About branch
Projects 210
Objective of the project
The development of 124,000 m2 area to create the Pokrovskoye mud resort.Brief description and idea
The development involves the construction of medical rehabilitation centers equipped with modern balneological equipment. Construction of infrastructure for living, entertainment, sports. Tourist routes - walking, cycling, horseback riding. Thematic museums - the museum of the writer Vasily Pavlovich Aksenov, the museum “History of Sapozhkovsky Muds”. The basis of rehabilitation is rare Sapozhkovsky medicinal acidic mud.Infrastructure support:
Full compliance to the needs of the project.Implementation period
60 monthsThe need for additional funding
$2BPlace of implementation
Ryazan oblastThe total cost of the project
$2BObjective of the project
Construction of a greenhouse complexBrief description and idea
Greenhouses allow eliminate a seasonal character of work and grow various cultures all year round. At the same time, the most comfortable conditions are created not only for the growing of crops but also for the working personnel that looks after the plants.Infrastructure support:
1. Power: up to 75 MWProject implementation stage
ProposalThe need for additional funding
$90.48MPlace of implementation
Voronezh OblastThe total cost of the project
$90.48MObjective of the project
Creation of moisture retaining superabsorbent production in Voronezh regionBrief description and idea
To effectively retain large volumes of water and nutritive elements in the soil, special products are used - superabsorbents. Taking into account the trend of climate change, the relevance of applying superabsorbent increases significantly.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$0.44MPlace of implementation
Voronezh OblastThe total cost of the project
$0.44MObjective of the project
Creation of a biocoal plantBrief description and idea
Creation of the production of mobile lines for the processing of illiquid wood of any species, located at the place of formation of this wood, with its further cost-effective processing into the goods in demand on the market.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$2.25MPlace of implementation
Voronezh OblastThe total cost of the project
$2.25MObjective of the project
The goal of the project is construction of a plant for deep processing of grain with the emphasis on the production of food lysine in Voronezh regionBrief description and idea
Agriculture is interested in the development of the industry and the construction of new plants for deep processing of grain. This will allow to reduce the import of lysine and tryptophan, threonine and valine, gluten, glucose, natural sweeteners and bio-products.Infrastructure support:
1. Power: up to 75 MWProject implementation stage
ProposalThe need for additional funding
$270.72MPlace of implementation
Voronezh OblastThe total cost of the project
$270.72MObjective of the project
Production of the prebiotic inulinBrief description and idea
According to the estimates of world analytical agencies, the most promising area for the development of food industry is production of functional food.Infrastructure support:
1. Power: up to 75 MWProject implementation stage
ProposalThe need for additional funding
$19.3MPlace of implementation
Voronezh OblastThe total cost of the project
$19.3MObjective of the project
Construction of a year-round glamping in Voronezh region.Brief description and idea
The year-round recreation center offers guests a comfortable stay away from the city. It is possible to have a calm and quiet rest in coisy and comfortable glampings, as well as an active leisure: bike rides, stand-up boards rides, participation in various events.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$0.91MPlace of implementation
Voronezh OblastThe total cost of the project
$0.91MObjective of the project
Deep processing of natural gas, significant reduction of hydrocarbon raw materials import and strengthening the energу independence of the country.Brief description and idea
A gas processing plant is an industrial enterprise that processes natural or associated gas with the purpose of obtaining petrochemical products with high added value (base polymers, plastics, rubbers, sulfur, helium, dry gas, gasoline, diesel).Infrastructure support:
1. Power: up to 75 MWProject implementation stage
ProposalThe need for additional funding
$3408.89MPlace of implementation
Voronezh OblastThe total cost of the project
$3408.89MObjective of the project
Import substitution and development of the machine tool industry in the Russian Federation.Brief description and idea
The relevance of the project lies in the intention to improve the Russian economy, the growth of which will not occur without the powerful development of the machine tool industry, since this industry is "backbone".Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$23.07MPlace of implementation
Voronezh OblastThe total cost of the project
$23.07MObjective of the project
Development of the seed industry in Voronezh region and enhancing the food security of the region and the country.Brief description and idea
The production of selected seeds allows farmers and large farms to obtain fruit-bearing fields even under the adverse conditions.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$12.45MPlace of implementation
Voronezh OblastThe total cost of the project
$12.45MObjective of the project
Development of the production of canned vegetables and berries in Voronezh region, enhancing the food security in the region.Brief description and idea
Organizaton of production: a line for canning cucumbers and tomatoes, a line for canning cabbage, production line for jams from honeysuckle, black current and apples.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$4.27MPlace of implementation
Voronezh OblastThe total cost of the project
$4.27MObjective of the project
Construction of a compound feed plant in Voronezh region.Brief description and idea
The profitable implementation of this project on the territory of Voronezh region is due to the fact that the region occupies in the Central Federal District: 1st place in milk production, 2nd place on the number of kettle.Infrastructure support:
1. Power: up to 75 MWProject implementation stage
ProposalThe need for additional funding
$13.23MPlace of implementation
Voronezh OblastThe total cost of the project
$13.23MObjective of the project
Development of potato cultivation in Voronezh region, enhancing the food security in the region, creation of a competitive potato farm.Brief description and idea
The implementation of the project assumes planting of proven varieties of potatoes on the traditionally used lands with storage and packing of this crop, as well as its sale. Potatoes are planned to be sold to the potato processing organizations (LLC Domfri, Voronezh region) and retail stores through the regional network.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$1.38MPlace of implementation
Voronezh OblastThe total cost of the project
$1.38MObjective of the project
Construction of an aquapark with the first and nowadays the only sports and entertainment complex with water slides and artificial wave at disposal, with year-round functioning.Brief description and idea
The project is competitive on the market as there are no complexes of this type in the region today and the demand for the services remains unsatisfied. It is assumed that the main visitors to the aquapark will be residents and guests of the city.Infrastructure support:
1. Power: up to 75 MWProject implementation stage
ProposalThe need for additional funding
$32.29MPlace of implementation
Voronezh OblastThe total cost of the project
$32.29MObjective of the project
Construction of a plant for the production of pharmaceutical substances from which medicines are madeBrief description and idea
Currently the share of foreign substancies comprises 80% of the total volume on the Russian market. In the conditions of sanctions pressure from the foreign states many foreign pharmaceutical companies ceased investment activities in our country. Although they did not officially refuse to supply vital drugs and ingredients for them, problems with shipment happened due to the broken logistics chains.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$144.51MPlace of implementation
Voronezh OblastThe total cost of the project
$144.51MObjective of the project
Creation of highly efficient, export-oriented and competitive production of mineral fertilizers in Voronezh regionBrief description and idea
The implementation of this investment proposal is due to the growing demand for nitrogen fertilizers on a global scale as well as to the positive dynamics of price growth for the products of this group. The products planned for output are in demand in all regions of the world associated with the agricultural production.Infrastructure support:
1. Power: up to 75 MWProject implementation stage
ProposalThe need for additional funding
