About branch
Projects 0
Currently there are no projects with these parameters.Please try another.
Objective of the project
Creation of a new productionBrief description and idea
Development and modernization of power supply systems.Project implementation stage
ProposalThe need for additional funding
$31MPlace of implementation
Voronezh OblastThe total cost of the project
$31MObjective of the project
Creation of a new productionBrief description and idea
Construction of 9 waste management facilities: MSW landfills and waste sorting complexes in the Voronezh region.Infrastructure support:
1. Electricity: 6,49 MW;Project implementation stage
ProposalThe need for additional funding
$2,8MPlace of implementation
Voronezh OblastThe total cost of the project
$2,8MObjective of the project
Creation of a new productionBrief description and idea
Concession transfer of heat and power facilities (22 municipal boiler houses).Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Voronezh OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the processing of municipal solid waste using promising methods of recycling waste as material and energy resources.Infrastructure support:
1. Power: 8,38 MW;Project implementation stage
ProposalThe need for additional funding
$52MPlace of implementation
Voronezh OblastThe total cost of the project
$52MObjective of the project
Creation of a new productionImplementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$1,9MPlace of implementation
Belgorod OblastThe total cost of the project
$1,9MObjective of the project
Creation of a new productionImplementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$1.9MPlace of implementation
Belgorod OblastThe total cost of the project
$1.9MObjective of the project
Creation of a new productionBrief description and idea
Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.Infrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Belgorod OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Industrial Technologies Park JSC (Park INTECH JSC) is implementing an investment project for the construction of a public research and production technology center in the Yaroslavl region with the involvement of foreign capital - a Technopark to improve hydrocarbon processing processes and create environmentally friendly hydrocarbon and alternative motor fuels.Infrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$729MPlace of implementation
Yaroslavl OblastThe total cost of the project
$729MInfrastructure support:
As part of the project, it is planned to create a scientific reserve and develop a set of technological approaches to ensure the possibility of cost-effective processing of any type of gypsum-containing waste (GSO):Project implementation stage
ProposalThe need for additional funding
$18MPlace of implementation
Belgorod OblastThe total cost of the project
$18MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of the production of LED products as part of the development of the Russian Federation's program for a gradual transition to energy-saving technologies and the abandonment of traditional light sources.Infrastructure support:
1. Power: 0,25-14,98 MW;Project implementation stage
ProposalThe need for additional funding
$36MPlace of implementation
Orlov OblastThe total cost of the project
$36MObjective of the project
Creation of a new productionBrief description and idea
The project is aimed at creating favorable living conditions for citizens, promoting the renewal of their living environment and the development of public space, as well as preventing the growth of emergency housing stock in the city of Moscow.Project implementation stage
ProposalThe need for additional funding
$81BPlace of implementation
MoscowThe total cost of the project
$81BObjective of the project
Creation of a new productionBrief description and idea
The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.Project implementation stage
ProposalThe need for additional funding
$1BPlace of implementation
MoscowThe total cost of the project
$1BObjective of the project
Creation of a new productionBrief description and idea
The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8000 m2, with an emphasis on self-service, low prices and high throughput.Infrastructure support:
1. Power: 0,4 and 1 MW;Implementation period
Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)Project implementation stage
ProposalThe need for additional funding
$1,7MPlace of implementation
Moscow OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
The construction of a modern congress and exhibition center in Voronezh will create a platform for major events at the regional, interregional and federal levels.Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Voronezh OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.Infrastructure support:
1. Power, MW: there is a substation for 800 kW on the territory of the plant;The need for additional funding
$20MPlace of implementation
Moscow OblastThe total cost of the project
$28MObjective of the project
Creation of a new productionBrief description and idea
It is planned to create production lines, including the following stages of production:Infrastructure support:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;Project implementation stage
ProposalThe need for additional funding
$13MPlace of implementation
Orlov OblastThe total cost of the project
$13MObjective of the project
Creation of a new productionBrief description and idea
The project envisages the production of electric stoves with several hermetic levels, using energy-saving technology, as well as the possible production of built-in ovens and built-in hobs.Infrastructure support:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;Project implementation stage
ProposalThe need for additional funding
$47MPlace of implementation
Orlov OblastThe total cost of the project
$47MObjective of the project
Creation of a new productionBrief description and idea
The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.Infrastructure support:
The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.Project implementation stage
ProposalThe need for additional funding
$486MPlace of implementation
MoscowThe total cost of the project
$486MObjective of the project
Creation of a new productionBrief description and idea
The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.Project implementation stage
ProposalThe need for additional funding
$105MPlace of implementation
MoscowThe total cost of the project
$105MObjective of the project
Creation of a new productionBrief description and idea
Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.Infrastructure support:
1. Power, MW: 0.4;Project implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Moscow OblastThe total cost of the project
$10MObjective of the project
Creation of a new productionBrief description and idea
Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.Infrastructure support:
1. The nearest federal highway: M-7 Volga - 11 km, MKAD - 15 km.The need for additional funding
$4MThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
Construction of an enterprise for the extraction of granite and the production of non-metallic materials.Infrastructure support:
1. Power, MW: 5.01;Implementation period
30 monthsThe need for additional funding
$120MPlace of implementation
Voronezh OblastThe total cost of the project
$120MBrief description and idea
It is planned to create the production of ceramic refractory products of several types.Infrastructure support:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;Project implementation stage
ProposalThe need for additional funding
$13MPlace of implementation
Orlov OblastThe total cost of the project
$13MObjective of the project
Creation of a new productionBrief description and idea
"It is planned to create the production of ceramic sanitary ware. The production line consists of:Infrastructure support:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;Project implementation stage
ProposalThe need for additional funding
$60MPlace of implementation
Orlov OblastThe total cost of the project
$60MObjective of the project
Creation of a new productionBrief description and idea
Establishment of an enterprise for the production of ShMAS (Crushed Stone-Mastic Asphalt Concrete Mix) by mixing waste paper and bitumen. The main purpose of the application is to increase the bituminous film, which helps to protect the asphalt from delamination.Implementation period
10 monthsThe need for additional funding
$702 thousandPlace of implementation
Belgorod OblastThe total cost of the project
$702 thousandObjective of the project
Creation of a new productionBrief description and idea
Creation of an enterprise for the production of ordinary ceramic bricks using plastic molding technology. This technology can be used to produce both hollow and solid bricks. At the same time, the brick is stronger and more durable than with semi-dry molding.Project implementation stage
ProposalThe need for additional funding
$20MPlace of implementation
Belgorod OblastThe total cost of the project
$20MObjective of the project
Creation of a new productionBrief description and idea
1. Power, MW: to be specified;Infrastructure support:
1. Power, MW: to be specified;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$33MPlace of implementation
Yaroslavl OblastThe total cost of the project
$33MObjective of the project
Creation of a new productionBrief description and idea
Organization of the production of high-quality pigment necessary for coloring such materials as brick, roofing tiles, paving slabs, rubber and paint products, polymers, fabrics and paper.Implementation period
51 monthsProject implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Yaroslavl OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.Infrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$283MPlace of implementation
Kostroma OblastThe total cost of the project
$283MObjective of the project
Creation of a new productionBrief description and idea
The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.Infrastructure support:
The industrial site has all the necessary engineering infrastructure: power supply, gas supply, water supply and sanitation, access roads and railways. The distance from the industrial site to the Tomarovka railway station is 22 km. The site has storage areas for raw materials and finished products.Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$24MPlace of implementation
Belgorod OblastThe total cost of the project
$24MObjective of the project
Creation of a new productionBrief description and idea
It is planned to build an enterprise for the extraction and processing of celestite ores.Infrastructure support:
More than 20 deposits of strontium ores with total predicted resources of about 200 million tons have been discovered. In the Tula region, the Tabolskoye deposit has been explored and about 30 ore occurrences have been discovered.Project implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Tula OblastThe total cost of the project
