IRR:
Investments:
Reset filters

About branch

Projects 0

Currently there are no projects with these parameters.Please try another.

Проектов нет

Construction of a wind farm with a wind turbine (ID 4.4)

NPV
IRR
РВР
- - 3,5 years

Objective of the project

Creation of a new production

Brief description and idea

Development and modernization of power supply systems.

Project implementation stage

Proposal

The need for additional funding

$31M

Place of implementation

Voronezh Oblast

The total cost of the project

$31M

Construction of MSW landfills and waste sorting complexes (ID 4.28)

NPV
IRR
РВР
- - 42 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of 9 waste management facilities: MSW landfills and waste sorting complexes in the Voronezh region.

Infrastructure support:

1. Electricity: 6,49 MW;
2. The presence of a railway line: the station "Davydovka", 2 km;
3. Nearest federal highway: M-4 Don Federal Highway, 11 km away.

Project implementation stage

Proposal

The need for additional funding

$2,8M

Place of implementation

Voronezh Oblast

The total cost of the project

$2,8M

Concession of heat and power facilities (ID 4.30)

NPV
IRR
РВР
- - 3 years

Objective of the project

Creation of a new production

Brief description and idea

Concession transfer of heat and power facilities (22 municipal boiler houses).

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Voronezh Oblast

The total cost of the project

$27M

Construction of a plant for the processing of municipal solid waste (ID 4.31)

NPV
IRR
РВР
- - 3 years

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the processing of municipal solid waste using promising methods of recycling waste as material and energy resources.

Infrastructure support:

1. Power: 8,38 MW;
2. Water: 7596 m3/h;
3. Sewage: 460 m3/h;
4. Gas: available.

Project implementation stage

Proposal

The need for additional funding

$52M

Place of implementation

Voronezh Oblast

The total cost of the project

$52M

Construction of a waste transfer station (ID 1.1)

NPV
IRR
РВР
$0,13M 3% 109 months

Objective of the project

Creation of a new production

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$1,9M

Place of implementation

Belgorod Oblast

The total cost of the project

$1,9M

Construction of a waste transfer station (ID 1.2)

NPV
IRR
РВР
$0,13M 3% 109 months

Objective of the project

Creation of a new production

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$1.9M

Place of implementation

Belgorod Oblast

The total cost of the project

$1.9M

Biodegradable tableware production (ID 1.10)

NPV
IRR
РВР
$4M 15% 156 months

Objective of the project

Creation of a new production

Brief description and idea

Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.

Infrastructure support:

1. Power: available;
2. Water: available;
3. Gas: available;
4. The nearest federal highway: the federal highway Belgorod-Grayvoron-border of Ukraine.

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Belgorod Oblast

The total cost of the project

$3M

Construction of a research and production technology center for public access (ID 18.5)

NPV
IRR
РВР
$127M 19,71% 87 months

Objective of the project

Creation of a new production

Brief description and idea

Industrial Technologies Park JSC (Park INTECH JSC) is implementing an investment project for the construction of a public research and production technology center in the Yaroslavl region with the involvement of foreign capital - a Technopark to improve hydrocarbon processing processes and create environmentally friendly hydrocarbon and alternative motor fuels.

The structure of the Technopark includes a combined production line (KTL) with main production facilities and off-site facilities, with a capacity of 1 million tons for oil refining per year and a Test Base (IB) to carry out the final stage of research and design work to fine-tune pilot industrial installations of innovative technologies for deep processing of hydrocarbons (oil).

KTL as part of the Technopark performs two main functions:
1. Ensures the functioning of the Test Base. Raw materials, electricity, water, steam are supplied from KTL to IB, hydrogen sulfide and substandard products obtained at IB are utilized. KTL provides information security with its industrial wastewater treatment facilities, fire safety system, etc.
2. Processes oil and produces high-quality products for sale and profit.

Infrastructure support:

1. Power: available;
2. Water: available;
3. Sewage: available;
4. Gas: available;
5. The railway line: available;
6. The nearest federal highway: M-8 Kholmogory motorway Moscow - Yaroslavl - Arkhangelsk, 3.5 km.

Project implementation stage

Proposal

The need for additional funding

$729M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$729M

Creation of an integrated technology for the processing of gypsum-containing waste (ID 1.12)

NPV
IRR
РВР
$304 thousand 11,45% 84 months

Infrastructure support:

As part of the project, it is planned to create a scientific reserve and develop a set of technological approaches to ensure the possibility of cost-effective processing of any type of gypsum-containing waste (GSO):
- development of methods for cleaning GSO from harmful impurities in the general technological cycle;
- creation of technological foundations for energy-efficient processing of GSO.
The planned date for reaching the design capacity is 2024.

Project implementation stage

Proposal

The need for additional funding

$18M

Place of implementation

Belgorod Oblast

The total cost of the project

$18M

LED production (ID 12.16)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of the production of LED products as part of the development of the Russian Federation's program for a gradual transition to energy-saving technologies and the abandonment of traditional light sources.

Infrastructure support:

1. Power: 0,25-14,98 MW;
2. Water: available;
3. Sewage: available;
4. Gas: 500 m3/h;
5. Availability of a railway line: 5 km from the railway station;
6. The nearest federal highway: M2, E105, 10 km.

Project implementation stage

Proposal

The need for additional funding

$36M

Place of implementation

Orlov Oblast

The total cost of the project

$36M

Implementation of the housing renovation program (ID 10.6)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project is aimed at creating favorable living conditions for citizens, promoting the renewal of their living environment and the development of public space, as well as preventing the growth of emergency housing stock in the city of Moscow.

The draft renovation program includes dilapidated five-story buildings, the owners / residents of which, instead of old apartments, will be provided with equivalent and renovated apartments in new, modern buildings within the boundaries of their area. As part of the renovation program, social infrastructure facilities will also be built: schools, kindergartens, clinics and leisure places, and attention will be paid to the development of the transport network.

The project implementation period is 2017-2042.

Project implementation stage

Proposal

The need for additional funding

$81B

Place of implementation

Moscow

The total cost of the project

$81B

Complex development of territories (ID 10.2)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.

Project implementation stage

Proposal

The need for additional funding

$1B

Place of implementation

Moscow

The total cost of the project

$1B

Construction of a sports and recreation complex (ID 11.25)

NPV
IRR
РВР
$20M 36 months

Objective of the project

Creation of a new production

Brief description and idea

The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8000 m2, with an emphasis on self-service, low prices and high throughput.

Infrastructure support:

1. Power: 0,4 and 1 MW;
2. Water: 2,71 m3/h (cold water); 3 m3/h;
4. Gas: 357 m3/h;
5. The nearest federal highway: "Ural" M-5, about 15 km from the sports complex.

Implementation period

Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)

Project implementation stage

Proposal

The need for additional funding

$1,7M

Place of implementation

Moscow Oblast

The total cost of the project

$3M

Construction of the convention and exhibition center (ID 4.10)

NPV
IRR
РВР
3,5 years

Objective of the project

Creation of a new production

Brief description and idea

The construction of a modern congress and exhibition center in Voronezh will create a platform for major events at the regional, interregional and federal levels.

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Voronezh Oblast

The total cost of the project

$27M

Reconstruction of a shopping facility (ID 11.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.

Infrastructure support:

1. Power, MW: there is a substation for 800 kW on the territory of the plant;
2. Water, m3/hour: available;
3. Sewage, m3/hour: available;
4. Gas, m3/hour: not required;
5. The nearest federal highway: A-108 (50m), M-5 Ural (8km).

The need for additional funding

$20M

Place of implementation

Moscow Oblast

The total cost of the project

$28M

Organization of production of heating elements (ID 12.17)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

It is planned to create production lines, including the following stages of production:
- Oxide;
- Recovery;
- Manufacture of alloys;
- Pressing;
- Sintering;
- Forming;
- Heat treatment;
- Mechanical restoration.

Infrastructure support:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$13M

Place of implementation

Orlov Oblast

The total cost of the project

$13M

Organization of production of electric stoves (ID 12.20)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project envisages the production of electric stoves with several hermetic levels, using energy-saving technology, as well as the possible production of built-in ovens and built-in hobs.

Infrastructure support:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3.Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$47M

Place of implementation

Orlov Oblast

The total cost of the project

$47M

Construction of an international medical cluster (ID 10.3)

NPV
IRR
РВР
-

Objective of the project

Creation of a new production

Brief description and idea

The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.

The project is being implemented on the principles of PPP, and the leading medical centers of the OECD countries will be involved in the management of MMK facilities.

Infrastructure support:

The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.

Project implementation stage

Proposal

The need for additional funding

$486M

Place of implementation

Moscow

The total cost of the project

$486M

Creation of places of application of labor (ID 10.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.

The mechanism for granting benefits (exemption from payment for changing the type of permitted use (VRI) of a land plot) is extended to the creation of not only objects of administrative and business or industrial and production purposes, but also objects of education, science, health and social security, sports, culture, trade , shopping and entertainment facilities, public catering, as well as multifunctional facilities, including all of the above types.

Project implementation stage

Proposal

The need for additional funding

$105M

Place of implementation

Moscow

The total cost of the project

$105M

Creation of a children’s technopark (ID 11.28)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.

Infrastructure support:

1. Power, MW: 0.4;
2. Water, m3/hour: 1DN=100mm from the water supply networks of our own water intake unit with the possibility of purchasing additional the volume of drinking water at MUE "Vodokanal-Service";
3. Availability of a railway line: yes;
4. The nearest federal highway: M-2 "Crimea" (2 km).

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Moscow Oblast

The total cost of the project

$10M

Creation of a multifunctional sports complex (ID 11.32)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.

Infrastructure support:

1. The nearest federal highway: M-7 Volga - 11 km, MKAD - 15 km.

The need for additional funding

$4M

The total cost of the project

$4M

Construction of an enterprise for the extraction of granite and the production of non-metallic materials (ID 4.7)

NPV
IRR
РВР
$633M 25,48% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of an enterprise for the extraction of granite and the production of non-metallic materials.
The crushed stone plant is represented by three parallel technological lines with common warehouses for finished products.
The crushed stone plant will produce crushed stone of fractions 40-70, 20-40 and 5-20 mm with the possibility of changing the size of crushed stone fractions, focusing on demand.

Infrastructure support:

1. Power, MW: 5.01;
2. Water, m3/hour: 1000;
3. The nearest federal highway: The distance to the nearest federal road M-4 "Don" is 4 km.

Implementation period

30 months

The need for additional funding

$120M

Place of implementation

Voronezh Oblast

The total cost of the project

$120M

Organization of production of ceramic refractory products (ID 12.1)

NPV
IRR
РВР
- - -

Brief description and idea

It is planned to create the production of ceramic refractory products of several types.
The main stages of production of ceramic refractory products:
- extraction and transportation of raw materials;
- preparation and storage of raw materials;
- molding;
- drying;
- roasting;
- control;
- packing and shipment.

Infrastructure support:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/h: 36 m3/h - design capacity, 24 m3/h - free capacity;
3. Sewage, m3/h: 75 m3/h - design capacity, 69 m3/h - free capacity;
4. Gas, m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - free capacity;
5. The nearest federal highway: about 2 km to the M2 "Krym" highway.

Project implementation stage

Proposal

The need for additional funding

$13M

Place of implementation

Orlov Oblast

The total cost of the project

$13M

Organization of production of ceramic sanitary ware (ID 12.6)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

"It is planned to create the production of ceramic sanitary ware. The production line consists of:
- kilns for roasting,
- molds for the product,
- foundry conveyor."

Infrastructure support:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sevage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: about 2 km to the M-2 "Krym" highway.

Project implementation stage

Proposal

The need for additional funding

$60M

Place of implementation

Orlov Oblast

The total cost of the project

$60M

Manufacture of binder asphalt mix for soil stabilization and road foundation construction (ID 1.13)

NPV
IRR
РВР
$714 thousand 44,39% 42 months

Objective of the project

Creation of a new production

Brief description and idea

Establishment of an enterprise for the production of ShMAS (Crushed Stone-Mastic Asphalt Concrete Mix) by mixing waste paper and bitumen. The main purpose of the application is to increase the bituminous film, which helps to protect the asphalt from delamination.

The planned commissioning date is 2022.

Requirements for the project site: rent of non-residential premises for an office, with a total area of ​​17.7 sq. m. at the address: Belgorod region, Gubkin, st. Gastello, 16, office 8; lease with subsequent purchase of a non-residential building with a total area of ​​1368.42 sq.m., with a land plot with a total area of ​​4399 sq.m. m., at the address: Belgorod region, Gubkin, industrial area.

The industrial site has all the necessary infrastructure and engineering communications for the implementation of production activities: the need for water is 20m3/day (1.7 m3/hour); demand for network gas - 4300 m3/day (358 m3/hour); electricity demand: maximum design power - 7200 kW (30 Gcal) / day (295 kW (2 Gcal) / hour).

The project involves the purchase of technological equipment: a granulation line, a line for the production of additives ShchMAS, a shredder for shredding waste.

ShchMAS (Crushed Stone-Mastic Asphalt Concrete Mix) was used for the construction of such a roadbed as the M-2 "Crimea" highway Moscow - Tula - Orel - Kursk - Belgorod - the border with Ukraine in the Belgorod region.

Implementation period

10 months

The need for additional funding

$702 thousand

Place of implementation

Belgorod Oblast

The total cost of the project

$702 thousand

Organization of production of ceramic bricks (ID 1.15)

NPV
IRR
РВР
$202 thousand 16,33% 171 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an enterprise for the production of ordinary ceramic bricks using plastic molding technology. This technology can be used to produce both hollow and solid bricks. At the same time, the brick is stronger and more durable than with semi-dry molding.

Ceramic bricks will be produced according to the current standard for ceramic bricks and stone GOST 500-2007, which came into effect on March 1, 2008, instead of GOST 530-95 and GOST 7484-78.

The planned commissioning date is 2023.

Requirements for the project site: a land plot with an area of ​​at least 2000 sq. m for the purpose of erecting an industrial building with an area of ​​2,016 sq. m.

As part of the project, it is planned to use the investment site "St. Boiler, pl. Dorozhnaya, No. 305" with a total area of ​​65 hectares with further allocation of a separate land plot for the ongoing project.

The industrial site has all the necessary engineering infrastructure: electricity, gas, access roads and railways. The distance from the industrial site to the highway R-188 "Stary Oskol-Chernyanka-Novy Oskol" is 0.1 km, to the station "Kotel" (Russian Railways) - 0.1-0.3 km.

The main consumers of the manufactured products are large and small enterprises of the Belgorod region and other regions of Russia, engaged in the construction industry.

Project implementation stage

Proposal

The need for additional funding

$20M

Place of implementation

Belgorod Oblast

The total cost of the project

$20M

Construction of a mining and processing plant with associated production (ID 18.8)

NPV
IRR
РВР
$24M 27% 5 months

Objective of the project

Creation of a new production

Brief description and idea

1. Power, MW: to be specified;
2. Water, m3/h: to be specified;
3. Sewage, m3/hour: to be specified;
4. Gas, m3/h: to be specified;
5. The nearest federal highway: M-8 (60 km).

Infrastructure support:

1. Power, MW: to be specified;
2. Water, m3/h: to be specified;
3. Sewage, m3/hour: to be specified;
4. Gas, m3/h: to be specified;
5. The nearest federal highway: M-8 (60 km).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$33M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$33M

Import-substituting production of colored iron oxide pigments and potassium sulfate fertilizers (ID 18.7)

NPV
IRR
РВР
$13M 37% 51 months

Objective of the project

Creation of a new production

Brief description and idea

Organization of the production of high-quality pigment necessary for coloring such materials as brick, roofing tiles, paving slabs, rubber and paint products, polymers, fabrics and paper.

The purpose of the project: Providing high-quality iron oxide pigments not produced in Russia, and potassium sulfate fertilizers to enterprises - consumers both in Russia and in neighboring countries and their import substitution.

Special Applications:
- toner cartridges
- adsorbers for arsenic,
- catalysts.