$1.18MPlace of implementation
Voronezh OblastThe total cost of the project
$1.18MObjective of the project
Construction of a plant for the production of glass bottles and jars in Voronezh regionBrief description and idea
The project assumes creation of glass containers intended for manufacturers of alcoholic, non-alcoholic, carbonated and non-carbonated drinks, for food manufacurers producing canned, sour-milk products, and for public consumption.Infrastructure support:
1. Power: up to 5 MWProject implementation stage
ProposalThe need for additional funding
$12.28MPlace of implementation
Voronezh OblastThe total cost of the project
$6.53MObjective of the project
Creation of a new productionBrief description and idea
The project assumes the construction of a greenhouse complex with the area of 5 hectares. The aim of the project is to create the production of greenhouse vegetables (cucumbers, tomatoes) on a mineral substrate in year-round greenhouses with the use of additional illumination system on the territory of Oryol region.Infrastructure support:
1. Power: 5 MWProject implementation stage
ProposalThe need for additional funding
$24MPlace of implementation
Oryol OblastThe total cost of the project
$24MObjective of the project
Creation of a new productionBrief description and idea
Organization of the production of bars made of precision alloys in small batches with a quality exceeding domestic and world analogues in the city of Mtsensk.Infrastructure support:
1. Power: 1.5 MWProject implementation stage
ProposalThe need for additional funding
$0.2MPlace of implementation
Oryol OblastThe total cost of the project
$0.2MObjective of the project
Creation of a new productionBrief description and idea
Сonstruction of a mill grinding 2 types of grain with productivity of 150 tons per dayInfrastructure support:
1. Power: 1.55 MWProject implementation stage
ProposalThe need for additional funding
$5.8MPlace of implementation
Oryol OblastThe total cost of the project
$5.8MObjective of the project
Creation of a new productionBrief description and idea
The object is a building for potatoes storage. Technology of potatoes storage "APH Group" (Netherlands) is based on Omnivent ventilation equipment (Netherlands) and Munters air humidification system (Sweden). All components of the vegetables storage process are compurterized and automated. The APH Group company is a provider of technological equipment and carries out its installation and comissioning works (turnkeys). The maximum one-time volume of stored products is 8,100 tons.Infrastructure support:
1. Power: 0.178 MWProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Oryol OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The project assumes construction of a plant for the production of glass products on the territory of the special economic zone Oryol.Infrastructure support:
1. Power: 4.7 MWProject implementation stage
ProposalThe need for additional funding
$75MPlace of implementation
Oryol OblastThe total cost of the project
$75MObjective of the project
Creation of a new productionBrief description and idea
Construction of a modern factory for the production of vegetable oils (sunflower, soybean, rapeseed).Infrastructure support:
1. Power: 0.85 MWProject implementation stage
ProposalThe need for additional funding
$6.1MPlace of implementation
Oryol OblastThe total cost of the project
$6.1MObjective of the project
Creation of a new productionBrief description and idea
The project assumes construction of a Data centre (Data Processing Centre - DPC). It is created with the purpose of processing and storing of huge amounts of information. The project is implemented taking into account the requirements towards data backup, stability and security of storage and processing of data.Infrastructure support:
1. Power: 1 MWProject implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Oryol OblastThe total cost of the project
$10MObjective of the project
Creation of a new productionBrief description and idea
The project assumes production of consumer electronics and engineering networks. Production line consists of: a line for the production of printed circuit assemblies, a line for washing and varnishing, a selective soldering oven, a vapor-phase oven with a vacuum.Infrastructure support:
1. Power: 5 MWProject implementation stage
ProposalThe need for additional funding
$101.7MPlace of implementation
Oryol OblastThe total cost of the project
$101.7MObjective of the project
Creation of a new productionBrief description and idea
The project assumes creation of block-containers and switchboard equipment production with the highest possible level of factory readiness, with mounted technological equipment and engineering systems.Infrastructure support:
1. Power: 5 MWProject implementation stage
ProposalThe need for additional funding
$0.25MPlace of implementation
Oryol OblastThe total cost of the project
$0.25MObjective of the project
ModernizationBrief description and idea
The project assumes reconstruction of the Hotel Intourist-Yelets:Infrastructure support:
1. Power: 0.15 MWProject implementation stage
ProposalThe need for additional funding
$13.3MPlace of implementation
Lipetsk OblastThe total cost of the project
$13.3MObjective of the project
Creation of a new productionBrief description and idea
Creation of an agro-industrial complex for the production of goat milk and dairy products in Lipetsk regionInfrastructure support:
1. Power: 0.4 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$5.8MPlace of implementation
Lipetsk OblastThe total cost of the project
$5.8MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of vegetable and fruit chips with a production capacity of 40 tons per yearInfrastructure support:
1. Power, MW: source 1 - substation 35/10 kW "Kochetovka", power supply using a temporary scheme - 630 kW, ТУ №5-199/20284964 from 19.12.2013.Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$1.7MPlace of implementation
Belgorod OblastThe total cost of the project
$1.7MObjective of the project
Creation of a new productionBrief description and idea
The project assumes construction of a complex for the production of ready-made frozen pasta with a maximum production capacity of 1,200 tons per month in the village Belovskoe in Belgorod region. Planned commissioning date is March, 2023. Creation of 29 working places with an average salary of 33,4 thousand rubles. Manufacture is planned to be located on the territory of land plot with the cadastral number 31:15:0904001:3793, address: Belgorod region, village Belovskoe, Magistralnaya street, № 16в. In the production of pasta only natural, environmentally friendly ingredients will be used - flour, eggs, spices and water. There is no need to use any preservatives, flavourings and colorants - the production and storage technology allows to save mineral-vitamin complex for 2 years.Infrastructure support:
1. Power, MW: 1 MWImplementation period
14 monthsProject implementation stage
ProposalThe need for additional funding
$13.9MPlace of implementation
Belgorod OblastThe total cost of the project
$13.9MObjective of the project
Creation of a new productionBrief description and idea
Creation and development of a modern textile enterprise. The project assumes construction of a knitwear factory, purchase of equipment.Project implementation stage
ProposalThe need for additional funding
$266.7MPlace of implementation
Tver OblastThe total cost of the project
$266.7MObjective of the project
Creation of a new productionBrief description and idea
Construction of a modern highly efficient dairy complex with automated processes of manufacture management, with a full processing cycle starting from receiving of raw milk to the shipment of finished product, corresponding to all requirements of technical regulations of the Customs Union, current technological regulatory legal acts, State Standards, Sanitary-epidemiological rules and norms, food and dairy product safety programs and sanitary requirements for the design of dairy industry enterprises.Project implementation stage
ProposalThe need for additional funding
$35MPlace of implementation
Ivanovo OblastThe total cost of the project
$35MObjective of the project
Creation of a new productionBrief description and idea
Creation of modern production of microcalcite from calcium carbonate for the needs of enterprises of Russian Federation engaged in the production of plastics, polymers, paints and varnishes, linoleum, cable plastic, rubber products, sealants and drilling fluidsInfrastructure support:
1. Power: 3.86 MWProject implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Smolensk OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Production of endoprostheses of the knee and hip joints with the potential of 30-40% of imported goods substitutionInfrastructure support:
1. Power: 3.86 MWImplementation period
20 monthsProject implementation stage
ProposalThe need for additional funding
$28.3MPlace of implementation