$29MObjective of the project
Creation of a new productionBrief description and idea
The project involves the production of various types of gypsum binders and products based on them: dry mixes (SGS), tongue-and-groove slabs (GWP), gypsum boards (GKL).Infrastructure support:
One of the largest gypsum deposits is located on the territory of the Ryazan region, the reserves of which are sufficient for the implementation of a large-scale investment project: the Lazinskoye deposit in the Skopinsky district with balance reserves of gypsum of more than 300 million tons.Project implementation stage
ProposalThe need for additional funding
$121MPlace of implementation
Ryazan OblastThe total cost of the project
$121MObjective of the project
Creation of a new productionBrief description and idea
It is planned to create the production of clinker tiles. Products are manufactured on a conveyor line. Each of its components is an independent unit, with the possibility of replacement.Infrastructure support:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Orlov OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
Creation of an enterprise for the production of gray cement using the Shebekinsky chalk quarry as a raw material base.Infrastructure support:
The project is fully provided with raw materials. It is planned to use the existing open pit of CJSC Shebekino-mel (Logovoye deposit).Implementation period
22 monthsProject implementation stage
ProposalThe need for additional funding
$54MPlace of implementation
Belgorod OblastThe total cost of the project
$54MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.Infrastructure support:
1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Orlov OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of an enterprise for the production of refractory bricks. The scope of this brick as the main furnace material in civil engineering, municipal infrastructure of settlements, including boiler houses, thermal power plants.Infrastructure support:
1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);Project implementation stage
ProposalThe need for additional funding
$39MPlace of implementation
Orlov OblastThe total cost of the project
$39MObjective of the project
Creation of a new productionBrief description and idea
It is planned to create the production of panels for industrial housing construction:Infrastructure support:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Orlov OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.Infrastructure support:
1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);The need for additional funding
$3MPlace of implementation
Orlov OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Organization of modern production of new building material on the basis of the existing expanded clay plant of the former ZhBI-3 plant, located in the town of Stroitel, Yakovlevsky district, Belgorod region, by modernizing it.Infrastructure support:
The project site is currently an industrial site of the PDS BS group of companies (the territory of the former ZHBI-3 Plant OJSC, with an area of about 30 hectares, including about 6.7 hectares occupied by an industrial complex for the production of expanded clay.Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Belgorod OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Manufacture of finishing products and construction products.Infrastructure support:
1. The nearest federal highway: M-1 (24 km), M-9 (42 km).Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Moscow OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Construction of the first stage of the plant for the production of cement.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$600MPlace of implementation
Kaluga OblastThe total cost of the project
$621MBrief description and idea
Construction of the second stage of the plant for the production of cement.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$148MPlace of implementation
Kaluga OblastThe total cost of the project
$148MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of wood-based sheet materials in order to meet the needs of the domestic market for high-quality and competitive domestic timber and paper products, ensure environmental safety, and sustainably meet public needs for forest resources and services.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
4 monthsProject implementation stage
ProposalThe need for additional funding
$304 thousandPlace of implementation
Kaluga OblastThe total cost of the project
$304КObjective of the project
Creation of a new productionBrief description and idea
Development of the Ulyanovsk deposit of refractory and refractory clays and construction of a factory for processing the extracted raw materials. The region has a developed mineral resource base, which makes it possible not only to maintain the region's high industrial potential, but also to export certain types of mineral raw materials and products of its processing to neighboring regions of Russia.Implementation period
12 monthsThe need for additional funding
$62MPlace of implementation
Kaluga OblastThe total cost of the project
$62MObjective of the project
Creation of a new productionBrief description and idea
It is planned to use the current output of ash and slag waste (ASW) from thermal power plants for the production of finished ash and slag materials (ASM) suitable for use in the building materials industry.The need for additional funding
$20-27MPlace of implementation
Ryazan OblastThe total cost of the project
$20-27MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the processing of celestite ores.Infrastructure support:
1. Power, MW: 16;Project implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Tula OblastThe total cost of the project
$29MBrief description and idea
Construction of a plant for the production of radio-transparent and radio-absorbing materialsInfrastructure support:
1. Power, MW: 100;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Tula OblastThe total cost of the project
$27MBrief description and idea
Construction of an enterprise for the extraction of gypsum stone at the Bolokhovsky, Obolensky, Skuratovsky deposits.Infrastructure support:
1. Power, MW: 30;Project implementation stage
ProposalThe need for additional funding
$67MPlace of implementation
Tula OblastThe total cost of the project
$67MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of varnishes, paints, enamels, primers, adhesives, fillers, coloring pigments and drying oils.Infrastructure support:
1. Power, MW: 60;Project implementation stage
ProposalThe need for additional funding
$13MPlace of implementation
Tula OblastThe total cost of the project
$13MObjective of the project
Creation of a new productionBrief description and idea
Construction of a modern production facility for the production of knitwear.Infrastructure support:
The capacity of the existing infrastructure of the 1st section:Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$21MPlace of implementation
Kaluga OblastThe total cost of the project
$21MObjective of the project
Creation of a new productionBrief description and idea
Creation of a modern competitive production of colorless and colored glass containers for the food industry.Infrastructure support:
1. Power, MW: FGC networks: 17;Project implementation stage
ProposalThe need for additional funding
$175MPlace of implementation
Voronezh OblastThe total cost of the project
$175MObjective of the project
Creation of a new productionBrief description and idea
Enterprise for the production of medical textiles. The main products are functional medical textiles.Infrastructure support:
1. Power, MW: 8;Project implementation stage
ProposalThe need for additional funding
$16MPlace of implementation
Ivanov OblastThe total cost of the project
$8MObjective of the project
Creation of a new productionBrief description and idea
Construction of a full-cycle enterprise for the production of finished leather in the Voronezh region.Infrastructure support:
1. Power, MW: 6.49;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Voronezh OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
The investment project provides for the creation of a new import-substituting full-cycle production in the Yaroslavl region - from high-tech pure-cellulose coated cardboard to the production of cardboard packaging. The finished products will be used in industries such as pharmaceuticals, food, in particular confectionery, perfumery and household chemicals, as well as in the tobacco industry and other industries where high-quality coated cardboard is required for packaging finished products.Infrastructure support:
1. Power, MW: 12;Implementation period
21 monthsProject implementation stage
ProposalThe need for additional funding
$56MPlace of implementation
Yaroslavl OblastThe total cost of the project
$56MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the creation on the territory of the Bryansk region of a modern, highly efficient production facility for the production of vials from medical glass of the second hydrolytic class to meet the demand of the pharmaceutical industry in high-quality medical glassware of domestic production.Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Bryansk OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
In the Ryazan region, taking into account ongoing projects for the development of pharmaceutical production and the formed negotiation portfolio of investment projects, it is planned to create a pharmaceutical cluster that includes high-tech production of medicines and vaccines.Project implementation stage
ProposalThe need for additional funding
$2-5BPlace of implementation
Ryazan OblastThe total cost of the project
$2-5BObjective of the project
Creation of a new productionBrief description and idea
Creation of a light rail transport system in Voronezh with elements of accelerated traffic in peripheral areas, with more sparse stops and increased intervals, and with more frequent stops in the middle and central partsInfrastructure support:
1. Power: 3,5 MW;Project implementation stage
ProposalThe need for additional funding
$676MPlace of implementation
Voronezh OblastThe total cost of the project
$676MObjective of the project
Creation of a new productionBrief description and idea
The project aims to build a plant for the production of automotive components.Infrastructure support:
1. Power: on request;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$13,5MPlace of implementation
Kaluga OblastThe total cost of the project
$13,5MObjective of the project
Creation of a new productionBrief description and idea
Development of the "RATAY" aeromobile aircraft complex for agricultural useInfrastructure support:
1. Power: MW: 800 KW;Project implementation stage
ProposalThe need for additional funding
$7,4MPlace of implementation
Moscow OblastThe total cost of the project
$7,4MObjective of the project
Creation of a new productionBrief description and idea
"ZOOTECH" is planning to establish the production of equipment for the production of protein-lipid concentrate (zooprotein) in the Lipetsk Oblast. The production cycle includes the process of producing complete modular lines for the production of protein-lipid concentrate for animal feed.Infrastructure support:
1. Power: 1 MW;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Lipetsk OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Creation of a high-tech full-cycle plant for car production. Total site area - 70,000 m2, production capacity - more than 300,000 vehicles per year.Infrastructure support:
1. Power: 40 MW;Project implementation stage
ProposalThe need for additional funding
$176MPlace of implementation
Lipetsk OblastThe total cost of the project
$176MObjective of the project
Creation of a new productionBrief description and idea
Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.Infrastructure support:
1. Power: 10 MW;Project implementation stage
ProposalThe need for additional funding
$9,5MPlace of implementation
Ivanovo OblastThe total cost of the project
$9,5MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of a plant for the production of self-destructing syringes of the third generation.Infrastructure support:
1. Power, MW: IDGC of Center Yarenergo;Implementation period
21 monthsProject implementation stage
ProposalThe need for additional funding
$1MPlace of implementation
Yaroslavl OblastThe total cost of the project
$1MObjective of the project
Creation of a new productionBrief description and idea
The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.Infrastructure support:
1. Power: 10 MW;Project implementation stage
ProposalThe need for additional funding
$11MPlace of implementation
Ivanovo OblastThe total cost of the project
$11MObjective of the project
Creation of a new productionBrief description and idea
The main goal of the investment project is to organize modern production of medicines in the form of tablets and capsules. The enterprise being created should ensure the uninterrupted production of a wide range of high-quality pharmaceutical products to meet the needs of all groups of the region's population in medicines at affordable prices, reduce Russia's dependence on imports of medicines and raw materials for their production.Infrastructure support:
The project site is currently an undeveloped land plot with an area of 24.3 hectares, 40 km from the city of Belgorod and 5 km from the town of Stroitel (the center of the municipality).Implementation period
30 monthsProject implementation stage
ProposalThe need for additional funding
$1BPlace of implementation
Belgorod OblastThe total cost of the project
$1BObjective of the project
Creation of a new productionBrief description and idea
"The Uzlovaya" Industrial Park was the site of one of Russia's largest car manufacturing projects in 2018, implemented by the Russian division of China's Great Wall Motor Company Limited.Infrastructure support:
1. Power: up to 100 MW;Project implementation stage
ProposalThe need for additional funding
$13,5MPlace of implementation
Tula OblastThe total cost of the project
$13,5MObjective of the project
Creation of a new productionBrief description and idea
The project involves the production of electric motors designed to convert energy. This type of device transforms electric power into motive power or mechanical work.Infrastructure support:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;Project implementation stage
ProposalThe need for additional funding
$122MPlace of implementation
Oryol OblastThe total cost of the project
$122MObjective of the project
Creation of a new productionBrief description and idea
The project involves creating a full production cycle for traction electric motors: producing components, assembling, and testing them.Infrastructure support:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;Project implementation stage
ProposalThe need for additional funding
$88MPlace of implementation
Oryol OblastThe total cost of the project
$88MObjective of the project
Creation of a new productionBrief description and idea
The planned commissioning date is 2023.Infrastructure support:
The industrial site has all necessary engineering infrastructure: power supply, gas supply, water supply, and sewage.Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Belgorod OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
Creation of production of high-temperature composite sealing materialsInfrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Tula OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
Organizing increased output of diesel engines with a prospective program of up to 3,000 engines per year at "Tulamashzavod". The project is aimed at reconstructing production facilities and purchasing the necessary equipment to expand production capacity and increase diesel engine output.Infrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Tula OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Creation of an organization for the production of polymer and composite coatings for aviation, rocket and space, special equipment, and other industriesInfrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$22MPlace of implementation
Tula OblastThe total cost of the project
$22MObjective of the project
Creation of a new productionBrief description and idea
Construction of equipment for drilling and pumping of ultra-deep oil and gas wellsInfrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$5,4MPlace of implementation
Tula OblastThe total cost of the project
$5,4MObjective of the project
Creation of a new productionBrief description and idea
Creation of a production complex for automotive components in the private and commercial vehicle segmentsInfrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$270,3MPlace of implementation
Tula OblastThe total cost of the project
$270,3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a rabbit farm located in the Ivnyansky district, Belgorod OblastInfrastructure support:
1. Power: available;Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$280КPlace of implementation
Belgorod OblastThe total cost of the project
$280КObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of frozen cooked potatoes and potato flakesImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$62MPlace of implementation
Bryansk OblastThe total cost of the project
$66MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of an ultra-modern greenhouse complex using the latest achievements of the world's crop production in the protected ground.Infrastructure support:
1. Power: connectivity available;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$25MPlace of implementation
Bryansk OblastThe total cost of the project
$25MObjective of the project
Creation of a new productionBrief description and idea
Production of pharmaceutical substancesInfrastructure support:
1. Power, MW: 8;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Tula OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Construction of a complex for advanced processing of wheat grain to produce gluten, bran, amino acids, lactic acid, fodder product, crystalline glucoseInfrastructure support:
1. Power: 15 MW;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$203MPlace of implementation
Voronezh OblastThe total cost of the project
$203MObjective of the project
Creation of a new productionBrief description and idea
Construction of the production of medical isotope TS99.Infrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$81MPlace of implementation
Tula OblastThe total cost of the project
$81MObjective of the project
Creation of a new productionBrief description and idea
When reinforcing prestressed products with K7 ropes, one of the key problems is the insufficient adhesion force of the rope to concrete. When transversely cutting the workpiece into products, rope slippage often occurs, which is manifested by the retraction of the reinforcement deep into the product. This phenomenon has a negative effect on the bearing capacity, so the product, depending on the scale of the problem, is transferred to lower strength groups or cut to smaller lengths for which the stored tension is sufficient, and in some cases even rejected. These problems are completely solved by using the TK10 rope as reinforcement on the BOF lines.Infrastructure support:
1. Power, MW: the estimated power of electrical receivers is 2.7 MW,Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Vladimir Oblast, KameshkovoThe total cost of the project
$29MObjective of the project
Creation of a new productionBrief description and idea
Production of building metal structures (MK) by hot-dip galvanizing of a wide range.Project implementation stage
ProposalThe need for additional funding
$25MPlace of implementation
Ryazan OblastThe total cost of the project
$25MObjective of the project
Creation of a new productionBrief description and idea
Creation of a high-tech foundry and mechanical plant for the production of parts from gray and high-strength cast iron for the automotive industry, railway transport engineering and other industries. At the first stage, it is planned to create a foundry, at the second - the construction of a workshop for the machining of castings and the introduction of a full production cycle.Infrastructure support:
1. Power, MW: 20;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$22MPlace of implementation
Lipetsk OblastThe total cost of the project
$22MObjective of the project
Creation of a new productionBrief description and idea
New tool production of ITO-Tulamash JSC.Infrastructure support:
1. Power, MW: 100;Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Tula OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant to produce a wide range of vegetables and berries using advanced "blast chilling" technologyInfrastructure support:
1. Power: 1,05 MW;Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$22MPlace of implementation
Voronezh OblastThe total cost of the project
$22MObjective of the project
Creation of a new productionBrief description and idea
Construction of a turkey breeding complexInfrastructure support:
1. Power: 3,09 MW;Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$11,4MPlace of implementation
Voronezh OblastThe total cost of the project
$11,4MObjective of the project
Creation of a new productionBrief description and idea
Creation of a full-cycle fruit, berry, vegetable, and mushroom processing plant in the Voronezh OblastInfrastructure support:
1. Power: 3 MW;Implementation period
-Project implementation stage
ProposalThe need for additional funding
$49,3MPlace of implementation