Implementation period

51 months

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$4M

Construction of a cement plant (ID 7.2)

NPV
IRR
РВР
$418M 20,8% 80 months

Objective of the project

Creation of a new production

Brief description and idea

This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.

Infrastructure support:

1. Power: available;
2. Water: available ;
3. Sewage: available ;
4. Gas: available;
5. The nearest federal highway: 235 km, 8.5 km, 5.5 km.

Project implementation stage

Proposal

The need for additional funding

$283M

Place of implementation

Kostroma Oblast

The total cost of the project

$283M

Organization of modern production of ceramic facade materials (ID 1.18)

NPV
IRR
РВР
$13M 37,47% 60 months

Objective of the project

Creation of a new production

Brief description and idea

The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.

The planned commissioning date is 2022.

The main raw material is our own raw material source - clays and loams of the Western area of ​​the Bykovsky ceramic clay deposit (up to 50%). Location of the deposit: Belgorod region, Yakovlevsky district, 0.5-1 km. South-west of the city of Stroitel and 3 km from the production site.

The main products are a wide range of ceramic panels (terracotta) for ventilated facades and decorative finishes for any type of building (up to 30 items).

The main consumers of the manufactured products are large and small enterprises of the Belgorod region and other regions of Russia, engaged in the construction industry.

Infrastructure support:

The industrial site has all the necessary engineering infrastructure: power supply, gas supply, water supply and sanitation, access roads and railways. The distance from the industrial site to the Tomarovka railway station is 22 km. The site has storage areas for raw materials and finished products.

The organization of production is planned on the basis of the operating production site of Belgorodskaya Keramika LLC, located in the Belgorod Region (Stroitel). Address: Russian Federation, Belgorod region, Stroitel, the territory of the concrete goods plant-3.

Production is supposed to be located in the existing production building of a group of workshops with adjoining technical facilities with a total area of ​​12,352 m2.

The capacity of the existing infrastructure:
1. Power, MW: 17.46;
2. Water, m3/hour: 4 artesian wells, capacity - 120 m3/hour, when replacing pumps, an increase up to 200 m3/hour is possible; 2 tanks, capacity - 800 m3/hour; 2 pipelines, d = 100 mm, capacity - 360 m3/hour;
3. Sewage, m3/hour: 520;
4. Gas, m3/hour: 500 m3/hour, when replacing the HPH (high pressure reducer), it is possible to increase up to 4000 m3/hour;
5. The nearest federal highway: M-2 (2.5 km).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$24M

Place of implementation

Belgorod Oblast

The total cost of the project

$24M

Organization of production of strontium based on celestite ores (ID 17.5)

NPV
IRR
РВР
- -

Objective of the project

Creation of a new production

Brief description and idea

It is planned to build an enterprise for the extraction and processing of celestite ores.

Celestine is a raw material for the production of strontium compounds used in sugar, glass, ceramics, pharmaceutical industries, and pyrotechnics. During the extraction of strontium, an equally important by-product is formed - dolomite, which is used in the production of refractory material, building materials, and rubber.

Infrastructure support:

More than 20 deposits of strontium ores with total predicted resources of about 200 million tons have been discovered. In the Tula region, the Tabolskoye deposit has been explored and about 30 ore occurrences have been discovered.

The capacity of the existing infrastructure:
1. Power, MW: up to 100 MW (in the future, up to 150 MW);
2. Water, m3/hour: up to 26 thousand m3/day;
3. Sevage, m3/hour: up to 26 thousand m³/day;
4. Gas, m3/hour: up to 500 thousand m³/day;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 "Don" (passes along the border of the industrial park and the SEZ).

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Tula Oblast

The total cost of the project

$29M

Manufacture of plaster products (ID 13.6)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the production of various types of gypsum binders and products based on them: dry mixes (SGS), tongue-and-groove slabs (GWP), gypsum boards (GKL).

Infrastructure support:

One of the largest gypsum deposits is located on the territory of the Ryazan region, the reserves of which are sufficient for the implementation of a large-scale investment project: the Lazinskoye deposit in the Skopinsky district with balance reserves of gypsum of more than 300 million tons.

Project implementation stage

Proposal

The need for additional funding

$121M

Place of implementation

Ryazan Oblast

The total cost of the project

$121M

Organization of production of clinker tiles (ID 12.7)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

It is planned to create the production of clinker tiles. Products are manufactured on a conveyor line. Each of its components is an independent unit, with the possibility of replacement.

Infrastructure support:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Orlov Oblast

The total cost of the project

$4M

Construction of a cement plant (ID 1.19)

NPV
IRR
РВР
$40M 31,06% 5,3 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an enterprise for the production of gray cement using the Shebekinsky chalk quarry as a raw material base.

The main partners and consumers of the products of the created production will be the companies JSC ZhBK-1 Plant and JSC Belgorodasbestocement (BELATSI). The total consumption of cement by companies amounted to 347 thousand tons per year.


Infrastructure support:

The project is fully provided with raw materials. It is planned to use the existing open pit of CJSC Shebekino-mel (Logovoye deposit).

In the city of Shebekino there is a site with explored reserves of chalk raw materials with a volume of 22,000,000 tons. A deposit with a volume of chalk of 5,000,000 tons is adjacent to the above site. Also, a promising deposit is located 10 km away, the chalk reserves of which are approximately 30,000,000 tons. The quality of the chalk is at a very high level, which is confirmed by the results of geological analysis. As part of the project, it is planned to use an investment site with an area of ​​15 hectares near the chalk plant of Shebekinsky Chalk Plant JSC.

The industrial site has all the necessary engineering infrastructure: electricity, gas, access roads and railways. The distance from the industrial site to the highway "Rzhevskoye highway" is 400 m, to the town of Shebekino (regional center) - 3 km.

The construction of industrial buildings, engineering and transport infrastructure facilities, including production and storage buildings, driveways, roads and logistics sites, a system of electricity, gas, water supply and sanitation (increasing the capacity of networks) is envisaged.
The project involves the purchase of technological equipment (production lines) from Jiangsu Pengfei Group Co (PRC); related equipment from BEDESCHI (Italy).

The capacity of the existing infrastructure:
1. Power, MW: 21.23;
2. Gas, m3/hour: 833;
3. The nearest federal highway: 14K-3.

Implementation period

22 months

Project implementation stage

Proposal

The need for additional funding

$54M

Place of implementation

Belgorod Oblast

The total cost of the project

$54M

Organization of red brick production (ID 12.9)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.

Infrastructure support:

1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);
2. Water, m3/hour: it is necessary to drill an artesian well. The territory of the district is provided with large explored reserves of water;
3. Gas, m3/hour: at a distance of 500 m from the boundaries of the site there is a main high-pressure gas pipeline;
4. The nearest federal highway: M-2 (50 km).

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Orlov Oblast

The total cost of the project

$3M

Organization of production of refractory red bricks (ID 12.12)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of an enterprise for the production of refractory bricks. The scope of this brick as the main furnace material in civil engineering, municipal infrastructure of settlements, including boiler houses, thermal power plants.

Infrastructure support:

1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);
2. Water, m3/hour: it is necessary to drill an artesian well. The territory of the district is provided with large explored reserves of water;
3. Gas, m3/hour: at a distance of 500 m from the boundaries of the site there is a main high-pressure gas pipeline;
4. The nearest federal highway: M-2 (50 km).

Project implementation stage

Proposal

The need for additional funding

$39M

Place of implementation

Orlov Oblast

The total cost of the project

$39M

Organization of production of panels for industrial housing construction (ID 12.13)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

It is planned to create the production of panels for industrial housing construction:
- construction of production areas and warehouses;
- acquisition of metal molds and lifting mechanisms;
- creation of a concrete mixing unit.

Infrastructure support:

1. Power, MW: 10 MW - design power, 4.7 MW - free power;
2. Water, m3/hour: 36 m3/hour - design capacity, 24 m3/hour - free capacity;
3. Sewage, m3/hour: 75 m3/hour - design capacity, 69 m3/hour - free capacity;
4. Gas, m3/hour: 6,500 m3/hour - design capacity, 6,260 m3/hour - free capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Orlov Oblast

The total cost of the project

$4M

Organization of red brick production (ID 12.9)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.

Infrastructure support:

1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);
2. Water, m3/hour: it is necessary to drill an artesian well. The territory of the district is provided with large explored reserves of water;
3. Gas, m3/hour: at a distance of 500 m from the boundaries of the site there is a main high-pressure gas pipeline;
4. The nearest federal highway: M-2 (50 km).

The need for additional funding

$3M

Place of implementation

Orlov Oblast

The total cost of the project

$3M

Organization of production of fine porous aggregate (ID 1.21)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Organization of modern production of new building material on the basis of the existing expanded clay plant of the former ZhBI-3 plant, located in the town of Stroitel, Yakovlevsky district, Belgorod region, by modernizing it.

The reserves of the deposit are calculated on an area of ​​96.3 hectares and amount to 11440 thousand m3, including categories: A - 604 thousand m3, B - 2222 thousand m3, C1 - 8614 thousand m3.

The planned date for reaching the design capacity is 2024.

As of 2020, a survey of the production site was made and a decision was made to recognize it as the most promising for the implementation of the project, a project was developed to modernize the plant and organize a pilot production of fine porous aggregate for concrete.

Infrastructure support:

The project site is currently an industrial site of the PDS BS group of companies (the territory of the former ZHBI-3 Plant OJSC, with an area of ​​about 30 hectares, including about 6.7 hectares occupied by an industrial complex for the production of expanded clay.

Use of the local raw material base - the Ternovsky deposit of clay raw materials, located in the Yakovlevsky district of the Belgorod region, 15 km southeast of the town of Stroitel.

The industrial site has all the necessary engineering infrastructure: power supply, gas supply, water supply and sanitation, access roads and railways. The distance from the industrial site to the Tomarovka railway station is 22 km.

The project involves the purchase of technological equipment (production lines) of the following companies: Cemek Minerals LLC (Russia), IBU-tech AG (Germany), Ural Omega CJSC (Russia), Plinfa LLC (Ukraine).

The capacity of the existing infrastructure:
1. Power, MW: 16;
2. Water, m3/hour: two wells: 40 and 10 cubic meters. m per hour. It is possible to switch to the water supply from city networks. Own network of sewer facilities;
3. Sewage, m3/h: own network of sewer facilities;
4. Gas, m3/hour: 11 million cubic meters m per year (in reserve). The total limit is 20 million cubic meters. m;
5. Availability of a railway line: Gostishchevo station (18 km);
6. The nearest federal highway: M-2.

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Belgorod Oblast

The total cost of the project

$5M

Establishment of building materials production (ID 11.33)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Manufacture of finishing products and construction products.

Infrastructure support:

1. The nearest federal highway: M-1 (24 km), M-9 (42 km).

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Moscow Oblast

The total cost of the project

$3M

Construction of a cement plant (1st stage) (ID 6.13)

NPV
IRR
РВР
$79M 17% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of the first stage of the plant for the production of cement.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 15 km.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$600M

Place of implementation

Kaluga Oblast

The total cost of the project

$621M

Construction of a cement plant (2nd stage) (ID 6.14)

NPV
IRR
РВР
$17M 17% 60 months

Brief description and idea

Construction of the second stage of the plant for the production of cement.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 15 km.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$148M

Place of implementation

Kaluga Oblast

The total cost of the project

$148M

Construction of a plant for the production of wood-based sheet materials (ID 6.25)

NPV
IRR
РВР
$76К 31% 42 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of wood-based sheet materials in order to meet the needs of the domestic market for high-quality and competitive domestic timber and paper products, ensure environmental safety, and sustainably meet public needs for forest resources and services.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 20 km.

Implementation period

4 months

Project implementation stage

Proposal

The need for additional funding

$304 thousand

Place of implementation

Kaluga Oblast

The total cost of the project

$304К

Construction of a factory for the production of ceramic masses (ID 6.28)

NPV
IRR
РВР
$1M 18,75% 75 months

Objective of the project

Creation of a new production

Brief description and idea

Development of the Ulyanovsk deposit of refractory and refractory clays and construction of a factory for processing the extracted raw materials. The region has a developed mineral resource base, which makes it possible not only to maintain the region's high industrial potential, but also to export certain types of mineral raw materials and products of its processing to neighboring regions of Russia.

Implementation period

12 months

The need for additional funding

$62M

Place of implementation

Kaluga Oblast

The total cost of the project

$62M

Ash and slag waste processing (ID 13.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

It is planned to use the current output of ash and slag waste (ASW) from thermal power plants for the production of finished ash and slag materials (ASM) suitable for use in the building materials industry.

The need for additional funding

$20-27M

Place of implementation

Ryazan Oblast

The total cost of the project

$20-27M

Construction of a plant for the processing of celestite ores (ID 17.8)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the processing of celestite ores.

Infrastructure support:

1. Power, MW: 16;
2. Water, m3/hour: 12;
3. Sevage, m3/hour: 12;
4. Gas, m3/hour: 10;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don.

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Tula Oblast

The total cost of the project

$29M

Construction of a plant for the production of radio-transparent and radio-absorbing materials (ID 17.9)

NPV
IRR
РВР
- - 72 months

Brief description and idea

Construction of a plant for the production of radio-transparent and radio-absorbing materials

Infrastructure support:

1. Power, MW: 100;
2. Water, m3/hour: 1000;
3. Sewage, m3/hour: 7000;
4. Gas, m3/hour: 1000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Tula Oblast

The total cost of the project

$27M

Construction of an enterprise for the extraction of gypsum stone (ID 17.16)

NPV
IRR
РВР
- - 96 months

Brief description and idea

Construction of an enterprise for the extraction of gypsum stone at the Bolokhovsky, Obolensky, Skuratovsky deposits.

Infrastructure support:

1. Power, MW: 30;
2. Water, m3/hour: 20;
3. Sewage, m3/hour: 20;
4. Gas, m3/hour: 15;
5. The nearest federal highway: M-4 Don.

Project implementation stage

Proposal

The need for additional funding

$67M

Place of implementation

Tula Oblast

The total cost of the project

$67M

Creation of paint and varnish production (ID 17.28)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of varnishes, paints, enamels, primers, adhesives, fillers, coloring pigments and drying oils.

Infrastructure support:

1. Power, MW: 60;
2. Water, m3/hour: 100;
3. Sewage, m3/hour: 100;
4. Gas, m3/hour: 450;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-2 Crimea.

Project implementation stage

Proposal

The need for additional funding

$13M

Place of implementation

Tula Oblast

The total cost of the project

$13M

Construction of a modern production facility for the production of knitwear (ID 6.12)

NPV
IRR
РВР
$8M 53% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a modern production facility for the production of knitwear.

Infrastructure support:

The capacity of the existing infrastructure of the 1st section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 17 km.

The capacity of the existing infrastructure of the 2nd section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. Nearest federal highway: M-3, 2.4 km

The capacity of the existing infrastructure of the 3rd section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. Nearest federal highway: M-3, 1.5 km

The capacity of the existing infrastructure of the 4th section:
1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: A-130, 20 km, M-3, 24 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$21M

Place of implementation

Kaluga Oblast

The total cost of the project

$21M

Establishment of glass production (ID 4.27)

NPV
IRR
РВР
- - 3,5 years

Objective of the project

Creation of a new production

Brief description and idea

Creation of a modern competitive production of colorless and colored glass containers for the food industry.

Infrastructure support:

1. Power, MW: FGC networks: 17;
2. Water, m3/hour: 11.5;
3. Sewage, m3/hour: 0.6;
4. The presence of a railway line: at a distance of 1.8 km there is the Podgornoye station, through which the South-Eastern Railway passes;
5. The nearest federal highway: the Belgorod-Pavlovsk highway and is located 25 km from the Voronezh-Lugansk highway and 45 km from the M-4 federal highway.