Smolensk OblastThe total cost of the project
$28.3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a transport and logistics complex for 3,000-4,000 vehicles with arrangement of parking and storage places for transport, construction of warehouses and of a training and educational complex for employeesInfrastructure support:
1. Power: 4.54 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$21.7MPlace of implementation
Smolensk OblastThe total cost of the project
$21.7MObjective of the project
Creation of a new productionBrief description and idea
Organization of an activity center for IT specialists (a single platform for collaborative work, an "idea generation" center) with the purpose of retaining existing and attracting new qualified personnel for IT companies in Smolensk region, with the option of buying out the cultural center "Youth" (city of Smolensk) for placement of specialistsInfrastructure support:
1. Power: 10.31 MWImplementation period
7 monthsProject implementation stage
ProposalThe need for additional funding
$1.6MPlace of implementation
Smolensk OblastThe total cost of the project
$1.6MObjective of the project
Creation of a new productionBrief description and idea
Construction of a flax factory including a factory processing flax straw and a yarn factory. The factory will become a part of a flax cluster. The new production will be aimed at creating high quality competitive products with a focus on import substitution and export. Long and cottonized flax fiber, the most in demand on the market, will be used as a raw material for the production of yarn.Infrastructure support:
1. Power: 4.53 MWImplementation period
25 monthsProject implementation stage
ProposalThe need for additional funding
$52.5MPlace of implementation
Smolensk OblastThe total cost of the project
$52.5MObjective of the project
Creation of a new productionBrief description and idea
It is planned to build a factory for cultivating and processing of champignons on the territory of the state industrial park "Phoenix"Infrastructure support:
1. Power: 4.53 MWImplementation period
90 monthsProject implementation stage
ProposalThe need for additional funding
$15.3MPlace of implementation
Smolensk OblastThe total cost of the project
$15.3MObjective of the project
Creation of a new productionBrief description and idea
Creation of an enterprise specializing in deep processing of raw materials - wood for the manufacture of products in demand on the territory of the state industrial park "Phoenix"Infrastructure support:
1. Power: 10.31 MWImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$1.3MPlace of implementation
Smolensk OblastThe total cost of the project
$1.3MObjective of the project
Creation of a new productionBrief description and idea
Organization of manufacture specializing in deep processing of wood and the sale of manufactured products for export in order to make profitInfrastructure support:
1. Power: 5.48 MWImplementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$0.7MPlace of implementation
Smolensk OblastThe total cost of the project
$0.7MObjective of the project
Creation of a new productionBrief description and idea
In the result of the project will be constructed a high-tech complex for receiving, cleaning, drying and shipping of grain crops. The complex will allow simultaneous storage of 4 types of crops which, in turn, will allow to sell products at the most optimal prices in different time periods.Infrastructure support:
1. Power: 2.1 MWImplementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$2.4MPlace of implementation
Smolensk OblastThe total cost of the project
$2.4MObjective of the project
Creation of a new productionBrief description and idea
Creation of an all-season recreation complex for residents, tourists and autotourists of Smolensk region and adjacent regions on the territory with a total area of more than 14 hectares, located near Olshansky quarries.Infrastructure support:
1. Power: 3.86 MWImplementation period
13 monthsProject implementation stage
ProposalThe need for additional funding
$4.6MPlace of implementation
Smolensk OblastThe total cost of the project
$4.6MObjective of the project
Creation of a new productionBrief description and idea
Creation of a modern high-tech dairy complex for 1200 dairy cows within the available fund of agricultural land in Smolensk regionInfrastructure support:
1. Power: 1.36 MWImplementation period
11 monthsProject implementation stage
ProposalThe need for additional funding
$14.3MPlace of implementation
Smolensk OblastThe total cost of the project
$14.3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a full-cycle enterprise for the production of liquid medical oxygen (with the possibility of subsequent gasification) on the territory of the state industrial park "Safonovo"Infrastructure support:
1. Power: 6.62 MWImplementation period
10 monthsProject implementation stage
ProposalThe need for additional funding
$9.3MPlace of implementation
Smolensk OblastThe total cost of the project
$9.3MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of autoclaved cellular concrete blocks (gas silicate blocks) on the territory of the state industrial park "Safonovo"Infrastructure support:
1. Power: 6.62 MWImplementation period
28 monthsProject implementation stage
ProposalThe need for additional funding
$48.3MPlace of implementation
Smolensk OblastThe total cost of the project
$48.3MObjective of the project
Creation of a new productionBrief description and idea
Construction in Kostroma region of a plant for processing of hydrolytic lignin dumps in the amount of 1.4 million tonsInfrastructure support:
1. Power, MW: FSK networks: substation 500 kW "Zvezda" 220/110/10, power reserve - 240 MW. MRSK networks: substation 110/10 kW, power reserve - 24 MWImplementation period
16 monthsProject implementation stage
ProposalThe need for additional funding
$1.9MPlace of implementation
Kostroma OblastThe total cost of the project
$1.9MObjective of the project
Creation of a new productionBrief description and idea
Construction in Kostroma region of a vegetable storage corresponding to the modern standards, for storage and year-round supply of products to consumersImplementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$95MPlace of implementation
Kostroma OblastThe total cost of the project
$95MObjective of the project
Creation of a new productionBrief description and idea
The project assumes construction of a plant for the manufacture of paper for corrugation and cardboard for flat layersInfrastructure support:
1. Power, MW: 1.44 MW. There is a possibility of connection. Current power reserve - 1.44 MVA (substation Surazh).Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$21.2MPlace of implementation
Bryansk OblastThe total cost of the project
$21.2MObjective of the project
Creation of a new productionBrief description and idea
The project assumes construction of an ultra-modern carbamide-methanol complex applying the most promising technologies - the combined production of ammonia and methanol, followed by the production of carbamideInfrastructure support:
1. Power: 3.73 MWImplementation period
120 monthsProject implementation stage
ProposalThe need for additional funding
$341.7MPlace of implementation
Bryansk OblastThe total cost of the project
$341.7MObjective of the project
Creation of a new productionBrief description and idea
The project assumes construction of 2 pig breeding complexes for 6800 sows with a total capacity of 26,000 tons of commercial pork per yearInfrastructure support:
1. Power, MW: 14.8 MW. There is a possibility of connection. Current power reserve - 14.8 MWA (Substation 110/35/10 kW Pochepskaya)Implementation period
10 monthsProject implementation stage
ProposalThe need for additional funding
$53.5MPlace of implementation
Bryansk OblastThe total cost of the project
$53.5MObjective of the project
Creation of a new productionBrief description and idea
The project assumes construction of a plant for the manufacture of pickled cheeses with the potential of futher development and offering consumers high quality products at competitive pricesInfrastructure support:
1. Power, MW: 9.68 MW. There is a possibility of connection. Substation 110/35/10 kW Nerussa: tranformers capacity - 16 MVA, current power reserve/shortage for the transformer substation - 8.86 MVA.Implementation period
84 monthsProject implementation stage
ProposalThe need for additional funding
$12.9MPlace of implementation
Bryansk OblastThe total cost of the project
$12.9MObjective of the project
Creation of a new productionBrief description and idea
Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.Infrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Belgorod OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of the production of LED products as part of the development of the Russian Federation's program for a gradual transition to energy-saving technologies and the abandonment of traditional light sources.Infrastructure support:
1. Power: 0.25-14.98 MWProject implementation stage
ProposalThe need for additional funding
$36MPlace of implementation
Oryol OblastThe total cost of the project
$36MObjective of the project
Creation of a new productionBrief description and idea
The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.Project implementation stage
ProposalThe need for additional funding
$1BPlace of implementation
MoscowThe total cost of the project
$1BObjective of the project
Creation of a new productionBrief description and idea
The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8,000 m2, with an emphasis on self-service, low prices and high throughput.Infrastructure support:
1. Power: 0,4 and 1 MW;Implementation period
Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)Project implementation stage
ProposalThe need for additional funding
$1.7MPlace of implementation
Moscow OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.Infrastructure support:
1. Power, MW: there is a substation for 800 kW on the territory of the plant;The need for additional funding
$20MPlace of implementation
Moscow OblastThe total cost of the project
$28MObjective of the project
Creation of a new productionBrief description and idea
It is planned to create production lines, including the following stages of production:Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$13MPlace of implementation
Oryol OblastThe total cost of the project
$13MObjective of the project
Creation of a new productionBrief description and idea
The project envisages the production of electric stoves with several hermetic levels, using energy-saving technology, as well as the possible production of built-in ovens and built-in hobs.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$47MPlace of implementation
Oryol OblastThe total cost of the project
$47MObjective of the project
Creation of a new productionBrief description and idea
The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.Infrastructure support:
The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.Project implementation stage
ProposalThe need for additional funding
$486MPlace of implementation
MoscowThe total cost of the project
$486MObjective of the project
Creation of a new productionBrief description and idea
The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.Project implementation stage
ProposalThe need for additional funding
$105MPlace of implementation
MoscowThe total cost of the project
$105MObjective of the project
Creation of a new productionBrief description and idea
Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.Infrastructure support:
1. Power, MW: 0.4;Project implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Moscow OblastThe total cost of the project
$10MObjective of the project
Creation of a new productionBrief description and idea
Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.Infrastructure support:
1. The nearest federal highway: M-7 Volga - 11 km, MKAD - 15 km.The need for additional funding
$4MThe total cost of the project
$4MBrief description and idea
It is planned to create the production of ceramic refractory products of several types.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$13MPlace of implementation
Oryol OblastThe total cost of the project
$13MObjective of the project
Creation of a new productionBrief description and idea
"It is planned to create the production of ceramic sanitary ware. The production line consists of:Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$60MPlace of implementation
Oryol OblastThe total cost of the project
$60MObjective of the project
Creation of a new productionBrief description and idea
This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.Infrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$283MPlace of implementation
Kostroma OblastThe total cost of the project
$283MObjective of the project
Creation of a new productionBrief description and idea
The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.Infrastructure support:
The industrial site has all the necessary engineering infrastructure: power supply, gas supply, water supply and sanitation, access roads and railways. The distance from the industrial site to the Tomarovka railway station is 22 km. The site has storage areas for raw materials and finished products.Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$24MPlace of implementation
Belgorod OblastThe total cost of the project
$24MObjective of the project
Creation of a new productionBrief description and idea
It is planned to build an enterprise for the extraction and processing of celestite ores.Infrastructure support:
More than 20 deposits of strontium ores with total predicted resources of about 200 million tons have been discovered. In the Tula region, the Tabolskoye deposit has been explored and about 30 ore occurrences have been discovered.Project implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Tula OblastThe total cost of the project
$29MObjective of the project
Creation of a new productionBrief description and idea
It is planned to create the production of clinker tiles. Products are manufactured on a conveyor line. Each of its components is an independent unit, with the possibility of replacement.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Oryol OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.Infrastructure support:
1. Power: 30 MWProject implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Oryol OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of an enterprise for the production of refractory bricks. The scope of this brick as the main furnace material in civil engineering, municipal infrastructure of settlements, including boiler houses, thermal power plants.Infrastructure support:
1. Power: 30 MWProject implementation stage
ProposalThe need for additional funding
$39MPlace of implementation
Oryol OblastThe total cost of the project
$39MObjective of the project
Creation of a new productionBrief description and idea
It is planned to create the production of panels for industrial housing construction:Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Oryol OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of a production line (a set of standard equipment and molds). The production process of dry construction mixtures includes certain stages: preparation of components and their transshipment, sifting, placing raw materials in storage bins, dosing, mixing, packaging, storage.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$3.9MPlace of implementation
Oryol OblastThe total cost of the project
$3.9MObjective of the project
Creation of a new productionBrief description and idea
Manufacture of finishing products and construction products.Infrastructure support:
1. The nearest federal highway: M-1 (24 km), M-9 (42 km).Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Moscow OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Construction of the first stage of the plant for the production of cement.Infrastructure support:
1. Power: 1.5 MWImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$600MPlace of implementation
Kaluga OblastThe total cost of the project
$621MBrief description and idea
Construction of the second stage of the plant for the production of cement.Infrastructure support:
1. Power: 1 MWImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$148MPlace of implementation
Kaluga OblastThe total cost of the project
$148MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of wood-based sheet materials in order to meet the needs of the domestic market for high-quality and competitive domestic timber and paper products, ensure environmental safety, and sustainably meet public needs for forest resources and services.Infrastructure support:
1. Power: 1 MWImplementation period
4 monthsProject implementation stage
ProposalThe need for additional funding
$304 thousandPlace of implementation
Kaluga OblastThe total cost of the project
$304КObjective of the project
Creation of a new productionBrief description and idea
Development of the Ulyanovsk deposit of refractory and refractory clays and construction of a factory for processing the extracted raw materials. The region has a developed mineral resource base, which makes it possible not only to maintain the region's high industrial potential, but also to export certain types of mineral raw materials and products of its processing to neighboring regions of Russia.Implementation period
12 monthsThe need for additional funding
$62MPlace of implementation
Kaluga OblastThe total cost of the project
$62MBrief description and idea
Construction of a plant for the production of radio-transparent and radio-absorbing materialsInfrastructure support:
1. Power, MW: 100;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Tula OblastThe total cost of the project
$27MBrief description and idea
Construction of an enterprise for the extraction of gypsum stone at the Bolokhovsky, Obolensky, Skuratovsky deposits.Infrastructure support:
1. Power, MW: 30;Project implementation stage