Voronezh OblastThe total cost of the project
$49,3MObjective of the project
Creation of a new productionBrief description and idea
Construction of a modular, full-cycle plant for the production of starches and starch productsInfrastructure support:
1. Power: 6 MW;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Voronezh OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Construction of a dairy complex in Voronezh Oblast - a loose housing farm for 1,000 dairy cows with a complete herd reproduction cycle, organisation of milk processing and fodder provisionInfrastructure support:
1. Power: 1,5 MW;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$17,6MPlace of implementation
Voronezh OblastThe total cost of the project
$17,6MObjective of the project
Creation of a new productionBrief description and idea
Creation of a modern and efficient agricultural facility for breeding livestock, milk, and meat productionInfrastructure support:
1. Power: 2 MW;Project implementation stage
ProposalThe need for additional funding
$67,6MPlace of implementation
Voronezh OblastThe total cost of the project
$67,6MObjective of the project
Creation of a new productionBrief description and idea
Construction of a fruit and vegetable storage facility with a capacity of 12,000 tonnesInfrastructure support:
1. Power: 5 MW;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Voronezh OblastThe total cost of the project
$15MObjective of the project
Creation of a new productionBrief description and idea
Considering the available resources and the similar projects being implemented in the region, to provide the population with domestically produced milk, it is necessary to create about four cattle-breeding complexes with a production capacity of 110,000 tonnes of milk per yearProject implementation stage
ProposalThe need for additional funding
$376MPlace of implementation
Ryazan OblastThe total cost of the project
$376MObjective of the project
Creation of a new productionBrief description and idea
The investment project aims to create and commercially operate a high-tech wheat advanced processing complex. The facility will produce the following products: dry wheat gluten, native starch, modified starches, maltodextrin, dry glucose syrup, caramel molasses, and wheat bran-based feedstuff.Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$209MPlace of implementation
Kursk OblastThe total cost of the project
$209MObjective of the project
Creation of a new productionBrief description and idea
Construction of a horticultural processing plantImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$7MPlace of implementation
Voronezh OblastThe total cost of the project
$7MObjective of the project
Creation of a new productionBrief description and idea
Construction of a large tilapia fish hatchery, fully replacing imported samples and providing marketable production capacityInfrastructure support:
1. Power: 8,38 MW;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$670КPlace of implementation
Voronezh OblastThe total cost of the project
$670КObjective of the project
Creation of a new productionBrief description and idea
Construction of a breeding and seed-breeding complex in the Voronezh OblastInfrastructure support:
1. Power: 2х6, 3 MW;Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$3,24MPlace of implementation
Voronezh OblastThe total cost of the project
$6MObjective of the project
Creation of a new productionBrief description and idea
Creation of super-intensive type gardensInfrastructure support:
1. Water: 150-200 m3/h.Project implementation stage
ProposalThe need for additional funding
$7,4MPlace of implementation
Voronezh OblastThe total cost of the project
$7,4MObjective of the project
Creation of a new productionBrief description and idea
Construction of a new production of components for the repair and modernization of metalworking machines.Infrastructure support:
1. Power, MW: 100;Project implementation stage
ProposalThe need for additional funding
$675KPlace of implementation
Tula OblastThe total cost of the project
$675KObjective of the project
Creation of a new productionBrief description and idea
Construction of an all-purpose feed mill with a granary with a capacity of 120,000 tonnes of grain storageInfrastructure support:
1. Power: 192 MW;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$13,5MPlace of implementation
Voronezh OblastThe total cost of the project
$13,5MObjective of the project
Creation of a new productionBrief description and idea
Construction of a sugar beet processing complex in the Voronezh Oblast with a processing capacity of 3,500 tonnes of sugar beet and 500 tonnes of raw sugar per dayInfrastructure support:
1. Power: 1,06 MW;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$7,4MPlace of implementation
Voronezh OblastThe total cost of the project
$46MObjective of the project
Creation of a new productionBrief description and idea
Construction of a soybean processing complex in the Voronezh OblastInfrastructure support:
1. Power: 6,6 MW;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Voronezh OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Construction of an indoor greenhouse complex in the Voronezh region, producing vegetables all year round and equipped with modern equipment with automated control systems, mineral nutrition, the newest low-volume hydroponic technology with extra lighting, climate control, and a meteorological stationInfrastructure support:
1. Power: MW: 12.14 MVA;Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$40,5MPlace of implementation
Voronezh OblastThe total cost of the project
$40,5MObjective of the project
Creation of a new productionBrief description and idea
Construction of a poultry plant for the production of chicken eggsInfrastructure support:
1. Power: 12,14 MW;Implementation period
3 yearsProject implementation stage
ProposalThe need for additional funding
$5,4MPlace of implementation
Voronezh OblastThe total cost of the project
$5,4MObjective of the project
Creation of a new productionBrief description and idea
Creation of a new grain advanced processing facility in order to create new production capacity and fulfill orders for large companies involved in the sale of these productsInfrastructure support:
1. Power: 10 MW;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$282MPlace of implementation
Tambov OblastThe total cost of the project
$282MObjective of the project
Creation of a new productionBrief description and idea
The project involves 4 types of products:Infrastructure support:
1. Power: MW: 10 kV: located on the land;Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Oryol OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Creation of a baby food production facilityInfrastructure support:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;Project implementation stage
ProposalThe need for additional funding
$65MPlace of implementation
Oryol OblastThe total cost of the project
$65MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.Infrastructure support:
1. Power, MW: 10;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$47MPlace of implementation
Ivanov OblastThe total cost of the project
$47mObjective of the project
Creation of a new productionBrief description and idea
The aim of the project is to start the production of fruit puree for children. All ingredients for production are purchased in the Oryol Oblast from farms and agricultural farms.Infrastructure support:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Oryol OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distilleryInfrastructure support:
1. Power: MW: 600 kW;Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Smolensk OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cowsInfrastructure support:
1. The railway line: available;Project implementation stage
ProposalThe need for additional funding
$2,3MPlace of implementation
Smolensk OblastThe total cost of the project
$2,3MObjective of the project
Creation of a new productionBrief description and idea
Investment attraction at the former broiler farm siteInfrastructure support:
1. Power: 3,8 MW;Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Smolensk OblastThe total cost of the project
$29MObjective of the project
Creation of a new productionBrief description and idea
The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per yearInfrastructure support:
1. Power: 36 MW;Implementation period
37 monthsProject implementation stage
ProposalThe need for additional funding
$84,3MPlace of implementation
Smolensk OblastThe total cost of the project
$84,3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a rabbit breeding complexInfrastructure support:
1. Power: 0.04 MW.Project implementation stage
ProposalThe need for additional funding
$17,56MPlace of implementation
Kursk OblastThe total cost of the project
$17,6MObjective of the project
Creation of a new productionBrief description and idea
Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.Infrastructure support:
1. Power: 26 MW;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$17MPlace of implementation
Smolensk OblastThe total cost of the project
$17MObjective of the project
Creation of a new productionBrief description and idea
Production of "Black Gold" organic fertilizers by processing biological waste from agricultural companies in the Belgorod Oblast. Two technologies are used in the production process.Implementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$240KPlace of implementation
Belgorod OblastThe total cost of the project
$240KObjective of the project
Creation of a new productionBrief description and idea
The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.Infrastructure support:
1. Power, MW: available:Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$8MPlace of implementation
Belgorod OblastThe total cost of the project
$8MObjective of the project
Creation of a new productionBrief description and idea
Construction of a lamb processing plant with modern processing and management technologies and a 1,000-head sheep breeding facilityInfrastructure support:
1. Power: 0,16 MW;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$20,3MPlace of implementation
Yaroslavl OblastThe total cost of the project
$20,3MObjective of the project
Creation of a new productionBrief description and idea
The project aims to create a mushroom farm for the production of cultivated champignons for sale in fresh and frozen form.Infrastructure support:
1. Power: MW: a new grid supply center is planned;Implementation period
21 monthsProject implementation stage
ProposalThe need for additional funding
$8MPlace of implementation
Yaroslavl OblastThe total cost of the project
$8MObjective of the project
Creation of a new productionBrief description and idea