Project implementation stage

Proposal

The need for additional funding

$175M

Place of implementation

Voronezh Oblast

The total cost of the project

$175M

Organization of production of medical textiles (ID 5.3)

NPV
IRR
РВР
$10M 19% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Enterprise for the production of medical textiles. The main products are functional medical textiles.

Infrastructure support:

1. Power, MW: 8;
2. Water, m3/hour: 550;
3. Sewage, m3/hour: 160;
4. Gas, m3/hour: 4000;
5. The presence of a railway line;
6. The nearest federal highway: M-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$16M

Place of implementation

Ivanov Oblast

The total cost of the project

$8M

Establishment of leather production (ID 4.11)

NPV
IRR
РВР
- - 3,5 years

Objective of the project

Creation of a new production

Brief description and idea

Construction of a full-cycle enterprise for the production of finished leather in the Voronezh region.

Infrastructure support:

1. Power, MW: 6.49;
2. The presence of a railway line: the station "Davydovka" is located at a distance of 2 km;
3. The nearest federal highway: The federal highway M4 "Don" is 11 km away.

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Voronezh Oblast

The total cost of the project

$4M

Creation of a packaging cardboard and printing plant (ID 18.6)

NPV
IRR
РВР
$66M 34% 72 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project provides for the creation of a new import-substituting full-cycle production in the Yaroslavl region - from high-tech pure-cellulose coated cardboard to the production of cardboard packaging. The finished products will be used in industries such as pharmaceuticals, food, in particular confectionery, perfumery and household chemicals, as well as in the tobacco industry and other industries where high-quality coated cardboard is required for packaging finished products.

In order to organize the above production on the territory of the single-industry town Tutaev, Yaroslavl region, a new legal entity was created - LLC PO Romanovsky Pechatnik.

It should be noted that the implementation of the Project will reduce the high share of imports of coated cardboard, which currently accounts for more than 80% of the profile market.

OOO PO Romanovsky Pechatnik plans to build a production building on a land plot located in the industrial park Tutaev with an area of ​​168,601 sq. m. This land plot was provided by OOO PO Romanovskiy Pechatnik for sublease.

The production technology that will be applied within the framework of this Project in terms of the production of coated cardboard is a continuous full cycle: from the preparation of thermally modified biomass for the manufacture of cardboard to the packaging of finished products with cutting into the format required by customers. This method is the most progressive and at the same time simple and economical process.

Also, within the framework of this Project, cardboard and printing products will be produced (packaging from coated cardboard with printing), where the technological process, in addition to the production of coated cardboard, includes the development and preparation of layouts for printing, directly printing on products, as well as post-printing processing and packaging of finished products.

The sale of finished products under the project will be carried out both to large organizations and small and medium-sized businesses operating in such industries as pharmaceuticals, food, in particular confectionery, industry, perfumery and household chemicals, as well as tobacco production and other industries where high-quality coated cardboard is required for packaging finished products.

Infrastructure support:

1. Power, MW: 12;
2. Water, m3/hour: 20;
3. Sewage, m3/hour: 20;
4. Gas, m3/hour: 5000;
5. The nearest federal highway: M-8 (24 km).

Implementation period

21 months

Project implementation stage

Proposal

The need for additional funding

$56M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$56M

Organization of import-substituting production of vials for medical packaging (ID 2.3)

NPV
IRR
РВР
$1M 25,31% 44 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the creation on the territory of the Bryansk region of a modern, highly efficient production facility for the production of vials from medical glass of the second hydrolytic class to meet the demand of the pharmaceutical industry in high-quality medical glassware of domestic production.

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Bryansk Oblast

The total cost of the project

$3M

Pharmaceutical manufacturing (ID 13.7)

NPV
IRR
РВР
-

Objective of the project

Creation of a new production

Brief description and idea

In the Ryazan region, taking into account ongoing projects for the development of pharmaceutical production and the formed negotiation portfolio of investment projects, it is planned to create a pharmaceutical cluster that includes high-tech production of medicines and vaccines.

Project implementation stage

Proposal

The need for additional funding

$2-5B

Place of implementation

Ryazan Oblast

The total cost of the project

$2-5B

Construction of light rail transport in Voronezh (ID 4.17)

NPV
IRR
РВР
- - 3 years

Objective of the project

Creation of a new production

Brief description and idea

Creation of a light rail transport system in Voronezh with elements of accelerated traffic in peripheral areas, with more sparse stops and increased intervals, and with more frequent stops in the middle and central parts

Infrastructure support:

1. Power: 3,5 MW;
2. Water: 13 m3/h;
3. Sewage: 5 m3/h;
4. Gas: 2000 m3/h.

Project implementation stage

Proposal

The need for additional funding

$676M

Place of implementation

Voronezh Oblast

The total cost of the project

$676M

Construction of an automotive components production plant (ID 6.2)

NPV
IRR
РВР
$9,5M 17% 84 months

Objective of the project

Creation of a new production

Brief description and idea

The project aims to build a plant for the production of automotive components.

Infrastructure support:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 6 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$13,5M

Place of implementation

Kaluga Oblast

The total cost of the project

$13,5M

Production of small aviation aircraft for agricultural use (ID 11.1)

NPV
IRR
РВР
- - 36-60 months

Objective of the project

Creation of a new production

Brief description and idea

Development of the "RATAY" aeromobile aircraft complex for agricultural use

Infrastructure support:

1. Power: MW: 800 KW;
2. Water: m3/h: available;
3. Sewage: m3/h: available;
4. Gas: m3/h: not required;
5. The nearest federal highway: A-108 (50m), M-5 "Ural" (8km).

Project implementation stage

Proposal

The need for additional funding

$7,4M

Place of implementation

Moscow Oblast

The total cost of the project

$7,4M

Construction of a plant for the production of automated modular complexes (ID 9.1)

NPV
IRR
РВР
- 15,05% 89 months

Objective of the project

Creation of a new production

Brief description and idea

"ZOOTECH" is planning to establish the production of equipment for the production of protein-lipid concentrate (zooprotein) in the Lipetsk Oblast. The production cycle includes the process of producing complete modular lines for the production of protein-lipid concentrate for animal feed.

Infrastructure support:

1. Power: 1 MW;
2. Water: 0,67 m3/h;
3. Sewage: 0,58 m3/h;
4. The railway line: available;
5. The nearest federal highway: М4 (70 km), М6 (85 km).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Lipetsk Oblast

The total cost of the project

$5M

Creation of Russian electric cars production (ID 9.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a high-tech full-cycle plant for car production. Total site area - 70,000 m2, production capacity - more than 300,000 vehicles per year.

Infrastructure support:

1. Power: 40 MW;
2. Water: m3/h: available;
3. Gas: m3/h: gas consumption 8,700 nm3/hour;
4. The railway line: available;
5. The nearest federal highway: М-4 "Don" (42 km).

Project implementation stage

Proposal

The need for additional funding

$176M

Place of implementation

Lipetsk Oblast

The total cost of the project

$176M

Production of filling and packaging machines (ID 5.9)

NPV
IRR
РВР
- 5,5 years

Objective of the project

Creation of a new production

Brief description and idea

Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.

Infrastructure support:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. Gas: m3/h: 25 Gcal/hour;
4. The railway line: available;
6. The nearest federal highway: М-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$9,5M

Place of implementation

Ivanovo Oblast

The total cost of the project

$9,5M

Manufacture of third generation disposable syringes (ID 18.2)

NPV
IRR
РВР
$13M 22,9% 36 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of a plant for the production of self-destructing syringes of the third generation.

Infrastructure support:

1. Power, MW: IDGC of Center Yarenergo;
2. Water, m3/hour: water utility;
3. Sewage, m3/hour: water utility;
4. Gas, m3/hour: Gazprom gas distribution.

Implementation period

21 months

Project implementation stage

Proposal

The need for additional funding

$1M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$1M

Production of components for special vehicles (ID 5.10)

NPV
IRR
РВР
- - 5,5 years

Objective of the project

Creation of a new production

Brief description and idea

The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.

Infrastructure support:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. Gas: m3/h: 25 Gcal/hour;
4. The railway line: available;
6. The nearest federal highway: М-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$11M

Place of implementation

Ivanovo Oblast

The total cost of the project

$11M

Organization of production of tableted and encapsulated medicinal products (ID 1.17)

NPV
IRR
РВР
$108M 37,43% 112 months

Objective of the project

Creation of a new production

Brief description and idea

The main goal of the investment project is to organize modern production of medicines in the form of tablets and capsules. The enterprise being created should ensure the uninterrupted production of a wide range of high-quality pharmaceutical products to meet the needs of all groups of the region's population in medicines at affordable prices, reduce Russia's dependence on imports of medicines and raw materials for their production.

The planned date for reaching the design capacity is 2023.

The main consumers of the project products are located on the territory of the Central Federal District.

As part of the project, it is planned to create at least 150 new jobs with an average salary of at least 32,000 rubles.

Infrastructure support:

The project site is currently an undeveloped land plot with an area of ​​24.3 hectares, 40 km from the city of Belgorod and 5 km from the town of Stroitel (the center of the municipality).

The project provides for the construction of engineering and transport infrastructure facilities, driveways, roads and logistics sites, electricity, gas and water supply systems (increase in network capacity). It is planned to build technological premises for the production of substances and ampoules, technical premises, a storage warehouse for finished products and raw materials.

The nearest federal highways from the object are E-105 and M-2.

Implementation period

30 months

Project implementation stage

Proposal

The need for additional funding

$1B

Place of implementation

Belgorod Oblast

The total cost of the project

$1B

Construction of an automotive components production plant (ID 17.1)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

"The Uzlovaya" Industrial Park was the site of one of Russia's largest car manufacturing projects in 2018, implemented by the Russian division of China's Great Wall Motor Company Limited.

Infrastructure support:

1. Power: up to 100 MW;
2. Water: m3/h: 26000 m3/day;
3. Sewage: m3/h: 26000 m3/day;
4. Gas: m3/h: 500 000 m3/day;
5. The nearest federal highway: М-4 (100 m).

Project implementation stage

Proposal

The need for additional funding

$13,5M

Place of implementation

Tula Oblast

The total cost of the project

$13,5M

Industrial electric motor production (ID 12.15)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the production of electric motors designed to convert energy. This type of device transforms electric power into motive power or mechanical work.

Infrastructure support:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$122M

Place of implementation

Oryol Oblast

The total cost of the project

$122M

Production of traction electric motors (ID 12.18)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves creating a full production cycle for traction electric motors: producing components, assembling, and testing them.
In addition to railway transport, traction motors will also be in demand in other sectors of the economy - oil and gas, metallurgy, mining, and power generation.

Infrastructure support:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$88M

Place of implementation

Oryol Oblast

The total cost of the project

$88M

Establishing the production of automobile gas tanks (ID 1.14)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The planned commissioning date is 2023.
The main consumers of the output products are large and small businesses in the Belgorod Oblast and other regions of Russia engaged in transportation services.

Infrastructure support:

The industrial site has all necessary engineering infrastructure: power supply, gas supply, water supply, and sewage.
1. The railway station: "Tomarovka" (22 km);
2. The nearest federal highway: M-2.

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Belgorod Oblast

The total cost of the project

$4M

Creation of a sealing materials plant (ID 17.25)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of production of high-temperature composite sealing materials

Infrastructure support:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 ""Don"" (1 km).

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Tula Oblast

The total cost of the project

$4M

Expansion of diesel engine production (ID 17.31)

NPV
IRR
РВР
- - 84 months

Objective of the project

Creation of a new production

Brief description and idea

Organizing increased output of diesel engines with a prospective program of up to 3,000 engines per year at "Tulamashzavod". The project is aimed at reconstructing production facilities and purchasing the necessary equipment to expand production capacity and increase diesel engine output.

Infrastructure support:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway".

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Tula Oblast

The total cost of the project

$3M

Construction of a composite coating plant (ID 17.35)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an organization for the production of polymer and composite coatings for aviation, rocket and space, special equipment, and other industries

Infrastructure support:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don" (1 km).

Project implementation stage

Proposal

The need for additional funding

$22M

Place of implementation

Tula Oblast

The total cost of the project

$22M

Construction of a plant for the production of mining equipment (ID 17.36)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of equipment for drilling and pumping of ultra-deep oil and gas wells

Infrastructure support:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$5,4M

Place of implementation

Tula Oblast

The total cost of the project

$5,4M

Creation of an automotive component production complex (ID 17.42)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a production complex for automotive components in the private and commercial vehicle segments

Infrastructure support:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don" (1 km).

Project implementation stage

Proposal

The need for additional funding

$270,3M

Place of implementation

Tula Oblast

The total cost of the project

$270,3M

Creation of a rabbit farm (ID 1.7)

NPV
IRR
РВР
$173К 39,7% 49,56 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a rabbit farm located in the Ivnyansky district, Belgorod Oblast
The project involves farming meat rabbits of the California breed. 
The planned date of reaching the projected capacity is 2022.
The project site is currently an undeveloped land plot of 55.9 hectares, 64 km from the city of Belgorod. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. 
The distance from the industrial site to the federal highway M-2 "Krym" is 5.5 km.
The main consumers of the project's products are located in the Central Federal District.

Infrastructure support:

1. Power: available;
2. Water: m3/h: available;
3. Gas:m3/h: available;
4. The nearest federal highway: available.

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$280К

Place of implementation

Belgorod Oblast

The total cost of the project

$280К

Construction of a plant for the production of frozen cooked potatoes and potato flakes (ID 2.2)

NPV
IRR
РВР
$27M 15,4% 76 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of frozen cooked potatoes and potato flakes

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$62M

Place of implementation

Bryansk Oblast

The total cost of the project

$66M

Construction of a greenhouse complex for year-round cultivation of vegetable crops (ID 2.4)

NPV
IRR
РВР
$2,53M 3,95% 7,4 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of an ultra-modern greenhouse complex using the latest achievements of the world's crop production in the protected ground.

Infrastructure support:

1. Power: connectivity available;
2. Water: m3/h: connectivity available;
3. Sewage: m3/h: connectivity available;
4. Gas: connectivity available;
5. The nearest federal highway: R-120 (1,5 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$25M

Place of implementation

Bryansk Oblast

The total cost of the project

$25M

Production of pharmaceutical substances (ID 17.7)

NPV
IRR
РВР
- -

Objective of the project

Creation of a new production

Brief description and idea

Production of pharmaceutical substances

Infrastructure support:

1. Power, MW: 8;
2. Water, m3/hour: 12;
3. Sewage, m3/hour: 12;
4. Gas, m3/hour: 6;
5. The nearest federal highway: M-4 Don.

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Tula Oblast

The total cost of the project

$27M

Construction of a grain advanced processing complex (ID 4.6)

NPV
IRR
РВР
$42M 15,78% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a complex for advanced processing of wheat grain to produce gluten, bran, amino acids, lactic acid, fodder product, crystalline glucose

Infrastructure support:

1. Power: 15 MW;
2. Water: 62 m3/h;
3. Sewage: 62 m3/h;
4. Gas: 6000 m3/h.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$203M

Place of implementation

Voronezh Oblast

The total cost of the project

$203M

Construction of a plant for the production of medical isotope (ID 17.17)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of the production of medical isotope TS99.

Infrastructure support:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage: 7000 m3/h;
4. Gas: 1000 m3/h;
5. The presence of a railway line:;
6. The nearest federal highway: M-4 Don (1 km)

Project implementation stage

Proposal

The need for additional funding

$81M

Place of implementation

Tula Oblast

The total cost of the project

$81M

Manufacture of 10-wire reinforcing ropes (ID 3.2)

NPV
IRR
РВР
$864M 58,87 -

Objective of the project

Creation of a new production

Brief description and idea

When reinforcing prestressed products with K7 ropes, one of the key problems is the insufficient adhesion force of the rope to concrete. When transversely cutting the workpiece into products, rope slippage often occurs, which is manifested by the retraction of the reinforcement deep into the product. This phenomenon has a negative effect on the bearing capacity, so the product, depending on the scale of the problem, is transferred to lower strength groups or cut to smaller lengths for which the stored tension is sufficient, and in some cases even rejected. These problems are completely solved by using the TK10 rope as reinforcement on the BOF lines.
TK10 is an innovative ten-wire steel triangular rebar intended for use in prestressed concrete products. The innovation consists in changing the cross-sectional shape of a standard 7-wire reinforcing rope by creating pronounced side edges by adding 3 additional wires to the rope, which protrude significantly in space.
This form gives a high grip to the reinforcing rope, in contrast to the standard rope in which the grip occurs only due to adhesion. The protruding edges of the TK10 rope increase grip, similar to the protruding threads. In addition, the adhesion is additionally reinforced with a periodic profile, which excludes the rope from being screwed into the concrete according to its own imprint.