ProposalThe need for additional funding
$67MPlace of implementation
Tula OblastThe total cost of the project
$67MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of varnishes, paints, enamels, primers, adhesives, fillers, coloring pigments and drying oils.Infrastructure support:
1. Power, MW: 60;Project implementation stage
ProposalThe need for additional funding
$13MPlace of implementation
Tula OblastThe total cost of the project
$13MObjective of the project
Creation of a new productionBrief description and idea
Construction of a modern production facility for the production of knitwear.Infrastructure support:
1. Power: 0.5 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$21MPlace of implementation
Kaluga OblastThe total cost of the project
$21MObjective of the project
Creation of a new productionBrief description and idea
Enterprise for the production of medical textiles. The main products are functional medical textiles.Infrastructure support:
1. Power, MW: 8;Project implementation stage
ProposalThe need for additional funding
$16MPlace of implementation
Ivanovo OblastThe total cost of the project
$8MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the creation on the territory of the Bryansk region of a modern, highly efficient production facility for the production of vials from medical glass of the second hydrolytic class to meet the demand of the pharmaceutical industry in high-quality medical glassware of domestic production.Infrastructure support:
1. Power: 4,61 MWProject implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Bryansk OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
The project aims to build a plant for the production of automotive components.Infrastructure support:
1. Power: 4 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$13.5MPlace of implementation
Kaluga OblastThe total cost of the project
$13.5MObjective of the project
Creation of a new productionBrief description and idea
Development of the "RATAY" aeromobile aircraft complex for agricultural useInfrastructure support:
1. Power: MW: 800 KW;Project implementation stage
ProposalThe need for additional funding
$7.4MPlace of implementation
Moscow OblastThe total cost of the project
$7.4MObjective of the project
Creation of a new productionBrief description and idea
Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.Infrastructure support:
1. Power: 10 MW;Project implementation stage
ProposalThe need for additional funding
$9.5MPlace of implementation
Ivanovo OblastThe total cost of the project
$9.5MObjective of the project
Creation of a new productionBrief description and idea
The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.Infrastructure support:
1. Power: 10 MW;Project implementation stage
ProposalThe need for additional funding
$11MPlace of implementation
Ivanovo OblastThe total cost of the project
$11MObjective of the project
Creation of a new productionBrief description and idea
"The Uzlovaya" Industrial Park was the site of one of Russia's largest car manufacturing projects in 2018, implemented by the Russian division of China's Great Wall Motor Company Limited.Infrastructure support:
1. Power: up to 100 MW;Project implementation stage
ProposalThe need for additional funding
$13.5MPlace of implementation
Tula OblastThe total cost of the project
$13.5MObjective of the project
Creation of a new productionBrief description and idea
The project involves the production of electric motors designed to convert energy. This type of device transforms electric power into motive power or mechanical work.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$122MPlace of implementation
Oryol OblastThe total cost of the project
$122MObjective of the project
Creation of a new productionBrief description and idea
The project involves creating a full production cycle for traction electric motors: producing components, assembling, and testing them.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$88MPlace of implementation
Oryol OblastThe total cost of the project
$88MObjective of the project
Creation of a new productionBrief description and idea
Creation of production of high-temperature composite sealing materialsInfrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Tula OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
Organizing increased output of diesel engines with a prospective program of up to 3,000 engines per year at "Tulamashzavod". The project is aimed at reconstructing production facilities and purchasing the necessary equipment to expand production capacity and increase diesel engine output.Infrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Tula OblastThe total cost of the project
$3MObjective of the project
Creation of a new productionBrief description and idea
Creation of an organization for the production of polymer and composite coatings for aviation, rocket and space, special equipment, and other industriesInfrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$22MPlace of implementation
Tula OblastThe total cost of the project
$22MObjective of the project
Creation of a new productionBrief description and idea
Creation of a production complex for automotive components in the private and commercial vehicle segmentsInfrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$270.3MPlace of implementation
Tula OblastThe total cost of the project
$270.3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a rabbit farm located in the Ivnyansky district, Belgorod OblastInfrastructure support:
1. Power: available;Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$280КPlace of implementation
Belgorod OblastThe total cost of the project
$280КObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of frozen cooked potatoes and potato flakesInfrastructure support:
1. Power: availableImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$62MPlace of implementation
Bryansk OblastThe total cost of the project
$66MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of an ultra-modern greenhouse complex using the latest achievements of the world's crop production in the protected ground.Infrastructure support:
1. Power: connectivity available;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$25MPlace of implementation
Bryansk OblastThe total cost of the project
$25MObjective of the project
Creation of a new productionBrief description and idea
Production of pharmaceutical substancesInfrastructure support:
1. Power, MW: 8;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Tula OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Construction of the production of medical isotope TS99.Infrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$81MPlace of implementation
Tula OblastThe total cost of the project
$81MObjective of the project
Creation of a new productionBrief description and idea
When reinforcing prestressed products with K7 ropes, one of the key problems is the insufficient adhesion force of the rope to concrete. When transversely cutting the workpiece into products, rope slippage often occurs, which is manifested by the retraction of the reinforcement deep into the product. This phenomenon has a negative effect on the bearing capacity, so the product, depending on the scale of the problem, is transferred to lower strength groups or cut to smaller lengths for which the stored tension is sufficient, and in some cases even rejected. These problems are completely solved by using the TK10 rope as reinforcement on the BOF lines.Infrastructure support:
1. Power, MW: the estimated power of electrical receivers is 2.7 MW,Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Vladimir Oblast, KameshkovoThe total cost of the project
$29MObjective of the project
Creation of a new productionBrief description and idea
New tool production of ITO-Tulamash JSC.Infrastructure support:
1. Power, MW: 100;Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Tula OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
The investment project aims to create and commercially operate a high-tech wheat advanced processing complex. The facility will produce the following products: dry wheat gluten, native starch, modified starches, maltodextrin, dry glucose syrup, caramel molasses, and wheat bran-based feedstuff.Infrastructure support:
1. Power: 16 MWImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$209MPlace of implementation
Kursk OblastThe total cost of the project
$209MObjective of the project
Creation of a new productionBrief description and idea
Construction of a new production of components for the repair and modernization of metalworking machines.Infrastructure support:
1. Power, MW: 100;Project implementation stage
ProposalThe need for additional funding
$675KPlace of implementation
Tula OblastThe total cost of the project
$675KObjective of the project
Creation of a new productionBrief description and idea