Production of breadcrumbs, biscuits, and other dry bakery products, production of flour confectionery, cakes, pastries, pies, and biscuits intended for long-term storage.Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$63,5MPlace of implementation
Tver OblastThe total cost of the project
$63,5MObjective of the project
Creation of a new productionBrief description and idea
Investment project for the construction of a high-tech meat processing complex, a feed mill, and a livestock breeding complex, including its own five swine-breeding complexes, a breeding and genetic center for 2,500 sows, a feed mill for up to 150,000 tonnes per year, a drying complex, a separation plant, a grass meal facility, and a storage complex. Project implementation period: 36 months. The number of employment places is 790.Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$62,2MPlace of implementation
Tver OblastThe total cost of the project
$62,2MObjective of the project
Creation of a new productionBrief description and idea
High-tech greenhouse complex for growing greenhouse vegetables, with three phases of implementation.Infrastructure support:
1. The nearest federal highway: M-10 (1,5 km)Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$62,2MPlace of implementation
Tver OblastThe total cost of the project
$62,2MObjective of the project
Creation of a new productionBrief description and idea
"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.Infrastructure support:
1. The nearest federal highway: M-2 "Crimea Highway" (5,5 km)Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$7MPlace of implementation
Belgorod OblastThe total cost of the project
$7MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of microcircuits.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$25MPlace of implementation
Kaluga OblastThe total cost of the project
$25MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.Infrastructure support:
1. Power, MW: 10;Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Ivanov OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.Infrastructure support:
1. Power, MW: 10;Project implementation stage
ProposalThe need for additional funding
$24MPlace of implementation
Ivanov OblastThe total cost of the project
$24MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.Infrastructure support:
1. Power, MW: 0.37;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Vladimir Oblast, Kolchuginsky district, Kolchugino cityThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of a plant for the production of household appliances.Infrastructure support:
1. Power, MW: 0.25-14.98;Project implementation stage
ProposalThe need for additional funding
$21MPlace of implementation
Orlov OblastThe total cost of the project
$21MObjective of the project
Creation of a new productionBrief description and idea
Logistic controllers and switching equipment are designed to control technological processes. These products are used both in manufacturing (for example, equipment for an automation system designed to monitor and control process processors in the quality control line of tubing, casing and oil and gas pipes) and in household appliances (for example, a washing machine control module).Infrastructure support:
1. Power, MW: 0.25;Project implementation stage
ProposalThe need for additional funding
$54MPlace of implementation
Orlov OblastThe total cost of the project
$54MObjective of the project
Creation of a new productionBrief description and idea
Establishment of an enterprise for the production of electric drives.Infrastructure support:
1. Power, MW: 8;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Ivanov OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Creation of a production facility for the deep processing of horticultural, fruit, berry products and the creation of ready-made mealsInfrastructure support:
1. Power: up to 100 MW: eventually up to 150 MW;Project implementation stage
ProposalThe need for additional funding
$38MPlace of implementation
Tula OblastThe total cost of the project
$38MObjective of the project
Creation of a new productionBrief description and idea
The project entails the construction of a greenhouse complex for the production of vegetables and green crops, with a capacity of 5,400 tonnes of vegetables per year, and the application of growing technology with a drip irrigation system and automated microclimate control "Ultra Klima".Infrastructure support:
The territories for placement are identified by the region's declared investment projects in Rybnovsky, Pronsky, and Ryazansky districts and the "Lesnoy" Advanced Socio-Economic Development Territory.Project implementation stage
ProposalThe need for additional funding
$288MPlace of implementation
Ryazan OblastThe total cost of the project
$288MObjective of the project
Creation of a new productionBrief description and idea
The project aims to create a business from scratch. Foreseen costs are for the lease/purchase of land; construction of facilities for production and storage; transportation; purchase of equipment for lemonade and cider production and bottling; regular delivery of raw materials and containers; marketing strategy for market entry; advertising campaign; training and staff salaries.Infrastructure support:
1. Power: 0,25 MW;Project implementation stage
ProposalThe need for additional funding
$1,5MPlace of implementation
Oryol OblastThe total cost of the project
$1,5MObjective of the project
Creation of a new productionBrief description and idea
The aim is to create a versatile product line for the production of feed for all kinds of animals. An important point is the development of its unique formulation, for which a qualified specialist with experience in the field is hired.Infrastructure support:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;Project implementation stage
ProposalThe need for additional funding
$47,3MPlace of implementation
Oryol OblastThe total cost of the project
$47,3MObjective of the project
Creation of a new productionBrief description and idea
The aim of the project is to open a brewery in the Orel Oblast. Sales are planned in the oblast and neighboring oblasts.Infrastructure support:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;Project implementation stage
ProposalThe need for additional funding
$62,2MPlace of implementation
Oryol OblastThe total cost of the project
$62,2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of a complex for the production and selling of 7,000 ducks per year. The project includes the creation of a processing chain, including the purchase of ducklings, their raising, and further resale.Infrastructure support:
1. Power: 30 MW: substation is 1,2 km away;Project implementation stage
ProposalThe need for additional funding
$300KPlace of implementation
Oryol OblastThe total cost of the project
$300KObjective of the project
Creation of a new productionBrief description and idea
The implementation of an investment project involves expenses for:Infrastructure support:
1. Power: MW:10 kV, on the land;Project implementation stage
ProposalThe need for additional funding
$110KPlace of implementation
Oryol OblastThe total cost of the project
$110KObjective of the project
Creation of a new productionBrief description and idea
Construction of an industrial multi-span greenhouseInfrastructure support:
1. Power: MW:10 kV, on the land;Project implementation stage
ProposalThe need for additional funding
$34MPlace of implementation
Oryol OblastThe total cost of the project
$34MObjective of the project
Creation of a new productionBrief description and idea
Planting an intensive type apple orchard with drip irrigation system with an area of 45 ha, located in Ivnyansky District, Belgorod Region.Infrastructure support:
The construction of engineering and transport infrastructure, driveways, roads and logistics sites, electricity, gas and water supply system is plannedProject implementation stage
ProposalThe need for additional funding
$2,8MPlace of implementation
Belgorod OblastThe total cost of the project
$2,8MObjective of the project
Creation of a new productionBrief description and idea
Construction in the Voronezh region of a wholesale distribution center for agricultural products, designed to supply potatoes, onions, cabbage, carrots and table beets, storage, pre-sale preparation and delivery of products grown by local producers to retail chains and other trade organizations.Infrastructure support:
1. Power, MW: SS 110 kV "Bobrov" 20 km, power reserve 192 MVA;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$45MPlace of implementation
Voronezh OblastThe total cost of the project
$45MObjective of the project
Creation of a new productionBrief description and idea
An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.Infrastructure support:
1. Power, MW: 40;Implementation period
18 months (for one object)Project implementation stage
ProposalThe need for additional funding
$675MPlace of implementation
Moscow OblastThe total cost of the project
$675MObjective of the project
Creation of a new productionBrief description and idea
A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.Infrastructure support:
1. Power, 3 MW;Project implementation stage
ProposalThe need for additional funding
$68,5MPlace of implementation
Moscow OblastThe total cost of the project
$68,5MObjective of the project
Creation of a new productionBrief description and idea
Creation of an automobile filling station that provides the possibility of refueling vehicles with compressed natural gas, liquid motor fuel, liquefied hydrocarbon gas. The project is planned to be implemented as part of the program for the development of gas motor fuel in the Belgorod RegionImplementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$1,5MPlace of implementation
Belgorod OblastThe total cost of the project
$1,5MObjective of the project
Creation of a new productionBrief description and idea
Creation of an agro-industrial cluster combining vegetable and flower production in the area of protected ground production in Lukhovitsy districtInfrastructure support:
1. The nearest federal highway: M-5 "Ural"Project implementation stage
ProposalThe need for additional funding
$39,2MPlace of implementation
Moscow OblastThe total cost of the project
$39,2MObjective of the project
Creation of a new productionBrief description and idea
Creation of an Atlantic salmon farming plant in the Kashira urban districtImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$54MPlace of implementation
Moscow OblastThe total cost of the project
$54MObjective of the project
Creation of a new productionBrief description and idea
Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.Infrastructure support:
1. Power, MW: source 1 - SS-35/10kV "Kochetovka"; electricity was supplied according to a temporary scheme with a capacity of 630 kW, TU No. 5-199 / 20284964 of 12/19/2013;Project implementation stage
ProposalThe need for additional funding
$26MPlace of implementation