Infrastructure support:

1. Power, MW: the estimated power of electrical receivers is 2.7 MW,
2. Water, m3/h: the stabilization line includes a closed water cooling system using clean industrial water. Compensation for evaporation losses in
volume of 0.1 m3 for the production of 1 ton of products. At maximum production capacity, clean water consumption for technological needs will not exceed 1 m3/hour.
The laboratory and administrative premises use drinking water that meets the requirements of SanPiN 2.1.4.559 “Drinking water. Hygienic requirements for
water quality of centralized drinking water supply systems”. Average consumption of drinking water: 3 m3/day.

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Vladimir Oblast, Kameshkovo

The total cost of the project

$29M

Manufacture of finished metal products (ID 13.4)

NPV
IRR
РВР
- -

Objective of the project

Creation of a new production

Brief description and idea

Production of building metal structures (MK) by hot-dip galvanizing of a wide range.

Project implementation stage

Proposal

The need for additional funding

$25M

Place of implementation

Ryazan Oblast

The total cost of the project

$25M

Creation of a foundry – a high-tech foundry and mechanical plant (ID 9.3)

NPV
IRR
РВР
- 33,1% 78 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a high-tech foundry and mechanical plant for the production of parts from gray and high-strength cast iron for the automotive industry, railway transport engineering and other industries. At the first stage, it is planned to create a foundry, at the second - the construction of a workshop for the machining of castings and the introduction of a full production cycle.

Infrastructure support:

1. Power, MW: 20;
2. Water, m3/hour: 420;
3. Sewage, m3/hour: 7.08;
4. Gas, m3/hour: 1500;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don - 70 km, M-6 Caspian - 85 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$22M

Place of implementation

Lipetsk Oblast

The total cost of the project

$22M

Modernization of tool production (ID 17.11)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

New tool production of ITO-Tulamash JSC.

Infrastructure support:

1. Power, MW: 100;
2. Water, m3/hour: 1000;
3. Sewage, m3/hour: 7000;
4. Gas, m3/hour: 1000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Tula Oblast

The total cost of the project

$5M

Construction of a frozen vegetable, berry and mushroom production plant (ID 4.8)

NPV
IRR
РВР
$7M 16,67 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant to produce a wide range of vegetables and berries using advanced "blast chilling" technology

Infrastructure support:

1. Power: 1,05 MW;
2. The railway line: "Khokholskaya" railway station (100 m).

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$22M

Place of implementation

Voronezh Oblast

The total cost of the project

$22M

Construction of a turkey breeding complex (ID 4.9)

NPV
IRR
РВР
$47M 27,8% 48 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a turkey breeding complex

Infrastructure support:

1. Power: 3,09 MW;
2. Water: 1000 m3/h;
3. The nearest federal highway: R-193 "Voronezh - Tambov" (3,8 km), R-22 "Caspiy" (110 km), M-4 "Don" (97 km)..

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$11,4M

Place of implementation

Voronezh Oblast

The total cost of the project

$11,4M

Construction of a vegetable, berry and mushroom processing plant (ID 4.14)

NPV
IRR
РВР
$2M 12,6% -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a full-cycle fruit, berry, vegetable, and mushroom processing plant in the Voronezh Oblast

Infrastructure support:

1. Power: 3 MW;
2. The nearest federal highway: R-185 "Belgorod - Alekseevka - Rossosh" (1,2 km), the railway station-"Olkhovatka" (14 km).

Implementation period

-

Project implementation stage

Proposal

The need for additional funding

$49,3M

Place of implementation

Voronezh Oblast

The total cost of the project

$49,3M

Construction of a maize processing plant (ID 4.15)

NPV
IRR
РВР
$7,23M 25,63% 39 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a modular, full-cycle plant for the production of starches and starch products

Infrastructure support:

1. Power: 6 MW;
2. Water: m3/h: individual well;
3. Sewage: m3/h: gas pipe at a distance of 200 m;
4. The railway line: south-eastern railway line (40 m);
5. The nearest federal highway: R22 "Kaspi" (36 km).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Voronezh Oblast

The total cost of the project

$3M

Construction of a dairy cattle complex (ID 4.16)

NPV
IRR
РВР
$2M 11,96% 48 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a dairy complex in Voronezh Oblast - a loose housing farm for 1,000 dairy cows with a complete herd reproduction cycle, organisation of milk processing and fodder provision

Infrastructure support:

1. Power: 1,5 MW;
2. Water: 3 m3/h;
3. Sewage: 5 m3/h;
4. The railway line: available.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$17,6M

Place of implementation

Voronezh Oblast

The total cost of the project

$17,6M

Construction of a cattle breeding livestock complex (ID 4.18)

NPV
IRR
РВР
- - 3 years

Objective of the project

Creation of a new production

Brief description and idea

Creation of a modern and efficient agricultural facility for breeding livestock, milk, and meat production

Infrastructure support:

1. Power: 2 MW;
2. Water: 5,5 m3/h;
3. Sewage: 5 m3/h;
4. Gas: 3000 m3/h
5. The railway line: available.

Project implementation stage

Proposal

The need for additional funding

$67,6M

Place of implementation

Voronezh Oblast

The total cost of the project

$67,6M

Construction of a fruit and vegetable storage facility (ID 4.19)

NPV
IRR
РВР
$7,23M 25,63% 39 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a fruit and vegetable storage facility with a capacity of 12,000 tonnes

Infrastructure support:

1. Power: 5 MW;
2. Water: 1000 m3/h;
5. The railway line: available.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Voronezh Oblast

The total cost of the project

$15M

Milk production (ID 13.9)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Considering the available resources and the similar projects being implemented in the region, to provide the population with domestically produced milk, it is necessary to create about four cattle-breeding complexes with a production capacity of 110,000 tonnes of milk per year

Project implementation stage

Proposal

The need for additional funding

$376M

Place of implementation

Ryazan Oblast

The total cost of the project

$376M

Construction of a high-efficiency wheat processing industrial complex (ID 8.1)

NPV
IRR
РВР
$80M 15,96% 69 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project aims to create and commercially operate a high-tech wheat advanced processing complex. The facility will produce the following products: dry wheat gluten, native starch, modified starches, maltodextrin, dry glucose syrup, caramel molasses, and wheat bran-based feedstuff.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$209M

Place of implementation

Kursk Oblast

The total cost of the project

$209M

Construction of a horticultural processing plant (ID 4.13)

NPV
IRR
РВР
$2M 10,62% 42 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a horticultural processing plant

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$7M

Place of implementation

Voronezh Oblast

The total cost of the project

$7M

Construction of a tilapia fish hatchery (ID 4.21)

NPV
IRR
РВР
$3,37M 22,9% 36 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a large tilapia fish hatchery, fully replacing imported samples and providing marketable production capacity

Infrastructure support:

1. Power: 8,38 MW;
2. Water: 7596 m3/h;
3. Sewage: 220 m3/h.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$670К

Place of implementation

Voronezh Oblast

The total cost of the project

$670К

Construction of a seed production complex (ID 4.24)

NPV
IRR
РВР
$3M 40% 36 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a breeding and seed-breeding complex in the Voronezh Oblast

Infrastructure support:

1. Power: 2х6, 3 MW;
2. Water: m3/h: construction of artesian wells/water intake required.

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$3,24M

Place of implementation

Voronezh Oblast

The total cost of the project

$6M

Creation of super-intensive type gardens (ID 4.22)

NPV
IRR
РВР
- 10,53% -

Objective of the project

Creation of a new production

Brief description and idea

Creation of super-intensive type gardens

Infrastructure support:

1. Water: 150-200 m3/h.

Project implementation stage

Proposal

The need for additional funding

$7,4M

Place of implementation

Voronezh Oblast

The total cost of the project

$7,4M

Construction of a plant for component parts for metalworking machines (ID 17.19)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a new production of components for the repair and modernization of metalworking machines.

Infrastructure support:

1. Power, MW: 100;
2. Water, m3/hour: 1000;
3. Sewage, m3/hour: 7000;
4. Gas, m3/hour: 1000;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 Don (1 km).

Project implementation stage

Proposal

The need for additional funding

$675K

Place of implementation

Tula Oblast

The total cost of the project

$675K

Construction of a compound feed mill (ID 4.12)

NPV
IRR
РВР
$31,08M 20,15% 48 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of an all-purpose feed mill with a granary with a capacity of 120,000 tonnes of grain storage

Infrastructure support:

1. Power: 192 MW;
2. Water: 158,3 m3/h;
3. Sewage: 3 500 m3/h;
4. Gas: 64 900 m3/h
5. The railway line: South-Eastern Railways "Section Liski-Povorino" and "Bityug" railway station;
6. The nearest federal highway: M4 "Bobrov - Talovaya - Novokhopersk, M4 "Don" (11 km).

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$13,5M

Place of implementation

Voronezh Oblast

The total cost of the project

$13,5M

Construction of a sugar beet processing complex (ID 4.23)

NPV
IRR
РВР
$99M 20,31% 32 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a sugar beet processing complex in the Voronezh Oblast with a processing capacity of 3,500 tonnes of sugar beet and 500 tonnes of raw sugar per day

Infrastructure support:

1. Power: 1,06 MW;
2. Water: m3/h: individual well;
3. Sewage: m3/h: local sewage treatment plant construction required;
4. Gas: m3/h: facility at a distance of 3 km;
5. The nearest federal highway: M4 "Don" (11 km).

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$7,4M

Place of implementation

Voronezh Oblast

The total cost of the project

$46M

Construction of a soybean processing complex (ID 4.25)

NPV
IRR
РВР
$12M 38,14% -

Objective of the project

Creation of a new production

Brief description and idea

Construction of a soybean processing complex in the Voronezh Oblast

Infrastructure support:

1. Power: 6,6 MW;
2. The railway line: the railway station "Ternovka" (300 m);
3. The nearest federal highway: M4 "Don" (190 km), E-38-A144 "Kursk-Saratov" (30 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Voronezh Oblast

The total cost of the project

$5M

Construction of a modern greenhouse complex (ID 4.29)

NPV
IRR
РВР
$56M 42 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of an indoor greenhouse complex in the Voronezh region, producing vegetables all year round and equipped with modern equipment with automated control systems, mineral nutrition, the newest low-volume hydroponic technology with extra lighting, climate control, and a meteorological station

Infrastructure support:

1. Power: MW: 12.14 MVA;
2. Water: m3/: 1,000 cubic meters per day.

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$40,5M

Place of implementation

Voronezh Oblast

The total cost of the project

$40,5M

Construction of a poultry plant for the production of chicken eggs (ID 4.33)

NPV
IRR
РВР
- - 3 years

Objective of the project

Creation of a new production

Brief description and idea

Construction of a poultry plant for the production of chicken eggs

Infrastructure support:

1. Power: 12,14 MW;
2. The nearest federal highway: R-194 "Voronezh-Ostrogozhsk-Rossosh-Kantemirovka" (2,1 km).

Implementation period

3 years

Project implementation stage

Proposal

The need for additional funding

$5,4M

Place of implementation

Voronezh Oblast

The total cost of the project

$5,4M

Construction of a grain advanced processing plant (ID 15.1)

NPV
IRR
РВР
$278M 19,76% 6 years 4 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a new grain advanced processing facility in order to create new production capacity and fulfill orders for large companies involved in the sale of these products

Infrastructure support:

1. Power: 10 MW;
2. Water: 104,17 m3/h;
3. Sewage: 104,17 m3/h;
4. Gas: 4000-16000 m3/h;
5. The railway line: available;
6. The nearest federal highway: R-208 (2 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$282M

Place of implementation

Tambov Oblast

The total cost of the project

$282M

Mushroom production (ID 12.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves 4 types of products:
- Fresh eringas in raw condition;
- Varietal shimeji in packs;
- Raw agaric honey;
- Selected sorted chanterelles in packs.

Infrastructure support:

1. Power: MW: 10 kV: located on the land;
2. Water: m3/h: water supply is available from a wood processing plant 0.5 km from the site.

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Oryol Oblast

The total cost of the project

$5M

Production of baby porridge (ID 12.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a baby food production facility
All ingredients for production are purchased in the Orel Oblast or neighboring regions
Capital costs for land lease, construction of facilities, purchase of equipment

Infrastructure support:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 ""Crimea Highway"" (2 km).

Project implementation stage

Proposal

The need for additional funding

$65M

Place of implementation

Oryol Oblast

The total cost of the project

$65M

Organization of production of automated control and metering stations for electricity (ID 5.1)

NPV
IRR
РВР
$16M 31% 48 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.

Infrastructure support:

1. Power, MW: 10;
2. Water supply, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$47M

Place of implementation

Ivanov Oblast

The total cost of the project

$47m

Production of baby fruit puree (ID 12.5)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The aim of the project is to start the production of fruit puree for children. All ingredients for production are purchased in the Oryol Oblast from farms and agricultural farms.
Capital costs for land lease, construction of facilities, purchase of equipment

Infrastructure support:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 "Crimea Highway" (2 km).

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Oryol Oblast

The total cost of the project

$27M

Production of distilled potable alcoholic and non-alcoholic beverages (ID 14.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distillery

Infrastructure support:

1. Power: MW: 600 kW;
2. The railway line: available;
3. The nearest federal highway: M1 "Belarus" (4 km)

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Smolensk Oblast

The total cost of the project

$2M

Construction project for an automated cattle dairy farm (ID 14.1)

NPV
IRR
РВР
- 19,2% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cows

Infrastructure support:

1. The railway line: available;
2. The nearest federal highway: M-1 (25 km).

Project implementation stage

Proposal

The need for additional funding

$2,3M

Place of implementation

Smolensk Oblast

The total cost of the project

$2,3M

Creation of a broiler poultry farm (ID 14.4)

NPV
IRR
РВР
- 31 60 months

Objective of the project

Creation of a new production

Brief description and idea

Investment attraction at the former broiler farm site
Reconstruction of the production and storage site and the launch of a new production facility at the former broiler farm.

Infrastructure support:

1. Power: 3,8 MW;
2. Water: m3/h: 4 artesian wells;
3. Gas: m3/h: annual limit - 3,644,100 m3;
4. The nearest federal highway: M1 "Belarus" highway (160 km, near the road "Smolensk-Bryansk").

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Smolensk Oblast

The total cost of the project

$29M

Construction and maintenance of an industrial greenhouse complex (ID 14.5)

NPV
IRR
РВР
$39,2M 15,6% 111 months

Objective of the project

Creation of a new production

Brief description and idea

The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per year

Infrastructure support:

1. Power: 36 MW;
2. The railway line: available;
3. The nearest federal highway: M1 "Belarus" highway (1 km)."

Implementation period

37 months

Project implementation stage

Proposal

The need for additional funding

$84,3M

Place of implementation

Smolensk Oblast

The total cost of the project

$84,3M

Automation of rabbit breeding on an industrial scale (ID 8.2)

NPV
IRR
РВР
$11,1M 25,2% 66 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a rabbit breeding complex

It includes the construction of 12 paired rabbit houses in an "empty-occupied" system, 2 biogas facilities, an administrative building, a system of power, gas, and water supply, and sewage.