The project involves 4 types of products:Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Oryol OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Creation of a baby food production facilityInfrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$65MPlace of implementation
Oryol OblastThe total cost of the project
$65MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.Infrastructure support:
1. Power, MW: 10;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$47MPlace of implementation
Ivanovo OblastThe total cost of the project
$47mObjective of the project
Creation of a new productionBrief description and idea
The aim of the project is to start the production of fruit puree for children. All ingredients for production are purchased in the Oryol Oblast from farms and agricultural farms.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Oryol OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distilleryInfrastructure support:
1. Power: 9.89 MWProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Smolensk OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cowsInfrastructure support:
1. Power: 6.19 MWProject implementation stage
ProposalThe need for additional funding
$2.3MPlace of implementation
Smolensk OblastThe total cost of the project
$2.3MObjective of the project
Creation of a new productionBrief description and idea
Investment attraction at the former broiler farm siteInfrastructure support:
1. Power: 3.8 MWImplementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Smolensk OblastThe total cost of the project
$29MObjective of the project
Creation of a new productionBrief description and idea
The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per yearInfrastructure support:
1. Power: 36 MWImplementation period
37 monthsProject implementation stage
ProposalThe need for additional funding
$84.3MPlace of implementation
Smolensk OblastThe total cost of the project
$84.3MObjective of the project
Creation of a new productionBrief description and idea
Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.Infrastructure support:
1. Power: 26 MWImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$17MPlace of implementation
Smolensk OblastThe total cost of the project
$17MObjective of the project
Creation of a new productionBrief description and idea
The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.Infrastructure support:
1. Power, MW: available:Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$8MPlace of implementation
Belgorod OblastThe total cost of the project
$8MObjective of the project
Creation of a new productionBrief description and idea
Production of crackers, biscuits, and other dry bakery products, production of flour confectionery, cakes, pastries, pies, and biscuits intended for long-term storage.Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$63.5MPlace of implementation
Tver OblastThe total cost of the project
$63.5MObjective of the project
Creation of a new productionBrief description and idea
Investment project for the construction of a high-tech meat processing complex, a feed mill, and a livestock breeding complex, including its own five swine-breeding complexes, a breeding and genetic center for 2,500 sows, a feed mill for up to 150,000 tonnes per year, a drying complex, a separation plant, a grass meal facility, and a storage complex. Project implementation period: 36 months. The number of employment places is 790.Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$62.2MPlace of implementation
Tver OblastThe total cost of the project
$62.2MObjective of the project
Creation of a new productionBrief description and idea
High-tech greenhouse complex for growing greenhouse vegetables, with three phases of implementation.Infrastructure support:
1. The nearest federal highway: M-10 (1.5 km)Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$62.2MPlace of implementation
Tver OblastThe total cost of the project
$62.2MObjective of the project
Creation of a new productionBrief description and idea
"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.Infrastructure support:
1. The nearest federal highway: M-2 "Crimea Highway" (5,5 km)Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$7MPlace of implementation
Belgorod OblastThe total cost of the project
$7MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of microcircuits.Infrastructure support:
1. Power: 2 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$25MPlace of implementation
Kaluga OblastThe total cost of the project
$25MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.Infrastructure support:
1. Power, MW: 10;Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Ivanovo OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.Infrastructure support:
1. Power, MW: 10;Project implementation stage
ProposalThe need for additional funding
$24MPlace of implementation
Ivanovo OblastThe total cost of the project
$24MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.Infrastructure support:
1. Power, MW: 0.37;Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Vladimir Oblast, Kolchuginsky district, Kolchugino cityThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of a plant for the production of household appliances.Infrastructure support:
1. Power: 0.25-14.98 MWProject implementation stage
ProposalThe need for additional funding
$21MPlace of implementation
Oryol OblastThe total cost of the project
$21MObjective of the project
Creation of a new productionBrief description and idea
Logistic controllers and switching equipment are designed to control technological processes. These products are used both in manufacturing (for example, equipment for an automation system designed to monitor and control process processors in the quality control line of tubing, casing and oil and gas pipes) and in household appliances (for example, a washing machine control module).Infrastructure support:
1. Power: 0.25 MWProject implementation stage
ProposalThe need for additional funding
$54MPlace of implementation
Orlov OblastThe total cost of the project
$54MObjective of the project
Creation of a new productionBrief description and idea
Establishment of an enterprise for the production of electric drives.Infrastructure support:
1. Power, MW: 8;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Ivanovo OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Creation of a production facility for the deep processing of horticultural, fruit, berry products and the creation of ready-made mealsInfrastructure support:
1. Power: up to 100 MW: eventually up to 150 MW;Project implementation stage
ProposalThe need for additional funding
$38MPlace of implementation
Tula OblastThe total cost of the project
$38MObjective of the project
Creation of a new productionBrief description and idea
The project aims to create a business from scratch. Foreseen costs are for the lease/purchase of land; construction of facilities for production and storage; transportation; purchase of equipment for lemonade and cider production and bottling; regular delivery of raw materials and containers; marketing strategy for market entry; advertising campaign; training and staff salaries.Infrastructure support:
1. Power: 0.25 MWProject implementation stage
ProposalThe need for additional funding
$1.5MPlace of implementation
Oryol OblastThe total cost of the project
$1.5MObjective of the project
Creation of a new productionBrief description and idea
The aim of the project is to open a brewery in the Orel Oblast. Sales are planned in the oblast and neighboring oblasts.Infrastructure support:
1. Power: 10 MWProject implementation stage
ProposalThe need for additional funding
$62.2MPlace of implementation
Oryol OblastThe total cost of the project
$62.2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of a complex for the production and selling of 7,000 ducks per year. The project includes the creation of a processing chain, including the purchase of ducklings, their raising, and further resale.Infrastructure support:
1. Power: 30 MWProject implementation stage
ProposalThe need for additional funding
$300KPlace of implementation
Oryol OblastThe total cost of the project
$300KObjective of the project
Creation of a new productionBrief description and idea
The implementation of an investment project involves expenses for:Infrastructure support:
1. Power: 10 kWProject implementation stage
ProposalThe need for additional funding
$110KPlace of implementation
Oryol OblastThe total cost of the project
$110KObjective of the project
Creation of a new productionBrief description and idea
Construction of an industrial multi-span greenhouseInfrastructure support:
1. Power: 10 kWProject implementation stage
ProposalThe need for additional funding
$34MPlace of implementation
Oryol OblastThe total cost of the project
$34MObjective of the project
Creation of a new productionBrief description and idea
An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.Infrastructure support:
1. Power, MW: 40;Implementation period
18 months (for one object)Project implementation stage
ProposalThe need for additional funding
$675MPlace of implementation