Belgorod OblastThe total cost of the project
$26MObjective of the project
Creation of a new productionBrief description and idea
Organization of industrial real estate objects in the Tula region (distribution center, fulfillment, temperature warehouse, temporary storage warehouse, etc.).Infrastructure support:
1. Power, MW: up to 100 MW (in the future, up to 150 MW);Project implementation stage
ProposalThe need for additional funding
$40MPlace of implementation
Tula OblastThe total cost of the project
$40MObjective of the project
Creation of a new productionBrief description and idea
Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.Implementation period
108 monthsProject implementation stage
ProposalThe need for additional funding
$1BPlace of implementation
Moscow OblastThe total cost of the project
$1BObjective of the project
Creation of a new productionBrief description and idea
The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$181MPlace of implementation
Moscow OblastThe total cost of the project
$181MObjective of the project
Creation of a new productionBrief description and idea
Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.Infrastructure support:
1. The presence of a railway lineImplementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$67MPlace of implementation
Moscow OblastThe total cost of the project
$67MObjective of the project
Creation of a new productionBrief description and idea
Design and construction of a production and warehouse complex in the Mozhaisk city district.Infrastructure support:
1. Power, MW: 3;Implementation period
14 months – 1st stage, 12 months. – 2nd stageProject implementation stage
ProposalThe need for additional funding
$47MPlace of implementation
Moscow OblastThe total cost of the project
$47MObjective of the project
Creation of a new productionBrief description and idea
At the moment, the implementation of two projects for the construction of cable cars has been approved. One of the projects is being implemented on a concession basis and involves the creation of a cable car between Skhodnenskaya and Rechnoy Vokzal stations at the expense of private investment.Project implementation stage
ProposalThe need for additional funding
$105MPlace of implementation
MoscowThe total cost of the project
$105MObjective of the project
Creation of a new productionBrief description and idea
Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.Infrastructure support:
1. Power, MW: 10 with a possible increase;Project implementation stage
ProposalThe need for additional funding
$40MPlace of implementation
Moscow OblastThe total cost of the project
$40MObjective of the project
Creation of a new productionBrief description and idea
Construction of a logistics center in the urban district of Serebryanye Prudy.Infrastructure support:
1. Power, MW: 5.53;Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction on the territory of the Lipetsk region of a specialized logistics complex for seed products and plant protection products with a total area of 8,000 square meters.Infrastructure support:
The project is being implemented on the territory of the Special Economic Zone of the industrial production type "Lipetsk" in the Yelets district. The construction of the required amount of space is planned to be carried out on a plot of 6 hectares, which guarantees the provision of all the required characteristics for a class "A" warehouse complex of the European standard.Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Lipetsk OblastThe total cost of the project
$114MObjective of the project
Creation of a new productionBrief description and idea
Construction of warehouses. This project involves the construction of warehouses for the storage of cement and finished products of other dry building mixtures. The project offers rooms that meet the requirements for humidity, temperature of storage of mixtures.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$1MPlace of implementation
Kaluga OblastThe total cost of the project
$1MObjective of the project
Creation of a new productionBrief description and idea
The area of most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.Project implementation stage
ProposalThe need for additional funding
$9BPlace of implementation
MoscowThe total cost of the project
$9BObjective of the project
Creation of a new productionBrief description and idea
Construction of a modern fruit storage facility for fruit storageInfrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Tula OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Organization of industrial real estate objects on the territory of the Tula region (distribution center, production and logistics complex, container hub).Infrastructure support:
1. Power, MW 12:Project implementation stage
ProposalThe need for additional funding
$40MPlace of implementation
Tula OblastThe total cost of the project
$40MObjective of the project
Creation of a new productionBrief description and idea
Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky districtInfrastructure support:
1. The nearest federal highway: A-107 (17 km), A-113 (17 km)Project implementation stage
ProposalThe need for additional funding
$61MPlace of implementation
Moscow OblastThe total cost of the project
$61MObjective of the project
Creation of a new productionBrief description and idea
Construction of a goat farm with 6,400 milking goats in Shchelkovo districtImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$13,5MPlace of implementation
Moscow OblastThe total cost of the project
$13,5MObjective of the project
Creation of a new productionBrief description and idea
Market launch of competitive, highly effective productsInfrastructure support:
1. Power: 0,15 MW;Project implementation stage
ProposalThe need for additional funding
$9MPlace of implementation
Moscow OblastThe total cost of the project
$9MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.Infrastructure support:
1. Power: MW: 380/220 W is needed;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$6,4MPlace of implementation
Moscow OblastThe total cost of the project
$6,4MObjective of the project
Creation of a new productionBrief description and idea
Construction of a robotised dairy farmInfrastructure support:
A milking module with free range will be used. A shelter with straw bedding will be built to house the animals. The calves will be housed in special barns.Implementation period
11 monthsProject implementation stage
ProposalThe need for additional funding
$2,5MPlace of implementation
Kaluga OblastThe total cost of the project
$2,5MObjective of the project
Creation of a new productionBrief description and idea
Construction of a cattle farmImplementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$400KPlace of implementation
Kaluga OblastThe total cost of the project
$400KObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of food products, a milk processing plantInfrastructure support:
1. Power: available;Implementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$1,3MPlace of implementation
Kaluga OblastThe total cost of the project
$1,3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$66,2MPlace of implementation
Moscow OblastThe total cost of the project
$66,2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of a working rabbit farm with 18 fattening and rearing houses with a capacity of 1,430 females.Infrastructure support:
1. Power: connection point at a distance of 100 m;Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$17MPlace of implementation
Bryansk OblastThe total cost of the project
$17MObjective of the project
Creation of a new productionBrief description and idea
Construction of a duck production complexInfrastructure support:
1. Power: 3,09MW;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$20,3MPlace of implementation
Voronezh OblastThe total cost of the project
$20,3MObjective of the project
Creation of a new productionBrief description and idea
Methanol productionInfrastructure support:
1. Gas, MW: 12.14 MVA;Project implementation stage
ProposalThe need for additional funding
$1BPlace of implementation
Voronezh OblastThe total cost of the project
$1BObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of plastic products.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
5 monthsProject implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Kaluga OblastThe total cost of the project
$10MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a polymer processing plant.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$6MPlace of implementation
Kaluga OblastThe total cost of the project
$6MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of woven packaging (raffia).Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
14 monthsProject implementation stage
ProposalThe need for additional funding
$1MPlace of implementation
Kaluga OblastThe total cost of the project
$1MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a polymer processing plant.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$20MPlace of implementation
Kaluga OblastThe total cost of the project
$20MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of polymer fibers.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of a plant for the production of BOPP membraine liner.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$16MPlace of implementation
Kaluga OblastThe total cost of the project
$16MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of polyethylene film.Infrastructure support:
1. Power, MW: provided in the required volumes;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Establishment of an enterprise for the production of synthetic resins.Infrastructure support:
1. Power, MW: 20;Implementation period
7 yearsProject implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Ivanov OblastThe total cost of the project
$10MObjective of the project
Creation of a new productionBrief description and idea
The company is focused on the production and sale of the following main products:Infrastructure support:
1. Power: MW; agreed supply, capacity to be determined by the project;Project implementation stage
ProposalThe need for additional funding
$49MPlace of implementation
Yaroslavl OblastThe total cost of the project
$49MObjective of the project
Creation of a new productionBrief description and idea
Investment project for the construction of three dairy complexes (farms) with a total herd size of up to 10,000 cows, as well as a milk processing plantImplementation period
40 monthsProject implementation stage
ProposalThe need for additional funding
$162,2MPlace of implementation
Tver OblastThe total cost of the project
$162,2MObjective of the project
Creation of a new productionBrief description and idea
Construction of a dairy farmInfrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Tula OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Project for the construction of a plant for the deep processing of coarse grains to produce amino acids and other functional additives for the agricultural and food industriesInfrastructure support:
1. Power: 9 MW;Project implementation stage
ProposalThe need for additional funding
$39,2MPlace of implementation
Tula OblastThe total cost of the project
$39,2MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of acetic acid by fermentation and chemical processing of products from destructive distillation of woodInfrastructure support:
1. Power: 60 MW;Project implementation stage
ProposalThe need for additional funding
$40,5MPlace of implementation
Tula OblastThe total cost of the project
$40,5MObjective of the project
Creation of a new productionBrief description and idea
The investment project aims to increase the production of livestock products (milk and meat) through the construction of closed-type farms with year-round stabling of cattle.Infrastructure support:
1. Power: 9 MW;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Tula OblastThe total cost of the project
$7MObjective of the project
Creation of a new productionBrief description and idea
Construction of an extraction complex for processing soybean and rapeseedInfrastructure support:
1. Power: 14 MW;Project implementation stage
ProposalThe need for additional funding
$54MPlace of implementation
Tula OblastThe total cost of the project
$54MObjective of the project
Creation of a new productionBrief description and idea
Evaporated salt production project with a capacity of 150,000 tonnes per yearInfrastructure support:
1. Power: 12 MW;Project implementation stage
ProposalThe need for additional funding
$19MPlace of implementation
Tula OblastThe total cost of the project
$19MObjective of the project
Creation of a new productionBrief description and idea
The project is aimed at building a modern linear elevator with a storage capacity of 100,000 tonnes, including grain cleaning and drying equipment. The maximum investment amount is $4.05 million. The project is expected to create 45 employment placements.Infrastructure support:
1. Power: 10 MW;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Tula OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
Construction of a sugar beet processing complexInfrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$11MPlace of implementation
Tula OblastThe total cost of the project
$11MObjective of the project
Creation of a new productionBrief description and idea
Construction of a horticultural processing complex.Infrastructure support:
1. Power: 2 MW;Project implementation stage
ProposalThe need for additional funding
$55,4MPlace of implementation
Tula OblastThe total cost of the project
$55,4MObjective of the project
Creation of a new productionBrief description and idea
An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilitiesInfrastructure support:
1. Power: 32,93 MW required;Project implementation stage
ProposalThe need for additional funding
$676MPlace of implementation
Moscow OblastThe total cost of the project
$676MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the manufactoring of products based on surfactants is being created. The main products are detergents and cleaning products, laundry and toilet soap, personal hygiene products.Infrastructure support:
1. Power: 20 MW;Implementation period
16 monthsProject implementation stage
ProposalThe need for additional funding
$6MPlace of implementation
Ivanov OblastThe total cost of the project
$6MObjective of the project
Creation of a new productionBrief description and idea
The production of urea (urea) is a chemical compound, carbonic acid diamide. White crystals, soluble in polar solvents (water, ethanol, liquid ammonia).Infrastructure support:
1. Power: 60 MW;Project implementation stage
ProposalThe need for additional funding
$270MPlace of implementation
Tula OblastThe total cost of the project
$270MObjective of the project
Creation of a new productionBrief description and idea
Creation of small-tonnage chemical production of components for high-tech polymer composite materials. Production of phthalonitriles. Binders based on phthalonitrile resins.Infrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Tula OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Plant for the production of plastics using natural or synthetic polymers.Infrastructure support:
1. Power: 50 MW;Project implementation stage
ProposalThe need for additional funding
$20MPlace of implementation
Tula OblastThe total cost of the project
$20MObjective of the project
Creation of a new productionBrief description and idea
Production of monoethylene glycol MEG-300Infrastructure support:
1. Power: 30 MW;Project implementation stage
ProposalThe need for additional funding
$381MPlace of implementation
Tula OblastThe total cost of the project
$381MObjective of the project
Creation of a new productionBrief description and idea
Construction of a theme park on a 17,000 sq m land area. Estimated number of visits - 200 people/day.Infrastructure support:
The area of the water park is 3000-5000 sq mImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$12MPlace of implementation
Kaluga OblastThe total cost of the project
$12MObjective of the project
Creation of a new productionBrief description and idea
Creation of a modern multifunctional entertainment and business center on the basis of the buildings of the frozen Voronezh Heat Supply Nuclear Power Plant.Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Voronezh OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Construction of a methanol plantInfrastructure support:
1. Power: 60 MW;Project implementation stage
ProposalThe need for additional funding
$252MPlace of implementation
Tula OblastThe total cost of the project
$252MObjective of the project
Creation of a new productionBrief description and idea
The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure.Infrastructure support:
1. The nearest federal highway: M-4 "Don Highway", A-105, A-107, M-2Project implementation stage
ProposalThe need for additional funding
$5,1BPlace of implementation
Moscow OblastThe total cost of the project
$5,1BObjective of the project
Creation of a new productionBrief description and idea
The implementation of the water health-resort SPA complex project will increase the load on the existing facilities of the hospitality industry; new sites of tourist interest will be created, localized in one area in proximity to the urban agglomeration, the international airport, and the M-4 "Don" highway.Project implementation stage
ProposalThe need for additional funding
$135MPlace of implementation
Voronezh OblastThe total cost of the project
$135MObjective of the project
7,2 yearsBrief description and idea
The creation of a multifunctional five-star hotel complex.Project implementation stage
ProposalThe need for additional funding
$20,3MPlace of implementation
Tula OblastThe total cost of the project
$20,3MObjective of the project
Creation of a new productionBrief description and idea
BIOPARK YAROSLAVL is a new stage in the development of the Yaroslavl Zoo. The project aims to create Russia's largest biopark.Infrastructure support:
1. Power: 0,53 MW;Implementation period
96 monthsProject implementation stage
ProposalThe need for additional funding
$170,2MPlace of implementation
Yaroslavl OblastThe total cost of the project
$170,2MObjective of the project
Creation of a new productionBrief description and idea
The "Adventure Hotel" project concept is to create a hotel in the building of a prison castle using best global practices. Guests of the hotel will be both Russian and foreign tourists.Infrastructure support:
1. Power: 380 MW;Project implementation stage
ProposalThe need for additional funding
$1,2MPlace of implementation
Yaroslavl oblastThe total cost of the project
$1,2MObjective of the project
Creation of a new productionBrief description and idea
Comprehensive development of the area This includes the development of infrastructure, landscaping of the area, demolition of dissonant objects, restoration of architectural heritage, the construction of new residential neighborhoods, the creation of a technopark, a craft, and cultural center, and a modern gastronomic center.Infrastructure support:
1. Power: MW, 5000 kW/h;Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$101,3MPlace of implementation
Yaroslavl oblastThe total cost of the project
$101,3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".Infrastructure support:
1. Power: MW, at the border;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$92MPlace of implementation
Moscow OblastThe total cost of the project
$11MObjective of the project
Creation of a new productionBrief description and idea
The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.Infrastructure support:
1. Power: MW; 10 kV own independent transmission line, provides full power supply to the resort;Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Moscow OblastThe total cost of the project
$5MBrief description and idea
Restoration of a cultural heritage site with adaptation to the chosen function of the site.Infrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:Implementation period
27 monthsProject implementation stage
ProposalThe need for additional funding
$16,4MPlace of implementation
Moscow Oblast, Chekhov district, Meshcherskoye areaThe total cost of the project
$16,4MObjective of the project
Creation of a new productionBrief description and idea
The purpose of the project is the reconstruction of the manor into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region and the proximity of the Moscow Oblast, the expected number of visitors is at least 20,000 people per year.Infrastructure support:
1. Power: available;Implementation period
33 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Renovation of the manorImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Establishment of the production of high-pressure composite cylinders.Infrastructure support:
1. Power, MW: 100,Project implementation stage
ProposalThe need for additional funding
$41MPlace of implementation
Tula OblastThe total cost of the project
$41MObjective of the project
Creation of a new productionBrief description and idea
Construction of a complex for the production of nitric acid with a capacity of 270 thousand tons per year and ammonium nitrate with a capacity of 340 thousand tons per year.Infrastructure support:
1. Power, MW: 20,Project implementation stage
ProposalThe need for additional funding
$93MPlace of implementation
Tula OblastThe total cost of the project
$93MObjective of the project
Creation of a new productionBrief description and idea
Construction of an ammonia production complex with a capacity of 525 thousand tons per year and carbamide with an output of 700 thousand tons per year.Infrastructure support:
1. Power, MW: 15,Project implementation stage
ProposalThe need for additional funding