Infrastructure support:

1. Power: 0.04 MW.

Project implementation stage

Proposal

The need for additional funding

$17,56M

Place of implementation

Kursk Oblast

The total cost of the project

$17,6M

Construction of a vegetable drying complex project (ID 14.2)

NPV
IRR
РВР
$45M 29,2% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.
Production technology: by dehydration the most efficient in these conditions method of convective drying with the use of automatic raw material processing lines was selected.

Infrastructure support:

1. Power: 26 MW;
2. Water: 685 m3/h;
3. Sewage: 685 m3/h;
4. Gas: 495 m3/h;
5. The nearest federal highway: M1 "Belarus" highway (7,5 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$17M

Place of implementation

Smolensk Oblast

The total cost of the project

$17M

Organic fertilizer production (ID 1.3)

NPV
IRR
РВР
$120K 33,62% 59,04 months

Objective of the project

Creation of a new production

Brief description and idea

Production of "Black Gold" organic fertilizers by processing biological waste from agricultural companies in the Belgorod Oblast. Two technologies are used in the production process.

The planned date of reaching the projected capacity is 2022.

The main output of this project is BIOHUMUS. As a result of manure processing using the proposed technology, a high-quality organic fertilizer is produced. 

The project site is currently an undeveloped land plot of 26 hectares, 80 km from Belgorod. The industrial site has all the necessary engineering infrastructure: power, gas, water and wastewater supply, and access roads.

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$240K

Place of implementation

Belgorod Oblast

The total cost of the project

$240K

Production of frozen berry and vegetable crops (ID 1.4)

NPV
IRR
РВР
$2,3M 31,17% 64,56 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.
The project is expected to reach its projected capacity in 2022.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement Ivnya. The land plot is owned by Belgorod Oblast. The construction of engineering and transport infrastructure facilities, driveways, roads, and logistics sites, as well as electricity, gas, and water supply systems is planned.
The project includes the construction of a long-term storage facility for frozen products with a capacity of up to 5,000 tonnes, a sorting facility, and the purchase of blast freezing equipment.
The main consumers of the project's products are located in the Central Federal District.

Infrastructure support:

1. Power, MW: available:
2. Water, m3/hour: available;
3. Sewage, m3/hour: available;
4. Gas, m3/hour: available;
5. The nearest federal highway: M-2 "Crimea Highway" (5,5 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$8M

Place of implementation

Belgorod Oblast

The total cost of the project

$8M

Production of lamb products in the Yaroslavl Oblast (full cycle) (ID 18.12)

NPV
IRR
РВР
$23M 30,1% 85 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a lamb processing plant with modern processing and management technologies and a 1,000-head sheep breeding facility

Infrastructure support:

1. Power: 0,16 MW;
2. Water: m3/h: artesian well;
3. Gas: 1000 m3/h;
4. The railway line: available;
5. The nearest federal highway: "Uglich-Nekouz-Breytovo" highway (1,4 km)

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$20,3M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$20,3M

Industrial production of cultivated champignons (ID 18.11)

NPV
IRR
РВР
$400K 26% 84 months

Objective of the project

Creation of a new production

Brief description and idea

The project aims to create a mushroom farm for the production of cultivated champignons for sale in fresh and frozen form.

Infrastructure support:

1. Power: MW: a new grid supply center is planned;
2. Water: 1662,34 m3/h;
3. Sewage: 1270 m3/h;
4. Gas: 9000 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-9 (200 km).

Implementation period

21 months

Project implementation stage

Proposal

The need for additional funding

$8M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$8M

Construction of a confectionery plant (ID 16.2)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Production of breadcrumbs, biscuits, and other dry bakery products, production of flour confectionery, cakes, pastries, pies, and biscuits intended for long-term storage.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$63,5M

Place of implementation

Tver Oblast

The total cost of the project

$63,5M

Creation of a modern high-tech swine-breeding complex (ID 16.4)

NPV
IRR
РВР
- -

Objective of the project

Creation of a new production

Brief description and idea

Investment project for the construction of a high-tech meat processing complex, a feed mill, and a livestock breeding complex, including its own five swine-breeding complexes, a breeding and genetic center for 2,500 sows, a feed mill for up to 150,000 tonnes per year, a drying complex, a separation plant, a grass meal facility, and a storage complex. Project implementation period: 36 months. The number of employment places is 790.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$62,2M

Place of implementation

Tver Oblast

The total cost of the project

$62,2M

Creation of an innovative greenhouse complex for vegetable production (ID 16.5)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

High-tech greenhouse complex for growing greenhouse vegetables, with three phases of implementation.
The investment project involves the use of advanced and innovative equipment and technology. 
The total cost of the project is Rub 4.6 billion ($62,2 million). Project implementation period: 36 months.  

Infrastructure support:

1. The nearest federal highway: M-10 (1,5 km)

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$62,2M

Place of implementation

Tver Oblast

The total cost of the project

$62,2M

Construction of a plant for the production of semi-soft and hard cheese (ID 1.16)

NPV
IRR
РВР
$3M 10,8% 100,6 months

Objective of the project

Creation of a new production

Brief description and idea

"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.
The planned commissioning date is 2023.
Requirements for the project site: a land plot of at least 3 hectares for the construction of a production building.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement of Ivnya. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. "

Infrastructure support:

1. The nearest federal highway: M-2 "Crimea Highway" (5,5 km)

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$7M

Place of implementation

Belgorod Oblast

The total cost of the project

$7M

Construction of a plant for the production of integrated circuits (ID 6.3)

NPV
IRR
РВР
$1M 15% 84 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of microcircuits.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.4 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$25M

Place of implementation

Kaluga Oblast

The total cost of the project

$25M

Organization of production of charging stations for electric vehicles (ID 5.2)

NPV
IRR
РВР
$8M 2% 72 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.

Infrastructure support:

1. Power, MW: 10;
2. Water, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Ivanov Oblast

The total cost of the project

$5M

Organization of production of energy storage systems (ID 5.7)

NPV
IRR
РВР
- - 7,4 months

Objective of the project

Creation of a new production

Brief description and idea

Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.

Infrastructure support:

1. Power, MW: 10;
2. Water, m3/hour: 35;
3. Gas, m3/hour: 25 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Project implementation stage

Proposal

The need for additional funding

$24M

Place of implementation

Ivanov Oblast

The total cost of the project

$24M

Manufacture of complete busbar systems (ID 3.1)

NPV
IRR
РВР
$45 thousand 20,8% 170,16 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.

The investment project involves the production of complete busbar systems for power transmission with a degree of protection IP55, IP68.

The main parameters of the products planned for release:
- Bus material: copper or aluminum;
- Degree of protection of the case: IP55, IP68;
- Cast insulation is used as insulation - a compound of our own design (application
No. 2018116892 dated May 18, 2018 for obtaining a patent for the invention "Polyurethane compound of cold curing");
- The size of a standard section of busbar trunking is 3 meters.

Sections of the bus duct (bus duct system) are made using an aluminum or copper bus as a current-carrying element. The busbar section is selected depending on the electrical power transmitted by the system. The design uses a tightly compressed package of insulated busbars, enclosed in a metal or polymer case, depending on the required degree of protection.

Depending on the design and requirements of the consumer, the busbar system can contain up to five independent current-carrying conductors enclosed in one housing. The connection of the consumer of electricity to the busbar system is carried out either with the help of terminal sections of the busbar, which allow taking full power from the busbar, or by power take-offs, each designed for a certain power.

The size of a standard busbar section is 3 meters, which is a multiple of the standard column grid in construction. Also, busbar sections can be made smaller, for ease of routing and installation of the system.

Infrastructure support:

1. Power, MW: 0.37;
2. Water, m3/h: 8.11;
3. Sewage, m3/hour: 8.11;
4. Gas, m3/hour: 650;
5. The nearest federal highway: M-8.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Vladimir Oblast, Kolchuginsky district, Kolchugino city

The total cost of the project

$2M

Organization of production of household appliances (ID 12.2)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of a plant for the production of household appliances.

After the completion of the construction of the plant and the launch of production, it is planned to produce the following products:
- Vacuum cleaners;
- Mixers;
- Meat grinders;
- Accessories.

Infrastructure support:

1. Power, MW: 0.25-14.98;
2. Water, m3/hour: there is a possibility of connection;
3. Sewage, m3/hour: there is a possibility of connection;
4. Gas, m3/hour: 500;
5. Availability of a railway line: 5 km from the railway station;
6. The nearest federal highway: M-2, E-105 (10 km).

Project implementation stage

Proposal

The need for additional funding

$21M

Place of implementation

Orlov Oblast

The total cost of the project

$21M

Organization of production of logistics controllers and switching equipment (ID 12.11)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Logistic controllers and switching equipment are designed to control technological processes. These products are used both in manufacturing (for example, equipment for an automation system designed to monitor and control process processors in the quality control line of tubing, casing and oil and gas pipes) and in household appliances (for example, a washing machine control module).

The project aims to create a line of specialized products with a high level of localization for the needs of government organizations, state-owned enterprises and commercial enterprises, which will reduce dependence on foreign manufacturers.

Infrastructure support:

1. Power, MW: 0.25;
2. Water, m3/h: private networks;
3. Sewage, m3/hour: private networks;
4. Gas, m3/hour: 300;
5. Availability of a railway line: 5 km from the railway station;
6. The nearest federal highway: M-2, E-105, (7 km).

Project implementation stage

Proposal

The need for additional funding

$54M

Place of implementation

Orlov Oblast

The total cost of the project

$54M

Organization of production of electric drives (ID 5.11)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Establishment of an enterprise for the production of electric drives.

The main products are electric drives for industrial equipment, pipeline fittings, household appliances, ventilation systems.

Infrastructure support:

1. Power, MW: 8;
2. Water, m3/hour: 550;
3. Sewage, m3/hour: 160;
4. Gas, m3/hour: ;
5. Availability of a railway line: 4,000;
6. The nearest federal highway: M-7, 100 km.

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Ivanov Oblast

The total cost of the project

$27M

Deep processing of plant products (ID 17.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of a production facility for the deep processing of horticultural, fruit, berry products and the creation of ready-made meals

Infrastructure support:

1. Power: up to 100 MW: eventually up to 150 MW;
2. Water: m3/h: up to 26 000 m3/day;
3. Sewage: m3/h: up to 26 000 m3/day;
4. Gas: m3/h: up to 500 000 m3/day;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$38M

Place of implementation

Tula Oblast

The total cost of the project

$38M

Creation of a complex for the production of vegetable and green crops (ID 13.12)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project entails the construction of a greenhouse complex for the production of vegetables and green crops, with a capacity of 5,400 tonnes of vegetables per year, and the application of growing technology with a drip irrigation system and automated microclimate control "Ultra Klima".

Infrastructure support:

The territories for placement are identified by the region's declared investment projects in Rybnovsky, Pronsky, and Ryazansky districts and the "Lesnoy" Advanced Socio-Economic Development Territory.

Project implementation stage

Proposal

The need for additional funding

$288M

Place of implementation

Ryazan Oblast

The total cost of the project

$288M

Creating a craft lemonade and cider production(ID 12.10)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project aims to create a business from scratch. Foreseen costs are for the lease/purchase of land; construction of facilities for production and storage; transportation; purchase of equipment for lemonade and cider production and bottling; regular delivery of raw materials and containers; marketing strategy for market entry; advertising campaign; training and staff salaries.

Infrastructure support:

1. Power: 0,25 MW;
2. Water: m3/h: private;
3. Sewage: m3/h: private;
4. Gas: 300 m3/h;
5. The railway line: railway station (5 km);
6. The nearest federal highway: M-2, E-107 (7 km)

Project implementation stage

Proposal

The need for additional funding

$1,5M

Place of implementation

Oryol Oblast

The total cost of the project

$1,5M

Creation of animal feed production (ID 12.8)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The aim is to create a versatile product line for the production of feed for all kinds of animals. An important point is the development of its unique formulation, for which a qualified specialist with experience in the field is hired.

Infrastructure support:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$47,3M

Place of implementation

Oryol Oblast

The total cost of the project

$47,3M

Creation of a beer production (ID 12.14)

NPV
IRR
РВР
- -

Objective of the project

Creation of a new production

Brief description and idea

The aim of the project is to open a brewery in the Orel Oblast. Sales are planned in the oblast and neighboring oblasts.

Infrastructure support:

1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;
2. Water: m3/h: 36 m3/h - design capacity, 24 m3/h - spare capacity;
3. Sewage: m3/h: 75 m3/h - design capacity, 69 m3/h - spare capacity;
4. Gas: m3/h: 6,500 m3/h - design capacity, 6,260 m3/h - spare capacity;
5. The nearest federal highway: M-2 (2 km).

Project implementation stage

Proposal

The need for additional funding

$62,2M

Place of implementation

Oryol Oblast

The total cost of the project

$62,2M

Construction of a duck production and selling complex (ID 12.21)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of a complex for the production and selling of 7,000 ducks per year. The project includes the creation of a processing chain, including the purchase of ducklings, their raising, and further resale.

Infrastructure support:

1. Power: 30 MW: substation is 1,2 km away;
2. Water: m3/h: drilling of an artesian well is required;
3. Gas: m3/h: there is a high-pressure gas pipeline running 500 m away from the site;
4. The nearest federal highway: M-2 "Crimea Highway" (50 km).

Project implementation stage

Proposal

The need for additional funding

$300K

Place of implementation

Oryol Oblast

The total cost of the project

$300K

Construction of a berry farm (ID 12.22)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The implementation of an investment project involves expenses for:
- Lease (purchase) of land;
- Seedings purchase;
- Gardening equipment purchase;
- Paying salaries to hired workers;
- Expenses for the transportation of products.

Infrastructure support:

1. Power: MW:10 kV, on the land;
2. Water: m3/h: possible from wood processing plant (0,5 km);
3. Gas: m3/h: high-pressure gas pipeline - d 225, polyethylene 1 km from the site;
4. The railway line: railway station (300 m);
5. The nearest federal highway: M-2 "Crimea Highway" (50 km).

Project implementation stage

Proposal

The need for additional funding

$110K

Place of implementation

Oryol Oblast

The total cost of the project

$110K

Construction of a berry greenhouse (ID 12.23)

NPV
IRR
РВР
- -

Objective of the project

Creation of a new production

Brief description and idea

Construction of an industrial multi-span greenhouse
The greenhouse is a prefabricated structure assembled from a variety of prefabricated elements

Infrastructure support:

1. Power: MW:10 kV, on the land;
2. Water: m3/h: possible from wood processing plant (0,5 km);
3. Gas: m3/h: high-pressure gas pipeline - d 225, polyethylene 1 km from the site;
4. The railway line: railway station (300 m);
5. The nearest federal highway: M-2 "Crimea Highway" (50 km).

Project implementation stage

Proposal

The need for additional funding

$34M

Place of implementation

Oryol Oblast

The total cost of the project

$34M

Planting an intensive type apple orchard (ID 1.20)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Planting an intensive type apple orchard with drip irrigation system with an area of 45 ha, located in Ivnyansky District, Belgorod Region.
The amount of planting material per 1 hectare of the orchard area will be 2,800 seedlings.
The main consumers of the project products are located in the Central Federal District.

Infrastructure support:

The construction of engineering and transport infrastructure, driveways, roads and logistics sites, electricity, gas and water supply system is planned

Project implementation stage

Proposal

The need for additional funding

$2,8M

Place of implementation

Belgorod Oblast

The total cost of the project

$2,8M

Construction of a wholesale distribution center for agricultural products (ID 4.20)

NPV
IRR
РВР
$98M 20,31% 32 months

Objective of the project

Creation of a new production

Brief description and idea

Construction in the Voronezh region of a wholesale distribution center for agricultural products, designed to supply potatoes, onions, cabbage, carrots and table beets, storage, pre-sale preparation and delivery of products grown by local producers to retail chains and other trade organizations.

Infrastructure support:

1. Power, MW: SS 110 kV "Bobrov" 20 km, power reserve 192 MVA;
2. Water, m3/h: own water intake facilities, groundwater depth
90-110m;
3. Gas, m3/hour: 15-20 thousand;
4. The nearest federal highway: the site is located 30 km from the federal highway M4 "DON".

