex Sanatorium "Krainka" involves the modernisation of infrastructure, improvement of accommodation facilities, improvement of the adjoining territory, and an increase of the number of available accommodation places.

Infrastructure support:

1. Power: 8 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway"

Project implementation stage

Proposal

The need for additional funding

$13.5M

Place of implementation

Tula Oblast

The total cost of the project

$13.5M

Construction of a chain hotel (ID 17.32)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a 150-bed 2 or 3-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".

Infrastructure support:

1. Power: 3 MW;
2. Water: 2 m3/h;
3. Sewage: 2 m3/h;
4. Gas: 4 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway", M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$8.1M

Place of implementation

Tula Oblast

The total cost of the project

$8.1M

Construction of an international chain hotel (ID 17.38)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a 750-bed 5-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".

Infrastructure support:

1. Power: 6 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 9 m3/h;
5. The nearest federal highway: M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$40.5M

Place of implementation

Tula Oblast

The total cost of the project

$40.5M

Children’s recreation center (ID 6.20)

NPV
IRR
РВР
$912K 15% 76 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of infrastructure for food, accommodation and active recreation with a year-round stay.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 9 m3/h
4. Gas: 16 m3/h
5. The nearest federal highway: M-3, 7 km away

Implementation period

16 months

Project implementation stage

Proposal

The need for additional funding

$1.3M

Place of implementation

Kaluga Oblast

The total cost of the project

$1.3M

Amusement park (ID 11.11)

NPV
IRR
РВР
$85M 23% 101 months

Objective of the project

Creation of a new production

Brief description and idea

The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.

Infrastructure support:

1. Water: 10,401 m3/h;
2. Sewage: 10,401 m3/h;
3. Gas: 1,214,000 m3/h;
4. The nearest federal highway: Dmitrovskoe highway, 17 km from Moscow Ring Road.

Project implementation stage

Proposal

The need for additional funding

$149M

Place of implementation

Moscow Oblast

The total cost of the project

$149M

Organization of geotextiles production (ID 5.8)

NPV
IRR
РВР
$4.4M 18% 60 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the production of geotextiles.

Infrastructure support:

1. Power: 8 MW;
2. Water: 550 m3/h;
3. Sewage: 160 m3/h;
4. Gas: 40,000 m3/h;
5. Railway: on request;
6. The nearest federal highway: M-7, 100 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$32M

Place of implementation

Ivanovo Oblast

The total cost of the project

$32M

Production of sanitary ware products from ceramic masses (ID 6.29)

NPV
IRR
РВР
$3.4M 20.15% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a factory for the production of sanitary ware products from raw materials extracted in the Ulyanovsk region. The main products are sanitary ware made of ceramic masses.

Infrastructure support:

1. Power: 2 MW
2. Water supply: 20 m3/h
3. Sewage: 10 m3/h
4. Gas: 400 m3/h

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$30M

Place of implementation

Kaluga Oblast

The total cost of the project

$30M

Factory for the production of dosage forms (ID 6.16)

NPV
IRR
РВР
$8M 53% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a factory for the production of finished dosage forms. The number of jobs created is 225.

Infrastructure support:

1. Power: 2 MW
2. Water supply: 14 m3/h
3. Sewage: 4 m3/h
4. Gas: 25 m3/h
5. The nearest federal highway: M-3 (6 km), A-108 (4 km)

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$38M

Place of implementation

Kaluga Oblast

The total cost of the project

$38M

Mini excavators production (ID 5.4)

NPV
IRR
РВР
$1.7M 21% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an enterprise for the mini excavator's production.

Infrastructure support:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. The nearest federal highway: M-7, 100 km.

Implementation period

4 months

Project implementation stage

Proposal

The need for additional funding

$1.6M

Place of implementation

Ivanovo Oblast

The total cost of the project

$1.6M

Construction of a factory for the automotive components production (ID 6.1)

NPV
IRR
РВР
$77M 53% 60 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a factory for the production of automotive components for Volkswagen, Skoda, Volvo, Renault, Mitsubishi car brands.

Infrastructure support:

1. Power: 4 MW
2. Water supply: 6 m3/h
3. Sewage: 6 m3/h
4. Gas: 215 m3/h
5. The nearest federal highway: M-3, 6 km

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$18M

Place of implementation

Kaluga Oblast

The total cost of the project

$18M

Construction of a woodworking factory (ID 16.1)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation and development of a modern timber industry enterprise - a woodworking factory. The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging transport.

Project implementation stage

Proposal

The need for additional funding

$9.4M

Place of implementation

Tver Oblast

The total cost of the project

$9.4M

Production of MDF boards (ID 7.1)

NPV
IRR
РВР
$17M 33.6% 57.6 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.

Infrastructure support:

1. Power: 250 MW and 4,934 MW;
2. Water: up to 20 m3/h, the possibility of artesian wells construction;
3. Sewage: construction of local cleaning facilities.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$33M

Place of implementation

Kostroma Oblast

The total cost of the project

$33M

The program for creating a new production of grinding balls (ID 3.3)

NPV
IRR
РВР
$5.2M 25% 48 months

Objective of the project

Creation of a new production

Brief description and idea

The main goal of the project is to create a new production facility equipped with modern, energy-efficient devices to make a profit through the sale of manufactured products: steel grinding balls with a diameter of 30-100 mm.

Infrastructure support:

1. Power: 13 MW;
2. Water: 71.67 m3/h;
3. Sewage: 71.67 m3/h;
4. Gas: 2,000 m3/h;
5. The nearest federal highway: M-7, 0.1 km.

Implementation period

16 months

Project implementation stage

Proposal

The need for additional funding

$14M

Place of implementation

Vladimir Oblast

The total cost of the project

$14M

Construction of a plant for the production of cast iron and steel casting (ID 6.15)

NPV
IRR
РВР
$4.4M 14.48% 120 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of cast iron and steel: plumbing casting (plumbing and accessories), accessories for anchor-rail fastening, artistic casting.

Infrastructure support:

1. Power: 3 MW
2. Water supply: 18 m3/h
3. Sewage: 18 m3/h
4. Gas: 1900 m3/h
5. The nearest federal highway: M-3, 5,5 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$432M

Place of implementation

Kaluga Oblast

The total cost of the project

$432M

Construction of a plant for the production of radio and mobile communications (ID 6.17)

NPV
IRR
РВР
$4.4M 18.71% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of radio and mobile communications.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 4 m3/h
3. Sewage: 4 m3/h
4. Gas: 15 m3/h
5. The nearest federal highway: M-3, 1.5 km

Project implementation stage

Proposal

The need for additional funding

$76M

Place of implementation

Kaluga Oblast

The total cost of the project

$76M

Construction of a polymer processing plant (ID 6.9)

NPV
IRR
РВР
$1.5M 27% 59 months

Objective of the project

Creation of a new production

Brief description and idea

The project is aimed at the construction of a thermoforming plant for products.

Infrastructure support:

1. Power: 1 MW
2. Water supply: 9 m3/h
3. Sewage: 7 m3/h
4. Gas: 60 m3/h
5. The nearest federal highway: M-3, 2.4 km

Implementation period

11 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M