$551MPlace of implementation
Tula OblastThe total cost of the project
$551MObjective of the project
Creation of a new productionBrief description and idea
Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms. The concept of the project aims to preserve the area and, at the same time, create a comfortable setting for outdoor recreation at all times of the year.Infrastructure support:
1. Power: 9 MW;Project implementation stage
ProposalThe need for additional funding
$13,5MPlace of implementation
Tula OblastThe total cost of the project
$23MObjective of the project
Creation of a new productionBrief description and idea
The complex of ammonia and carbamide AMKAR-1400, manufacturing productivity estimates 3000 tons of ammonia and 4200 tons of carbamide per day. The project is directed at increasing the export capacity of Tula Oblast, production release with higher added value cost.Infrastructure support:
1. Power, MW: 25;Project implementation stage
ProposalThe need for additional funding
$847MPlace of implementation
Tula OblastThe total cost of the project
$847MObjective of the project
Creation of a new productionBrief description and idea
Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms.Infrastructure support:
1. Power: 6 MW;Project implementation stage
ProposalThe need for additional funding
$5,4MPlace of implementation
Tula OblastThe total cost of the project
$12,1MObjective of the project
Creation of a new productionBrief description and idea
The reconstruction of the health resort complex Sanatorium "Krainka" involves the modernisation of infrastructure, improvement of accommodation facilities, improvement of the adjoining territory, and an increase of the number of available accommodation places.Infrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$13,5MPlace of implementation
Tula OblastThe total cost of the project
$13,5MObjective of the project
Creation of a new productionBrief description and idea
Construction of a 150-bed 2 or 3-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".Infrastructure support:
1. Power: 3 MW;Project implementation stage
ProposalThe need for additional funding
$8,1MPlace of implementation
Tula OblastThe total cost of the project
$8,1MObjective of the project
Creation of a new productionBrief description and idea
Construction of a 750-bed 5-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".Infrastructure support:
1. Power: 6 MW;Project implementation stage
ProposalThe need for additional funding
$40,5MPlace of implementation
Tula OblastThe total cost of the project
$40,5MObjective of the project
Creation of a new productionBrief description and idea
Creation of infrastructure for food, accommodation and active recreation with a year-round stay.Infrastructure support:
1. The nearest federal highway: M-3, 7 km.Implementation period
16 monthsProject implementation stage
ProposalThe need for additional funding
$1,3MPlace of implementation
Kaluga OblastThe total cost of the project
$1,3MObjective of the project
Creation of a new productionBrief description and idea
The purpose of the project is to organize activities in the field of growing planting material (miscanthus) and the production of ecological disposable tableware.Infrastructure support:
1. Power: 12 MW;Implementation period
21 monthsProject implementation stage
ProposalThe need for additional funding
$30MPlace of implementation
Yaroslavl OblastThe total cost of the project
$30MObjective of the project
Creation of a new productionBrief description and idea
The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.Infrastructure support:
1. Water: 10401 m3/h;Project implementation stage
ProposalThe need for additional funding
$149MPlace of implementation
Moscow OblastThe total cost of the project
$149MObjective of the project
Creation of a new productionBrief description and idea
The purpose of the project is the reconstruction of the mansion into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region, the expected number of visitors is at least 10,000 people per year.Infrastructure support:
1. Power: available;Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$1,3MPlace of implementation
Kaluga OblastThe total cost of the project
$1,3MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the production of geotextiles.Infrastructure support:
1. Power: 8 MW;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$32MPlace of implementation
Ivanovo OblastThe total cost of the project
$32MObjective of the project
Creation of a new productionBrief description and idea
Construction of a factory for the production of sanitary ware products from raw materials extracted in the Ulyanovsk region. The main products are sanitary ware made of ceramic masses.Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$30MPlace of implementation
Kaluga OblastThe total cost of the project
$30MObjective of the project
Creation of a new productionBrief description and idea
The main purpose of the project is the modern production of pharmaceutical substances. The company should ensure uninterrupted production of a wide range of high-quality pharmaceutical products to meet the needs of all groups of the region's population in medicines at affordable prices, reduce Russia's dependence on imports of medicines and raw materials for their production.Project implementation stage
ProposalThe need for additional funding
$11MPlace of implementation
Belgorod OblastThe total cost of the project
$11MObjective of the project
Creation of a new productionBrief description and idea
Construction of a factory for the production of finished dosage forms. The number of jobs created is 225.Infrastructure support:
1. Power: on request;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$38MPlace of implementation
Kaluga OblastThe total cost of the project
$38MObjective of the project
Creation of a new productionBrief description and idea
Creation of an enterprise for the mini excavator's production.Infrastructure support:
1. Power: 10 MW;Implementation period
4 monthsProject implementation stage
ProposalThe need for additional funding
$1,6MPlace of implementation
Ivanovo OblastThe total cost of the project
$1,6MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a factory for the production of automotive components for Volkswagen, Skoda, Volvo, Renault, Mitsubishi car brands.Infrastructure support:
1. Power: on request;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$18MPlace of implementation
Kaluga OblastThe total cost of the project
$18MObjective of the project
Creation of a new productionBrief description and idea
Creation and development of a modern timber industry enterprise - a woodworking factory. The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging transport.Project implementation stage
ProposalThe need for additional funding
$9,4MPlace of implementation
Tver OblastThe total cost of the project
$9,4MObjective of the project
Creation of a new productionBrief description and idea
Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.Infrastructure support:
1. Power: 250 MW and 4,934 MW;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$33MPlace of implementation
Kostroma OblastThe total cost of the project
$33MObjective of the project
Creation of a new productionBrief description and idea
The main goal of the project is to create a new production facility equipped with modern, energy-efficient devices to make a profit through the sale of manufactured products: steel grinding balls with a diameter of 30-100 mm.Infrastructure support:
1. Power: 13 MW;Implementation period
16 monthsProject implementation stage
ProposalThe need for additional funding
$14MPlace of implementation
Vladimir OblastThe total cost of the project
$14MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of cast iron and steel: plumbing casting (plumbing and accessories), accessories for anchor-rail fastening, artistic casting.Infrastructure support:
1. Power: on request;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$432MPlace of implementation
Kaluga OblastThe total cost of the project
$432MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of radio and mobile communications.Infrastructure support:
1. Power: on request;Project implementation stage
ProposalThe need for additional funding
$76MPlace of implementation
Kaluga OblastThe total cost of the project
$76MObjective of the project
Creation of a new productionBrief description and idea
Creation of an enterprise for the production of goods from "Mineral casting" and UHPC concrete, for the machine-tool and machine-building industries, as an analog to metal and cast-iron products.Infrastructure support:
1. Power: 17,46 MW max;Implementation period
17 monthsProject implementation stage
ProposalThe need for additional funding
$2,1MPlace of implementation
Belgorod OblastThe total cost of the project
$2,1MObjective of the project
Creation of a new productionBrief description and idea
Creation of an enterprise for the organization of production and processing of dense rocks into crushed stone for road, housing, industrial and civil construction.Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$1,2MPlace of implementation
Tambov OblastThe total cost of the project
$1,2MObjective of the project
Creation of a new productionBrief description and idea
Creation of a modern meliorative system on an area of 220 hectares in order to reduce risks in the production of open-ground vegetable products: in conditions of lacking the moisture during the growing season of vegetable products - the device of circular irrigation machines and drip irrigation; the device of a drainage system on waterlogged areas of floodplain land (lagoons, canals).Implementation period
10 monthsProject implementation stage
ProposalThe need for additional funding
$2,6MPlace of implementation
Belgorod OblastThe total cost of the project
$2,6MObjective of the project
Creation of a new productionBrief description and idea
Construction of a production complex for 1000 heads in Voronezh Oblast.Infrastructure support:
1. Power: 5,01 MW;Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$12MPlace of implementation
Voronezh OblastThe total cost of the project
$12MObjective of the project
Creation of a new productionBrief description and idea
The project is aimed at the production of sodium polyacrylate (sodium salt) for hygiene products.Infrastructure support:
1. Power: depending on the site;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$31MPlace of implementation
Yaroslavl OblastThe total cost of the project
$31MObjective of the project
Creation of a new productionBrief description and idea
The project is aimed at the construction of a thermoforming plant for products.Infrastructure support:
1. Power: on request;Implementation period
11 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MFeedback
You can send us a request by email using the following form