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$45M

Place of implementation

Voronezh Oblast

The total cost of the project

$45M

Construction of an industrial park (ID 11.3)

NPV
IRR
РВР
$6M - 204 months

Objective of the project

Creation of a new production

Brief description and idea

An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.

Infrastructure support:

1. Power, MW: 40;
2 Gas, m3/hour: 15,000;
3. The nearest federal highway: A-107 (0 m), Central Ring Road (1 km), M-4 "Don" (13 km), M-2 "Crimea" (28 km).

Implementation period

18 months (for one object)

Project implementation stage

Proposal

The need for additional funding

$675M

Place of implementation

Moscow Oblast

The total cost of the project

$675M

Creation of an agro-industrial technology park (ID 11.16)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.

Infrastructure support:

1. Power, 3 MW;
2. Water: m3/hour: 650 m3/day;
3. Sewage: m3/hour: 2000 m3/day;
4. Gas: 2200 m3/hour;
5. The nearest federal highway: R-106 (2 km)

Project implementation stage

Proposal

The need for additional funding

$68,5M

Place of implementation

Moscow Oblast

The total cost of the project

$68,5M

Multifuel automobile filling station (MAZS) (ID 1.5)

NPV
IRR
РВР
$878 thousand 10,33% 92,28 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an automobile filling station that provides the possibility of refueling vehicles with compressed natural gas, liquid motor fuel, liquefied hydrocarbon gas. The project is planned to be implemented as part of the program for the development of gas motor fuel in the Belgorod Region

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$1,5M

Place of implementation

Belgorod Oblast

The total cost of the project

$1,5M

Construction of a multifunctional greenhouse complex (ID 11.22)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of an agro-industrial cluster combining vegetable and flower production in the area of protected ground production in Lukhovitsy district

Infrastructure support:

1. The nearest federal highway: M-5 "Ural"

Project implementation stage

Proposal

The need for additional funding

$39,2M

Place of implementation

Moscow Oblast

The total cost of the project

$39,2M

Creation of an Atlantic salmon farming plant (ID 11.23)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of an Atlantic salmon farming plant in the Kashira urban district

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$54M

Place of implementation

Moscow Oblast

The total cost of the project

$54M

Construction of a wholesale distribution center (ID 1.11)

NPV
IRR
РВР
$857 thousand 11,32$ 112,56

Objective of the project

Creation of a new production

Brief description and idea

Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.

The presence of a slaughterhouse for up to 5 cattle or 10 pigs and equipment for intensive cooling and shock freezing will ensure high-quality primary processing of pork and cattle meat, which will significantly increase the competitiveness and profitability of the products.

The planned date for reaching the design capacity is 2022.

The project site is currently an undeveloped land plot with an area of ​​55.9 hectares, 64 km from the city of Belgorod and 26 km from the village of Ivnya (the center of the municipality). The land plot is owned by the Belgorod region.

The construction of engineering and transport infrastructure facilities, driveways, roads and logistics sites, a system of electricity, gas and water supply (increasing the capacity of networks) is envisaged.

The project involves the construction of a warehouse for long-term storage of apples with a total capacity of up to 1500 tons with a sorting workshop (LLC EUROHOLOD, Moscow). Construction of a refrigeration and freezing warehouse (LLC PROFSTAL). Completion of the slaughter shop for up to 5 cattle or 10 pigs (DiPiProm LLC).

The main consumers of the services of the wholesale distribution center are small-scale agricultural producers of the Ivnyansky, Rakityansky, Prokhorovsky districts of the Belgorod region, as well as Bolshesoldatsky, Belovsky, Oboyansky districts of the Kursk region.

Infrastructure support:

1. Power, MW: source 1 - SS-35/10kV "Kochetovka"; electricity was supplied according to a temporary scheme with a capacity of 630 kW, TU No. 5-199 / 20284964 of 12/19/2013;
2. Water, m3/h: possible with the help of well drilling; to meet the demand of 125 m3/hour, it is necessary to drill 6 water wells of 25 m3/hour each (5 working and 1 reserve);
3. Gas, m3/h: source - GDS s. Small Mayachki (P 0.6 MPa), underground gas pipeline; free peak load 2 - 6.7 thousand m3/hour; a gas pipeline with a maximum hourly flow rate of 6.6 thousand m3/hour was connected, TU No. 7566 dated November 29, 2013;
4. The nearest federal highway: M-2 "Crimea" (5.5 km).

Project implementation stage

Proposal

The need for additional funding

$26M

Place of implementation

Belgorod Oblast

The total cost of the project

$26M

Organization of logistics and storage facilities (ID 17.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Organization of industrial real estate objects in the Tula region (distribution center, fulfillment, temperature warehouse, temporary storage warehouse, etc.).

Infrastructure support:

1. Power, MW: up to 100 MW (in the future, up to 150 MW);
2. Water, m3/hour: up to 26 thousand m3/day;
3. Sewage, m3/hour: up to 26 thousand m³/day;
4. Gas, m3/hour: up to 500 thousand m³/day;
5. The presence of a railway line: yes;
6. The nearest federal highway: M-4 "Don" (passes along the border of the industrial park).

Project implementation stage

Proposal

The need for additional funding

$40M

Place of implementation

Tula Oblast

The total cost of the project

$40M

Construction of transport interchange hub of TPU (ID 11.9)

NPV
IRR
РВР
$1M 21,4% 7,9 months

Objective of the project

Creation of a new production

Brief description and idea

Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.

Implementation period

108 months

Project implementation stage

Proposal

The need for additional funding

$1B

Place of implementation

Moscow Oblast

The total cost of the project

$1B

Construction of transport interchange hub of TPU (ID 11.17)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$181M

Place of implementation

Moscow Oblast

The total cost of the project

$181M

Construction of transport interchange hub of TPU (ID 11.18)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.

Infrastructure support:

1. The presence of a railway line

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$67M

Place of implementation

Moscow Oblast

The total cost of the project

$67M

Construction of a production and warehouse complex (ID 11.20)

NPV
IRR
РВР
- 19,4% 96 months

Objective of the project

Creation of a new production

Brief description and idea

Design and construction of a production and warehouse complex in the Mozhaisk city district.

Infrastructure support:

1. Power, MW: 3;
2. Water, m3/hour: 510;
3. Sewage, m3/hour: 980;
4. Gas, m3/hour: 1194;
5. The nearest federal highway: M1 "Belarus", 0 km (ZU are adjacent to the highway).

Implementation period

14 months – 1st stage, 12 months. – 2nd stage

Project implementation stage

Proposal

The need for additional funding

$47M

Place of implementation

Moscow Oblast

The total cost of the project

$47M

Construction of ropeways (ID 10.1)

NPV
IRR
РВР
- -

Objective of the project

Creation of a new production

Brief description and idea

At the moment, the implementation of two projects for the construction of cable cars has been approved. One of the projects is being implemented on a concession basis and involves the creation of a cable car between Skhodnenskaya and Rechnoy Vokzal stations at the expense of private investment.

Another project planned for implementation involves the creation of a cable car with three stations, providing transport links between the Nagatinskaya metro station, the Marc Chagall embankment and the ZIL territory. The possibility of building other ropeways is being considered.

Project implementation stage

Proposal

The need for additional funding

$105M

Place of implementation

Moscow

The total cost of the project

$105M

Construction of an industrial and logistics complex (ID 11.21)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.

Infrastructure support:

1. Power, MW: 10 with a possible increase;
2. Water, m3/hour: individual well;
3. Gas, m3/hour: gas pipeline along the border, but reconstruction of the Yakot GDS is required;
5. Availability of a railway line: ;
6. The nearest federal highway: Dmitrovskoe shosse (A-104) - 300 m, A-108 (part of the Dmitrov bypass) - passes through the project area.

Project implementation stage

Proposal

The need for additional funding

$40M

Place of implementation

Moscow Oblast

The total cost of the project

$40M

Construction of a logistics center (ID 11.34)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Construction of a logistics center in the urban district of Serebryanye Prudy.

Infrastructure support:

1. Power, MW: 5.53;
2. The nearest federal highway: M-6 Caspian, 300 m.

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Construction of light rail lines (ID 11.37)

NPV
IRR
РВР
- - 168 months

Objective of the project

Creation of a new production

Brief description and idea

The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Construction of a plant for the production of automated modular complexes for the production of feed additives and nutrients (ID 9.2)

NPV
IRR
РВР
- 17,6% 84 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction on the territory of the Lipetsk region of a specialized logistics complex for seed products and plant protection products with a total area of 8,000 square meters.

Infrastructure support:

The project is being implemented on the territory of the Special Economic Zone of the industrial production type "Lipetsk" in the Yelets district. The construction of the required amount of space is planned to be carried out on a plot of 6 hectares, which guarantees the provision of all the required characteristics for a class "A" warehouse complex of the European standard.
1. Power, MW: 1;
2. Water m3/hour: 12.5 m3/day;
3. Sewage m3/hour: 12.5 m3/day;
4. Gas, m3/hour: 400;
5. The nearest federal highway: M-4, adjacent to the SEZ.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Lipetsk Oblast

The total cost of the project

$114M

Construction of warehouse complexes for the storage of dry materials (ID 6.19)

NPV
IRR
РВР
$1M 37,2% 62 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of warehouses. This project involves the construction of warehouses for the storage of cement and finished products of other dry building mixtures. The project offers rooms that meet the requirements for humidity, temperature of storage of mixtures.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 1 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$1M

Place of implementation

Kaluga Oblast

The total cost of the project

$1M

Construction of new transfer hubs (ID 10.8)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The area of ​​most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.

The construction of technological zones of TPU will be carried out by the investor with subsequent transfer to the city. For TPU projects with separated technological and commercial facilities, the construction of the technological part will be financed from funds received from the sale of development rights to commercial real estate.

26 TPU projects were raffled off. As part of the implementation of these TPU projects, investors will build about 2.0 million square meters. m of total area of ​​real estate objects. The projected volume of private investment may amount to about 160.0 billion rubles.

Project implementation stage

Proposal

The need for additional funding

$9B

Place of implementation

Moscow

The total cost of the project

$9B

Fruit storage construction (ID 17.6)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a modern fruit storage facility for fruit storage

Infrastructure support:

1. Power: 8 MW;
2. Water: 6 m3/h;
3. Sewage: 6 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-2, Crimea.

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Tula Oblast

The total cost of the project

$5M

Construction of a distribution center (ID 17.10)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Organization of industrial real estate objects on the territory of the Tula region (distribution center, production and logistics complex, container hub).

Infrastructure support:

1. Power, MW 12:
2. Water, m3/hour:20 ;
3. Sewage, m3/hour: 20 ;
4. Gas, m3/hour: 15 ;
5. The nearest federal highway: M-4, Don.

Project implementation stage

Proposal

The need for additional funding

$40M

Place of implementation

Tula Oblast

The total cost of the project

$40M

Creation of an industrial aquaculture cluster (ID 11.24)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky district

Infrastructure support:

1. The nearest federal highway: A-107 (17 km), A-113 (17 km)

Project implementation stage

Proposal

The need for additional funding

$61M

Place of implementation

Moscow Oblast

The total cost of the project

$61M

Construction of a goat farm (ID 11.26)

NPV
IRR
РВР
- - 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a goat farm with 6,400 milking goats in Shchelkovo district
Main consumers are milk processing plants in Moscow and the Moscow Oblast (~4 million tonnes/year).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$13,5M

Place of implementation

Moscow Oblast

The total cost of the project

$13,5M

Construction of a plant protection center (ID 11.29)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Market launch of competitive, highly effective products

Field trials of new preparations, evaluation of active ingredients' efficiency, including biological, ecological, and chemical crop protection agents, and new preparative forms

Kashir district

Infrastructure support:

1. Power: 0,15 MW;
2. Water: 2 m3/h;
3. Sewage: 2 m3/h;
4. Gas: 0,3 m3/h;
5. The nearest federal highway: M-4 (6 km), M-6 (6,2 km)

Project implementation stage

Proposal

The need for additional funding

$9M

Place of implementation

Moscow Oblast

The total cost of the project

$9M

Establishment of an advanced milk processing production facility (ID 11.30)

NPV
IRR
РВР
- 19,5% 120 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.

Infrastructure support:

1. Power: MW: 380/220 W is needed;
2. Water: m3/h: hot water - 0,5 and cold water - 9;
3. Sewage: 9,5 m3/h;
4. The nearest federal highway: A-108, A-107, A-104, P-113.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$6,4M

Place of implementation

Moscow Oblast

The total cost of the project

$6,4M

Construction of a robotised dairy farm (ID 6.26)

NPV
IRR
РВР
$0,12M 16,04% 96 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a robotised dairy farm
The Robotised Dairy Farm will utilise the high genetic potential of cattle to ensure a high level of productivity, the safety of breeding stock, and effective disease prevention.

Infrastructure support:

A milking module with free range will be used. A shelter with straw bedding will be built to house the animals. The calves will be housed in special barns.

Implementation period

11 months

Project implementation stage

Proposal

The need for additional funding

$2,5M

Place of implementation

Kaluga Oblast

The total cost of the project

$2,5M

Construction of a cattle farm (ID 6.27)

NPV
IRR
РВР
$200K 16,95% 88 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a cattle farm

The main area of specialisation in agricultural production is meat stockbreeding. The project uses cow-calf technology. The daily weight gain is 1–1.2 kg. The fattening period is 6–8 months. The sale weight of calves is 250-280 kg.

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$400K

Place of implementation

Kaluga Oblast

The total cost of the project

$400K

Construction of a food processing plant (ID 6.18)

NPV
IRR
РВР
$220K 24% 68 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of food products, a milk processing plant

The project will produce dairy food products. The main products are milk, cheese, cottage cheese, yogurt, butter, and sour cream.

Infrastructure support:

1. Power: available;
2. Water: available;
3. Sewage: available;
4. Gas: available;
5. The nearest federal highway: M-3 (40 km)

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$1,3M

Place of implementation

Kaluga Oblast

The total cost of the project

$1,3M

Creation of a complex for the production of cow and buffalo milk (ID 11.19)

NPV
IRR
РВР
$21M 5,4% 156 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$66,2M

Place of implementation

Moscow Oblast

The total cost of the project

$66,2M

Creation of a rabbit breeding farm (ID 2.1)

NPV
IRR
РВР
$4M 10,3% 60 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of a working rabbit farm with 18 fattening and rearing houses with a capacity of 1,430 females. 

Infrastructure support:

1. Power: connection point at a distance of 100 m;
2. Water: connection point at a distance of 100 m;
3. Gas: connection point at a distance of 100 m.

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$17M

Place of implementation

Bryansk Oblast

The total cost of the project

$17M

Construction of a duck meat production and processing plant (ID 4.32)

NPV
IRR
РВР
$16,08M 17% 30 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a duck production complex

Infrastructure support:

1. Power: 3,09MW;
2. Water: 1 000 m3/h;
3. The nearest federal highway: M-4 "Don", R-22 "Caspiy" - 110 km: the nearest highway: R-193 "Voronezh - Tambov" ( 3.8 km )

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$20,3M

Place of implementation

Voronezh Oblast

The total cost of the project

$20,3M

Establishment of a gas processing facility (ID 4.5)

NPV
IRR
РВР
- - 10 years

Objective of the project

Creation of a new production

Brief description and idea

Methanol production

Infrastructure support:

1. Gas, MW: 12.14 MVA;
2. Water, m3/hour: 1 thousand cubic meters per day;
3. The nearest federal highway: P194 "Voronezh-Ostrogozhsk-Rossosh-Kantemirovka" at a distance of 2.1 km.

Project implementation stage

Proposal

The need for additional funding

$1B

Place of implementation

Voronezh Oblast

The total cost of the project

$1B

Construction of a polymer processing plant (ID 6.4)

NPV
IRR
РВР
$2M 21% 54 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of plastic products.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 17 km.

Implementation period

5 months

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Kaluga Oblast

The total cost of the project

$10M

Construction of a polymer processing plant (ID 6.5)

NPV
IRR
РВР
$7M 19% 73 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a polymer processing plant.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 900 m.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$6M

Place of implementation

Kaluga Oblast

The total cost of the project

$6M

Construction of a polymer processing plant (ID 6.6)

NPV
IRR
РВР
$648K 22% 75 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of woven packaging (raffia).

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.4 km.

Implementation period

14 months

Project implementation stage

Proposal

The need for additional funding

$1M

Place of implementation

Kaluga Oblast

The total cost of the project

$1M

Construction of a polymer processing plant (ID 6.7)

NPV
IRR
РВР
$21M 19% 80 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a polymer processing plant.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 900 m.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$20M

Place of implementation

Kaluga Oblast

The total cost of the project

$20M

Construction of a polymer processing plant (ID 6.8)

NPV
IRR
РВР
$2M 19% 85 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of polymer fibers.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 17 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Construction of a polymer processing plant (ID 6.10)

NPV
IRR
РВР
$18M 19% 90 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the construction of a plant for the production of BOPP membraine liner.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.7 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$16M

Place of implementation

Kaluga Oblast

The total cost of the project

$16M

Construction of a polymer processing plant (ID 6.11)

NPV
IRR
РВР
$2M 19% 83 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a plant for the production of polyethylene film.

Infrastructure support:

1. Power, MW: provided in the required volumes;
2. Water, m3/hour: provided in the required volumes;
3. Sewage, m3/hour: provided in the required volumes;
4. Gas, m3/hour: provided in the required volumes;
5. The nearest federal highway: M-3, 2.4 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Organization of production of synthetic resins (ID 5.6)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Establishment of an enterprise for the production of synthetic resins.

Infrastructure support:

1. Power, MW: 20;
2. Water, m3/hour: 60;
3. Gas, m3/hour: 32 Gcal/hour;
4. The presence of a railway line;
5. The nearest federal highway: M-7 (100 km).

Implementation period

7 years

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Ivanov Oblast

The total cost of the project

$10M

Organisation of agricultural production and industrial processing of agricultural produce (ID 18.13)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The company is focused on the production and sale of the following main products:
- beef, veal and pork meat;
- semi-finished beef, veal, and pork products;
- processed meat products;
- sausages and deli meats;
- milk;
- dairy products.

Infrastructure support:

1. Power: MW; agreed supply, capacity to be determined by the project;
2. Water: m3/h; agreed supply, capacity to be determined by the project;
3. Sewage: m3/h; agreed supply, capacity to be determined by the project;
4. Gas: m3/h; agreed supply, capacity to be determined by the project;
5. The nearest federal highway: M-8 (8 km)

Project implementation stage

Proposal

The need for additional funding

$49M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$49M

Dairy farming and milk production (single-cycle farm-complex) (ID 16.3)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Investment project for the construction of three dairy complexes (farms) with a total herd size of up to 10,000 cows, as well as a milk processing plant

Sources of capital investment: own and borrowed funds raised by the company

Creation of at least 600 employment positions, including about 360 at all farms and 240 at the dairy processing plant

Implementation period

40 months

Project implementation stage

Proposal

The need for additional funding

$162,2M

Place of implementation

Tver Oblast

The total cost of the project

$162,2M

Construction of a dairy farm (ID 17.14)

NPV
IRR
РВР
- - 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a dairy farm

Infrastructure support:

1. Power: 8 MW;
2. Water: 9 m3/h;
3. Sewage: 9 m3/h;
4. Gas: 6 m3/h;
5. The nearest federal highway: M-4 "Don", M-2 "Crimea Highway".

Project implementation stage

Proposal

The need for additional funding

$27M

Place of implementation

Tula Oblast

The total cost of the project

$27M

Construction of a plant for advanced processing of coarse grains for the production of amino acids (ID 17.15)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Project for the construction of a plant for the deep processing of coarse grains to produce amino acids and other functional additives for the agricultural and food industries

Infrastructure support:

1. Power: 9 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$39,2M

Place of implementation

Tula Oblast

The total cost of the project

$39,2M

Construction of an acetic acid plant (ID 17.20)

NPV
IRR
РВР
- - 96 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of acetic acid by fermentation and chemical processing of products from destructive distillation of wood

Infrastructure support:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. The railway line: available;
6. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$40,5M

Place of implementation

Tula Oblast

The total cost of the project

$40,5M

Creation of a cattle farm (ID 17.22)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project aims to increase the production of livestock products (milk and meat) through the construction of closed-type farms with year-round stabling of cattle.

Infrastructure support:

1. Power: 9 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Tula Oblast

The total cost of the project

$7M

Construction of an extraction plant for processing soybean and rapeseed (ID 17.23)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of an extraction complex for processing soybean and rapeseed

Infrastructure support:

1. Power: 14 MW;
2. Water: 15 m3/h;
3. Sewage: 15 m3/h;
4. Gas: 9 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$54M

Place of implementation

Tula Oblast

The total cost of the project

$54M

Production of evaporated salt (ID 17.24)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Evaporated salt production project with a capacity of 150,000 tonnes per year

Infrastructure support:

1. Power: 12 MW;
2. Water: 18 m3/h;
3. Sewage: 18 m3/h;
4. Gas: 13 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$19M

Place of implementation

Tula Oblast

The total cost of the project

$19M

Construction of a line elevator with grain cleaning and drying equipment (ID 17.29)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The project is aimed at building a modern linear elevator with a storage capacity of 100,000 tonnes, including grain cleaning and drying equipment. The maximum investment amount is $4.05 million. The project is expected to create 45 employment placements.

Infrastructure support:

1. Power: 10 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$4M

Place of implementation

Tula Oblast

The total cost of the project

$4M

Construction of a sugar beet processing plant (ID 17.34)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a sugar beet processing complex

Infrastructure support:

1. Power: 8 MW;
2. Water: 11 m3/h;
3. Sewage: 11 m3/h;
4. Gas: 7 m3/h;
5. The nearest federal highway: M-4 "Don".

Project implementation stage

Proposal

The need for additional funding

$11M

Place of implementation

Tula Oblast

The total cost of the project

$11M

Construction of a horticultural processing plant (ID 17.40)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a horticultural processing complex.

Infrastructure support:

1. Power: 2 MW;
2. Water: 9 m3/h;
3. Sewage: 9 m3/h;
4. Gas: 2 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway".

Project implementation stage

Proposal

The need for additional funding

$55,4M

Place of implementation

Tula Oblast

The total cost of the project

$55,4M

Construction of a congress and exhibition complex (ID 11.38)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilities

Infrastructure support:

1. Power: 32,93 MW required;
2. Water: m3/h: 1,553 m3/day required;
3. Sewage: m3/h: 1467 m3/day required;
4. Gas m3/h: 15500 m3/h required;
5. The railway line: "Krasnogorsk-Khimki-Sheremetyevo" LRT projected station is planned;
6. The nearest federal highway: access to the M11, International Route is planned.

Project implementation stage

Proposal

The need for additional funding

$676M

Place of implementation

Moscow Oblast

The total cost of the project

$676M

Organization of production of products based on surfactants (ID 5.5)

NPV
IRR
РВР
- 4% 36 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the manufactoring of products based on surfactants is being created. The main products are detergents and cleaning products, laundry and toilet soap, personal hygiene products.

Infrastructure support:

1. Power: 20 MW;
2. Water: 60 m3/h;
3. Gas 35 Gcal/hour;
4. Inventory of branch railway line;
5. The nearest federal highway M-7 (100 km):

Implementation period

16 months

Project implementation stage

Proposal

The need for additional funding

$6M

Place of implementation

Ivanov Oblast

The total cost of the project

$6M

Construction of a plant for the production of carbamide (ID 17.12)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

The production of urea (urea) is a chemical compound, carbonic acid diamide. White crystals, soluble in polar solvents (water, ethanol, liquid ammonia).

Infrastructure support:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-2 Crimea:

Project implementation stage

Proposal

The need for additional funding

$270M

Place of implementation

Tula Oblast

The total cost of the project

$270M

Establishment of a plant for the production of components for composite materials (ID 17.30)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of small-tonnage chemical production of components for high-tech polymer composite materials. Production of phthalonitriles. Binders based on phthalonitrile resins.

Infrastructure support:

1. Power: 100 MW;
2. Water: 1000 m3/h;
3. Sewage:7000 m3/h;
4. Gas: 100 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-4 Don (1 km):

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Tula Oblast

The total cost of the project

$2M

Establishment of production of plastic products (ID 17.33)

NPV
IRR
РВР
- - 48 months

Objective of the project

Creation of a new production

Brief description and idea

Plant for the production of plastics using natural or synthetic polymers.

Infrastructure support:

1. Power: 50 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway M-2, Crimea:

Project implementation stage

Proposal

The need for additional funding

$20M

Place of implementation

Tula Oblast

The total cost of the project

$20M

Construction of a plant for the production of monoethylene glycol (ID 17.37)

NPV
IRR
РВР
- - 36 months

Objective of the project

Creation of a new production

Brief description and idea

Production of monoethylene glycol MEG-300

Infrastructure support:

1. Power: 30 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. Inventory of branch railway line;
6. The nearest federal highway: N4 "Don".

Project implementation stage

Proposal

The need for additional funding

$381M

Place of implementation

Tula Oblast

The total cost of the project

$381M

Construction of the “Space City” theme park (ID 6.24)

NPV
IRR
РВР
$170K 24,3% 61 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a theme park on a 17,000 sq m land area. Estimated number of visits - 200 people/day.

Infrastructure support:

The area of the water park is 3000-5000 sq m

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$12M

Place of implementation

Kaluga Oblast

The total cost of the project

$12M

Voronezh Heat SupplyNuclear Power Plant area development (ID 4.3)

NPV
IRR
РВР
- - 3,5 years

Objective of the project

Creation of a new production

Brief description and idea

Creation of a modern multifunctional entertainment and business center on the basis of the buildings of the frozen Voronezh Heat Supply Nuclear Power Plant.

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Voronezh Oblast

The total cost of the project

$3M

Construction of a methanol plant (ID 17.39)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a methanol plant

Infrastructure support:

1. Power: 60 MW;
2. Water: 100 m3/h;
3. Sewage: 100 m3/h;
4. Gas: 450 m3/h;
5. The nearest federal highway: M-2 "Crimea" M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$252M

Place of implementation

Tula Oblast

The total cost of the project

$252M

Construction of congress and exhibition, hotel, trade and entertainment infrastructure facilities (ID 11.2)

NPV
IRR
РВР
- - 5 years

Objective of the project

Creation of a new production

Brief description and idea

The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure. 

Infrastructure support:

1. The nearest federal highway: M-4 "Don Highway", A-105, A-107, M-2

Project implementation stage

Proposal

The need for additional funding

$5,1B

Place of implementation

Moscow Oblast

The total cost of the project

$5,1B

Creation of a water health-resort SPA complex (ID 4.26)

NPV
IRR
РВР
- - 3,5 years

Objective of the project

Creation of a new production

Brief description and idea

The implementation of the water health-resort SPA complex project will increase the load on the existing facilities of the hospitality industry; new sites of tourist interest will be created, localized in one area in proximity to the urban agglomeration, the international airport, and the M-4 "Don" highway.

Project implementation stage

Proposal

The need for additional funding

$135M

Place of implementation

Voronezh Oblast

The total cost of the project

$135M

Creation of a multifunctional hotel complex (ID 17.2)

NPV
IRR
РВР
- -

Objective of the project

7,2 years

Brief description and idea

The creation of a multifunctional five-star hotel complex.

The complex will include a hotel, a restaurant, a bar with roof access, a fitness club, a high-class spa center, bank offices, parking lots.

Project implementation stage

Proposal

The need for additional funding

$20,3M

Place of implementation

Tula Oblast

The total cost of the project

$20,3M

Creation of a zoo-based biopark (ID 18.1)

NPV
IRR
РВР
$160K 24,48% 96 months

Objective of the project

Creation of a new production

Brief description and idea

BIOPARK YAROSLAVL is a new stage in the development of the Yaroslavl Zoo. The project aims to create Russia's largest biopark.

Infrastructure support:

1. Power: 0,53 MW;
2. Water: 87 m3/h;
3. Sewage: 87 m3/h;
4. The nearest federal highway: M-8 (0,5 km).

Implementation period

96 months

Project implementation stage

Proposal

The need for additional funding

$170,2M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$170,2M

Creation of an “Adventure Hotel” project (ID 18.4)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The "Adventure Hotel" project concept is to create a hotel in the building of a prison castle using best global practices. Guests of the hotel will be both Russian and foreign tourists.

The prison castle is located in Danilov (325 km from the MKAD highway).
- Yaroslavl - 70 km,
- Moscow - 350 km,
- St. Petersburg - 730 km,
- Vologda - 120 km.    

Infrastructure support:

1. Power: 380 MW;
2. The railway line: available;
3. The nearest federal highway: 3,1 km.

Project implementation stage

Proposal

The need for additional funding

$1,2M

Place of implementation

Yaroslavl oblast

The total cost of the project

$1,2M

Factory territory renovation project (ID 18.9)

NPV
IRR
РВР
$107,5M 28% 60-120 months

Objective of the project

Creation of a new production

Brief description and idea

Comprehensive development of the area This includes the development of infrastructure, landscaping of the area, demolition of dissonant objects, restoration of architectural heritage, the construction of new residential neighborhoods, the creation of a technopark, a craft, and cultural center, and a modern gastronomic center.

Infrastructure support:

1. Power: MW, 5000 kW/h;
2. Water: 170 m3/h;
3. Heating 3,123 Gcal/hour;
4. Gas: m3/h, available;
5. The railway line: available;
6. The nearest federal highway: М-8 (1500 m).

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$101,3M

Place of implementation

Yaroslavl oblast

The total cost of the project

$101,3M

Recreational theme park (ID 11.27)

NPV
IRR
РВР
- - 144 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".

Infrastructure support:

1. Power: MW, at the border;
2. Water: m3/h, at the border;
3. Sewage: m3/h, at the border;
4. Gas: m3/h, at the border;
5. The railway line: Shmatovo railway station (1.6 km);
6. The nearest federal highway: M-4 "Don" (15.1 km).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$92M

Place of implementation

Moscow Oblast

The total cost of the project

$11M

Construction of a hotel in a ski complex (ID 11.31)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.

Infrastructure support:

1. Power: MW; 10 kV own independent transmission line, provides full power supply to the resort;
2. Water: m3/hour; 560 m3/day own water intake for domestic drinking water supply;
3. Sewage: m3/h; 200 m3/day own treatment facilities for domestic wastewater;
4. Gas: 1,08 m3/h;
5. The nearest federal highway: 45.0 km away from MKAD (The Moscow Automobile Ring Road), and 7.0 km away from the "Moscow-Dubna" highway.

Project implementation stage

Proposal

The need for additional funding

$5M

Place of implementation

Moscow Oblast

The total cost of the project

$5M

Manor restoration with adaptations to the chosen function of the site (ID 11.36)

NPV
IRR
РВР
-

Brief description and idea

Restoration of a cultural heritage site with adaptation to the chosen function of the site.

Infrastructure support:

1. Power: available;
2. The nearest federal highway: M-5 "Ural Highway"(6 km)

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Creation of an all-season multifunctional, eco-educational, and recreational tourist complex (ID 11.39)

NPV
IRR
РВР
$13M 56% 44,3 months

Objective of the project

Creation of a new production

Brief description and idea

A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:
-five-star "Zoo-Safari" style hotel with panoramic glazing;
-a glass multi-hall restaurant;
- "Zoo Water Park" with a fitness and spa center in a glass building with a similar congress center;
- "The International Children's Academy of Ecology and Zoology"
- and other infrastructure facilities of the modern tourism industry
"The International Children's Academy of Ecology and Zoology, located near Moscow Safari Park, will contribute to the ecological and patriotic education of the youth.

Implementation period

27 months

Project implementation stage

Proposal

The need for additional funding

$16,4M

Place of implementation

Moscow Oblast, Chekhov district, Meshcherskoye area

The total cost of the project

$16,4M

Preservation project for a cultural heritage object (ID 6.22)

NPV
IRR
РВР
$1,2M 25,35% 82 months

Objective of the project

Creation of a new production

Brief description and idea

The purpose of the project is the reconstruction of the manor into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region and the proximity of the Moscow Oblast, the expected number of visitors is at least 20,000 people per year.

Infrastructure support:

1. Power: available;
2. Water: available;
3. Sewage: available;
4. Gas: available;
5. The nearest federal highway: A-108 highway

Implementation period

33 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Construction of a tourism and hotel complex (ID 6.23)

NPV
IRR
РВР
$0,3M 21,45% 98 months

Objective of the project

Creation of a new production

Brief description and idea

Renovation of the manor
The complex will be used to accommodate the staff of the existing residents of the "Vorsino" Industrial Park and the special economic zone of industrial and production type "Kaluga" Borovskaya site, as well as to promote tourism in the region.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M

Construction of a plant for the production of composite cylinders (ID 17.41)

NPV
IRR
РВР
- - 54 months

Objective of the project

Creation of a new production

Brief description and idea

Establishment of the production of high-pressure composite cylinders.

Infrastructure support:

1. Power, MW: 100,
2. Water: m3/hour: 1000;
3. Sewage: m3/hour: 7000;
4. Gas: m3/hour: 1000;
5. Inventory of branch railway line
6. The nearest federal highway: M-4 Don (1 km)

Project implementation stage

Proposal

The need for additional funding

$41M

Place of implementation

Tula Oblast

The total cost of the project

$41M

Complex for the production of nitric acid and ammonium nitrate (ID 17.43)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a complex for the production of nitric acid with a capacity of 270 thousand tons per year and ammonium nitrate with a capacity of 340 thousand tons per year.

Infrastructure support:

1. Power, MW: 20,
2. Water: m3/hour: 100;
3. Sewage: m3/hour: 100;
4. Gas: m3/hour: 450;
5. Inventory of branch railway line
6. The nearest federal highway: M-2 Crimea

Project implementation stage

Proposal

The need for additional funding

$93M

Place of implementation

Tula Oblast

The total cost of the project

$93M

Creation of a complex for the production of ammonia and carbamide (ID 17.44)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of an ammonia production complex with a capacity of 525 thousand tons per year and carbamide with an output of 700 thousand tons per year.

Infrastructure support:

1. Power, MW: 15,
2. Water: m3/hour: 100;
3. Sewage: m3/hour: 100;
4. Gas: m3/hour: 450;
5. Inventory of branch railway line
6. The nearest federal highway: M-2 Crimea

Project implementation stage

Proposal

The need for additional funding

$551M

Place of implementation

Tula Oblast

The total cost of the project

$551M

Creation of a year-round “car camping” area (ID 17.13)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms. The concept of the project aims to preserve the area and, at the same time, create a comfortable setting for outdoor recreation at all times of the year.

Infrastructure support:

1. Power: 9 MW;
2. Water: 17 m3/h;
3. Sewage: 17 m3/h;
4. Gas: 11 m3/h;
5. The nearest federal highway: M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$13,5M

Place of implementation

Tula Oblast

The total cost of the project

$23M

Construction of a complex for the production of ammonia and carbamide (ID 17.45)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The complex of ammonia and carbamide AMKAR-1400, manufacturing productivity estimates 3000 tons of ammonia and 4200 tons of carbamide per day. The project is directed at increasing the export capacity of Tula Oblast, production release with higher added value cost.

Infrastructure support:

1. Power, MW: 25;
2. Water: m3/hour: 80;
3. Sewage: m3/hour: 80;
4. Gas: m3/hour: 340;
5. The nearest federal highway: M-4 Don.

Project implementation stage

Proposal

The need for additional funding

$847M

Place of implementation

Tula Oblast

The total cost of the project

$847M

Creation of a “car camping” area (ID 17.21)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms.

Infrastructure support:

1. Power: 6 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$5,4M

Place of implementation

Tula Oblast

The total cost of the project

$12,1M

Reconstruction of a health resort complex (ID 17.27)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

The reconstruction of the health resort complex Sanatorium "Krainka" involves the modernisation of infrastructure, improvement of accommodation facilities, improvement of the adjoining territory, and an increase of the number of available accommodation places.

Infrastructure support:

1. Power: 8 MW;
2. Water: 10 m3/h;
3. Sewage: 10 m3/h;
4. Gas: 5 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway"

Project implementation stage

Proposal

The need for additional funding

$13,5M

Place of implementation

Tula Oblast

The total cost of the project

$13,5M

Construction of a chain hotel (ID 17.32)

NPV
IRR
РВР
- - 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a 150-bed 2 or 3-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".

Infrastructure support:

1. Power: 3 MW;
2. Water: 2 m3/h;
3. Sewage: 2 m3/h;
4. Gas: 4 m3/h;
5. The nearest federal highway: M-2 "Crimea Highway", M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$8,1M

Place of implementation

Tula Oblast

The total cost of the project

$8,1M

Construction of an international chain hotel (ID 17.38)

NPV
IRR
РВР
- - 72 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a 750-bed 5-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".

Infrastructure support:

1. Power: 6 MW;
2. Water: 8 m3/h;
3. Sewage: 8 m3/h;
4. Gas: 9 m3/h;
5. The nearest federal highway: M-4 "Don"

Project implementation stage

Proposal

The need for additional funding

$40,5M

Place of implementation

Tula Oblast

The total cost of the project

$40,5M

Children’s recreation center (ID 6.20)

NPV
IRR
РВР
$912K 15% 76 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of infrastructure for food, accommodation and active recreation with a year-round stay.

Infrastructure support:

1. The nearest federal highway: M-3, 7 km.

Implementation period

16 months

Project implementation stage

Proposal

The need for additional funding

$1,3M

Place of implementation

Kaluga Oblast

The total cost of the project

$1,3M

Bioengineering Center construction (ID 18.3)

NPV
IRR
РВР
$27M 44% 64 months

Objective of the project

Creation of a new production

Brief description and idea

The purpose of the project is to organize activities in the field of growing planting material (miscanthus) and the production of ecological disposable tableware.

Infrastructure support:

1. Power: 12 MW;
2. Water: 20 m3/h;
3. Sewage: 20 m3/h;
4. Gas: 5000 m3/h;
5. The nearest federal highway: M-8, 24 km.

Implementation period

21 months

Project implementation stage

Proposal

The need for additional funding

$30M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$30M

Amusement park (ID 11.11)

NPV
IRR
РВР
$85M 23% 101 months

Objective of the project

Creation of a new production

Brief description and idea

The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.

Infrastructure support:

1. Water: 10401 m3/h;
2. Sewage: 10401 m3/h;
3. Gas: 1214000 m3/h;
4. The nearest federal highway: Dmitrovskoe highway, 17 km from Moscow Ring Road.

Project implementation stage

Proposal

The need for additional funding

$149M

Place of implementation

Moscow Oblast

The total cost of the project

$149M

Mansion reconstruction (ID 6.21)

NPV
IRR
РВР
$2,3M 28,35% 76 months

Objective of the project

Creation of a new production

Brief description and idea

The purpose of the project is the reconstruction of the mansion into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region, the expected number of visitors is at least 10,000 people per year.

Infrastructure support:

1. Power: available;
2. Water: available;
3. Sewage: available;
4. Gas: available;
5. The nearest federal highway: M-3, 11 km.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$1,3M

Place of implementation

Kaluga Oblast

The total cost of the project

$1,3M

Organization of geotextiles production (ID 5.8)

NPV
IRR
РВР
$4,4M 18% 60 months

Objective of the project

Creation of a new production

Brief description and idea

An enterprise for the production of geotextiles.

Infrastructure support:

1. Power: 8 MW;
2. Water: 550 m3/h;
3. Sewage: 160 m3/h;
4. Gas: 40000 m3/h;
5. Railway: on request;
6. The nearest federal highway: M-7, 100 km.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$32M

Place of implementation

Ivanovo Oblast

The total cost of the project

$32M

Production of sanitary ware products from ceramic masses (ID 6.29)

NPV
IRR
РВР
$3,4M 20,15% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a factory for the production of sanitary ware products from raw materials extracted in the Ulyanovsk region. The main products are sanitary ware made of ceramic masses.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$30M

Place of implementation

Kaluga Oblast

The total cost of the project

$30M

Production of injectable forms of medicines (ID 1.6)

NPV
IRR
РВР
$10M 33,8% 60 months

Objective of the project

Creation of a new production

Brief description and idea

The main purpose of the project is the modern production of pharmaceutical substances. The company should ensure uninterrupted production of a wide range of high-quality pharmaceutical products to meet the needs of all groups of the region's population in medicines at affordable prices, reduce Russia's dependence on imports of medicines and raw materials for their production.

Project implementation stage

Proposal

The need for additional funding

$11M

Place of implementation

Belgorod Oblast

The total cost of the project

$11M

Factory for the production of dosage forms (ID 6.16)

NPV
IRR
РВР
$8M 53% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a factory for the production of finished dosage forms. The number of jobs created is 225.

Infrastructure support:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3 (6 km), A-108 (4 km).

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$38M

Place of implementation

Kaluga Oblast

The total cost of the project

$38M

Mini excavators production (ID 5.4)

NPV
IRR
РВР
$1,7M 21% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an enterprise for the mini excavator's production.

Infrastructure support:

1. Power: 10 MW;
2. Water: 35 m3/h;
3. The nearest federal highway: M-7, 100 km.

Implementation period

4 months

Project implementation stage

Proposal

The need for additional funding

$1,6M

Place of implementation

Ivanovo Oblast

The total cost of the project

$1,6M

Construction of a factory for the automotive components production (ID 6.1)

NPV
IRR
РВР
$77M 53% 60 months

Objective of the project

Creation of a new production

Brief description and idea

The project provides for the construction of a factory for the production of automotive components for Volkswagen, Skoda, Volvo, Renault, Mitsubishi car brands.

Infrastructure support:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 6 km.

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$18M

Place of implementation

Kaluga Oblast

The total cost of the project

$18M

Construction of a woodworking factory (ID 16.1)

NPV
IRR
РВР
- - -

Objective of the project

Creation of a new production

Brief description and idea

Creation and development of a modern timber industry enterprise - a woodworking factory. The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging transport.

Project implementation stage

Proposal

The need for additional funding

$9,4M

Place of implementation

Tver Oblast

The total cost of the project

$9,4M

Production of MDF boards (ID 7.1)

NPV
IRR
РВР
$17M 33,6% 57,6 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.

Infrastructure support:

1. Power: 250 MW and 4,934 MW;
2. Water: up to 20 m3/h, the possibility of artesian wells construction;
3. Sewage: construction of local cleaning facilities.

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$33M

Place of implementation

Kostroma Oblast

The total cost of the project

$33M

The program for creating a new production of grinding balls (ID 3.3)

NPV
IRR
РВР
$5,2M 25% 48 months

Objective of the project

Creation of a new production

Brief description and idea

The main goal of the project is to create a new production facility equipped with modern, energy-efficient devices to make a profit through the sale of manufactured products: steel grinding balls with a diameter of 30-100 mm.

Infrastructure support:

1. Power: 13 MW;
2. Water: 71,67 m3/h;
3. Sewage: 71,67 m3/h;
4. Gas: 2000 m3/h;
5. The nearest federal highway: M-7, 0,1 km.

Implementation period

16 months

Project implementation stage

Proposal

The need for additional funding

$14M

Place of implementation

Vladimir Oblast

The total cost of the project

$14M

Construction of a plant for the production of cast iron and steel casting (ID 6.15)

NPV
IRR
РВР
$4,4M 14,48% 120 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of cast iron and steel: plumbing casting (plumbing and accessories), accessories for anchor-rail fastening, artistic casting.

Infrastructure support:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 5,5 km.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$432M

Place of implementation

Kaluga Oblast

The total cost of the project

$432M

Construction of a plant for the production of radio and mobile communications (ID 6.17)

NPV
IRR
РВР
$4,4M 18,71% 84 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a plant for the production of radio and mobile communications.

Infrastructure support:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: M-3, 1,5 km.

Project implementation stage

Proposal

The need for additional funding

$76M

Place of implementation

Kaluga Oblast

The total cost of the project

$76M

Production of goods from mineral casting and UHPC concrete (ID 1.9)

NPV
IRR
РВР
$1M 48,15% 58,8 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of an enterprise for the production of goods from "Mineral casting" and UHPC concrete, for the machine-tool and machine-building industries, as an analog to metal and cast-iron products.

Infrastructure support:

1. Power: 17,46 MW max;
2. Water: 4 artesian wells, capacity - 120 m3/h, possible to increase to 200 m3/h; 2 tanks, capacity - 800 m3/h; 2 pipelines, d = 100 mm, capacity - 360 m3/h;
3. Sewage: pipeline, d = 400 mm, capacity - 520 m3/h, possible to increase the capacity to 5000 m3/d;
4. Gas: capacity - 500 m3/h, possible to increase up to 4000 m3/h;
5. The nearest federal highway: R-185, 3,5 km.

Implementation period

17 months

Project implementation stage

Proposal

The need for additional funding

$2,1M

Place of implementation

Belgorod Oblast

The total cost of the project

$2,1M

Creation and development of the extraction and processing of roughly crushed limestone enterprise (ID 15.2)

NPV
IRR
РВР
$2M 58,2%

Objective of the project

Creation of a new production

Brief description and idea

Creation of an enterprise for the organization of production and processing of dense rocks into crushed stone for road, housing, industrial and civil construction.

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$1,2M

Place of implementation

Tambov Oblast

The total cost of the project

$1,2M

Creation of a meliorative system (ID 1.8)

NPV
IRR
РВР
$1,6M 62% 36 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a modern meliorative system on an area of 220 hectares in order to reduce risks in the production of open-ground vegetable products: in conditions of lacking the moisture during the growing season of vegetable products - the device of circular irrigation machines and drip irrigation; the device of a drainage system on waterlogged areas of floodplain land (lagoons, canals).

Implementation period

10 months

Project implementation stage

Proposal

The need for additional funding

$2,6M

Place of implementation

Belgorod Oblast

The total cost of the project

$2,6M

Construction of a full-cycle mutton processing plant (ID 4.1)

NPV
IRR
РВР
$7M 50% 60 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a production complex for 1000 heads in Voronezh Oblast.

Infrastructure support:

1. Power: 5,01 MW;
2. Gas: 37,5 m3/h;
3. The nearest federal highway: the federal highway R194 "Voronezh - Ostrogozhsk - Rossosh - Kantemirovka" runs at a distance of 2.5 km, the federal highway M-4 "Don" runs at a distance of 34.5 km.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$12M

Place of implementation

Voronezh Oblast

The total cost of the project

$12M

Production of sodium polyacrylate (ID 18.10)

NPV
IRR
РВР
$14M 17% 2,7 months

Objective of the project

Creation of a new production

Brief description and idea

The project is aimed at the production of sodium polyacrylate (sodium salt) for hygiene products.

Infrastructure support:

1. Power: depending on the site;
2. Water: depending on the site;
3. Sewage: depending on the site;
4. Gas: depending on the site;
5. The nearest federal highway: depending on the site.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$31M

Place of implementation

Yaroslavl Oblast

The total cost of the project

$31M

Construction of a polymer processing plant (ID 6.9)

NPV
IRR
РВР
$1,5M 27% 59 months

Objective of the project

Creation of a new production

Brief description and idea

The project is aimed at the construction of a thermoforming plant for products.

Infrastructure support:

1. Power: on request;
2. Water: on request;
3. Sewage: on request;
4. Gas: on request;
5. The nearest federal highway: М-3, 17 km.

Implementation period

11 months

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Kaluga Oblast

The total cost of the project

$2M