Moscow OblastThe total cost of the project
$675MObjective of the project
Creation of a new productionBrief description and idea
A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.Infrastructure support:
1. Power, 3 MW;Project implementation stage
ProposalThe need for additional funding
$68.5MPlace of implementation
Moscow OblastThe total cost of the project
$68.5MObjective of the project
Creation of a new productionBrief description and idea
Creation of an Atlantic salmon farming plant in the Kashira urban districtImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$54MPlace of implementation
Moscow OblastThe total cost of the project
$54MObjective of the project
Creation of a new productionBrief description and idea
Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.Infrastructure support:
1. Power, MW: source 1 - SS-35/10kV "Kochetovka"; electricity was supplied according to a temporary scheme with a capacity of 630 kW, TU No. 5-199 / 20284964 of 12/19/2013;Project implementation stage
ProposalThe need for additional funding
$26MPlace of implementation
Belgorod OblastThe total cost of the project
$26MObjective of the project
Creation of a new productionBrief description and idea
Organization of industrial real estate objects in the Tula region (distribution center, fulfillment, temperature warehouse, temporary storage warehouse, etc.).Infrastructure support:
1. Power, MW: up to 100 MW (in the future, up to 150 MW);Project implementation stage
ProposalThe need for additional funding
$40MPlace of implementation
Tula OblastThe total cost of the project
$40MObjective of the project
Creation of a new productionBrief description and idea
Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.Implementation period
108 monthsProject implementation stage
ProposalThe need for additional funding
$1BPlace of implementation
Moscow OblastThe total cost of the project
$1BObjective of the project
Creation of a new productionBrief description and idea
The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$181MPlace of implementation
Moscow OblastThe total cost of the project
$181MObjective of the project
Creation of a new productionBrief description and idea
Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.Infrastructure support:
1. The presence of a railway lineImplementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$67MPlace of implementation
Moscow OblastThe total cost of the project
$67MObjective of the project
Creation of a new productionBrief description and idea
Design and construction of a production and warehouse complex in the Mozhaisk city district.Infrastructure support:
1. Power, MW: 3;Implementation period
14 months – 1st stage, 12 months. – 2nd stageProject implementation stage
ProposalThe need for additional funding
$47MPlace of implementation
Moscow OblastThe total cost of the project
$47MObjective of the project
Creation of a new productionBrief description and idea
Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.Infrastructure support:
1. Power, MW: 10 with a possible increase;Project implementation stage
ProposalThe need for additional funding
$40MPlace of implementation
Moscow OblastThe total cost of the project
$40MObjective of the project
Creation of a new productionBrief description and idea
Construction of a logistics center in the urban district of Serebryanye Prudy.Infrastructure support:
1. Power, MW: 5.53;Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Construction of warehouses. This project involves the construction of warehouses for the storage of cement and finished products of other dry building mixtures. The project offers rooms that meet the requirements for humidity, temperature of storage of mixtures.Infrastructure support:
1. Power: 0.5 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$1MPlace of implementation
Kaluga OblastThe total cost of the project
$1MObjective of the project
Creation of a new productionBrief description and idea
The area of most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.Project implementation stage
ProposalThe need for additional funding
$9BPlace of implementation
MoscowThe total cost of the project
$9BObjective of the project
Creation of a new productionBrief description and idea
Construction of a modern fruit storage facility for fruit storageInfrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Tula OblastThe total cost of the project
$5MObjective of the project
Creation of a new productionBrief description and idea
Organization of industrial real estate objects on the territory of the Tula region (distribution center, production and logistics complex, container hub).Infrastructure support:
1. Power, MW 12:Project implementation stage
ProposalThe need for additional funding
$40MPlace of implementation
Tula OblastThe total cost of the project
$40MObjective of the project
Creation of a new productionBrief description and idea
Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky districtInfrastructure support:
1. The nearest federal highway: A-107 (17 km), A-113 (17 km)Project implementation stage
ProposalThe need for additional funding
$61MPlace of implementation
Moscow OblastThe total cost of the project
$61MObjective of the project
Creation of a new productionBrief description and idea
Construction of a goat farm with 6,400 milking goats in Shchelkovo districtImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$13.5MPlace of implementation
Moscow OblastThe total cost of the project
$13.5MObjective of the project
Creation of a new productionBrief description and idea
Market launch of competitive, highly effective productsInfrastructure support:
1. Power: 0,15 MW;Project implementation stage
ProposalThe need for additional funding
$9MPlace of implementation
Moscow OblastThe total cost of the project
$9MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.Infrastructure support:
1. Power: MW: 380/220 W is needed;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$6.4MPlace of implementation
Moscow OblastThe total cost of the project
$6.4MObjective of the project
Creation of a new productionBrief description and idea
Construction of a robotised dairy farmInfrastructure support:
1. Power: 1 MWImplementation period
11 monthsProject implementation stage
ProposalThe need for additional funding
$2.5MPlace of implementation
Kaluga OblastThe total cost of the project
$2.5MObjective of the project
Creation of a new productionBrief description and idea
Construction of a cattle farmInfrastructure support:
1. Power: 1 MWImplementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$400KPlace of implementation
Kaluga OblastThe total cost of the project
$400KObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of food products, a milk processing plantInfrastructure support:
1. Power: 0.5 MWImplementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$1.3MPlace of implementation
Kaluga OblastThe total cost of the project
$1.3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$66,2MPlace of implementation
Moscow OblastThe total cost of the project
$66,2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of a working rabbit farm with 18 fattening and rearing houses with a capacity of 1,430 females.Infrastructure support:
1. Power: connection point at a distance of 100 m;Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$17MPlace of implementation
Bryansk OblastThe total cost of the project
$17MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of plastic products.Infrastructure support:
1. Power: 0.5 MWImplementation period
5 monthsProject implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Kaluga OblastThe total cost of the project
$10MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a polymer processing plant.Infrastructure support:
1. Power: 1 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$6MPlace of implementation
Kaluga OblastThe total cost of the project
$6MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of woven packaging (raffia).Infrastructure support:
1. Power: 1 MWImplementation period
14 monthsProject implementation stage
ProposalThe need for additional funding
$1MPlace of implementation
Kaluga OblastThe total cost of the project
$1MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a polymer processing plant.Infrastructure support:
1. Power: 1 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$20MPlace of implementation
Kaluga OblastThe total cost of the project
$20MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of polymer fibers.Infrastructure support:
1. Power: 1 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The project involves the construction of a plant for the production of BOPP membraine liner.Infrastructure support:
1. Power: 1 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$16MPlace of implementation
Kaluga OblastThe total cost of the project
$16MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a plant for the production of polyethylene film.Infrastructure support:
1. Power: 1 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Establishment of an enterprise for the production of synthetic resins.Infrastructure support:
1. Power, MW: 20;Implementation period
7 yearsProject implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Ivanovo OblastThe total cost of the project
$10MObjective of the project
Creation of a new productionBrief description and idea
Investment project for the construction of three dairy complexes (farms) with a total herd size of up to 10,000 cows, as well as a milk processing plant.Implementation period
40 monthsProject implementation stage
ProposalThe need for additional funding
$162.2MPlace of implementation
Tver OblastThe total cost of the project
$162.2MObjective of the project
Creation of a new productionBrief description and idea
Construction of a dairy farmInfrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$27MPlace of implementation
Tula OblastThe total cost of the project
$27MObjective of the project
Creation of a new productionBrief description and idea
Project for the construction of a plant for the deep processing of coarse grains to produce amino acids and other functional additives for the agricultural and food industriesInfrastructure support:
1. Power: 9 MW;Project implementation stage
ProposalThe need for additional funding
$39.2MPlace of implementation
Tula OblastThe total cost of the project
$39.2MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of acetic acid by fermentation and chemical processing of products from destructive distillation of woodInfrastructure support:
1. Power: 60 MW;Project implementation stage
ProposalThe need for additional funding
$40.5MPlace of implementation
Tula OblastThe total cost of the project
$40.5MObjective of the project
Creation of a new productionBrief description and idea
The investment project aims to increase the production of livestock products (milk and meat) through the construction of closed-type farms with year-round stabling of cattle.Infrastructure support:
1. Power: 9 MW;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Tula OblastThe total cost of the project
$7MObjective of the project
Creation of a new productionBrief description and idea
Construction of an extraction complex for processing soybean and rapeseedInfrastructure support:
1. Power: 14 MW;Project implementation stage
ProposalThe need for additional funding
$54MPlace of implementation
Tula OblastThe total cost of the project
$54MObjective of the project
Creation of a new productionBrief description and idea
The project is aimed at building a modern linear elevator with a storage capacity of 100,000 tonnes, including grain cleaning and drying equipment. The maximum investment amount is $4.05 million. The project is expected to create 45 employment placements.Infrastructure support:
1. Power: 10 MW;Project implementation stage
ProposalThe need for additional funding
$4MPlace of implementation
Tula OblastThe total cost of the project
$4MObjective of the project
Creation of a new productionBrief description and idea
Construction of a sugar beet processing complexInfrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$11MPlace of implementation
Tula OblastThe total cost of the project
$11MObjective of the project
Creation of a new productionBrief description and idea
Construction of a horticultural processing complex.Infrastructure support:
1. Power: 2 MW;Project implementation stage
ProposalThe need for additional funding
$55.4MPlace of implementation
Tula OblastThe total cost of the project
$55.4MObjective of the project
Creation of a new productionBrief description and idea
An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilitiesInfrastructure support:
1. Power: 32.93 MW required;Project implementation stage
ProposalThe need for additional funding
$676MPlace of implementation
Moscow OblastThe total cost of the project
$676MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the manufactoring of products based on surfactants is being created. The main products are detergents and cleaning products, laundry and toilet soap, personal hygiene products.Infrastructure support:
1. Power: 20 MW;Implementation period
16 monthsProject implementation stage
ProposalThe need for additional funding
$6MPlace of implementation
Ivanovo OblastThe total cost of the project
$6MObjective of the project
Creation of a new productionBrief description and idea
The production of urea (urea) is a chemical compound, carbonic acid diamide. White crystals, soluble in polar solvents (water, ethanol, liquid ammonia).Infrastructure support:
1. Power: 60 MW;Project implementation stage
ProposalThe need for additional funding
$270MPlace of implementation
Tula OblastThe total cost of the project
$270MObjective of the project
Creation of a new productionBrief description and idea
Creation of small-tonnage chemical production of components for high-tech polymer composite materials. Production of phthalonitriles. Binders based on phthalonitrile resins.Infrastructure support:
1. Power: 100 MW;Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Tula OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Plant for the production of plastics using natural or synthetic polymers.Infrastructure support:
1. Power: 50 MW;Project implementation stage
ProposalThe need for additional funding
$20MPlace of implementation
Tula OblastThe total cost of the project
$20MObjective of the project
Creation of a new productionBrief description and idea
Production of monoethylene glycol MEG-300Infrastructure support:
1. Power: 30 MW;Project implementation stage
ProposalThe need for additional funding
$381MPlace of implementation
Tula OblastThe total cost of the project
$381MObjective of the project
Creation of a new productionBrief description and idea
Construction of a theme park on a 17,000 sq m land area. Estimated number of visits - 200 people/day.Infrastructure support:
1. Power: 1 MWImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$12MPlace of implementation
Kaluga OblastThe total cost of the project
$12MObjective of the project
Creation of a new productionBrief description and idea
Construction of a methanol plantInfrastructure support:
1. Power: 60 MW;Project implementation stage
ProposalThe need for additional funding
$252MPlace of implementation
Tula OblastThe total cost of the project
$252MObjective of the project
Creation of a new productionBrief description and idea
The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure.Infrastructure support:
1. The nearest federal highway: M-4 "Don Highway", A-105, A-107, M-2Project implementation stage
ProposalThe need for additional funding
$5.1BPlace of implementation
Moscow OblastThe total cost of the project
$5.1BObjective of the project
Creation of a new productionBrief description and idea
The creation of a multifunctional five-star hotel complex.Project implementation stage
ProposalThe need for additional funding
$20.3MPlace of implementation
Tula OblastThe total cost of the project
$20.3MObjective of the project
Creation of a new productionBrief description and idea
Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".Infrastructure support:
1. Power: MW, at the border;Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$92MPlace of implementation
Moscow OblastThe total cost of the project
$11MObjective of the project
Creation of a new productionBrief description and idea
The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.Infrastructure support:
1. Power: MW; 10 kV own independent transmission line, provides full power supply to the resort;Project implementation stage
ProposalThe need for additional funding
$5MPlace of implementation
Moscow OblastThe total cost of the project
$5MBrief description and idea
Restoration of a cultural heritage site with adaptation to the chosen function of the siteInfrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:Implementation period
27 monthsProject implementation stage
ProposalThe need for additional funding
$16.4MPlace of implementation
Moscow Oblast, Chekhov district, Meshcherskoye areaThe total cost of the project
$16.4MObjective of the project
Creation of a new productionBrief description and idea
The purpose of the project is the reconstruction of the manor into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region and the proximity of the Moscow Oblast, the expected number of visitors is at least 20,000 people per year.Infrastructure support:
1. Power: 1 MWImplementation period
33 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Renovation of the manorInfrastructure support:
1. Power: 1 MWImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
Establishment of the production of high-pressure composite cylinders.Infrastructure support:
1. Power, MW: 100,Project implementation stage
ProposalThe need for additional funding
$41MPlace of implementation
Tula OblastThe total cost of the project
$41MObjective of the project
Creation of a new productionBrief description and idea
Construction of a complex for the production of nitric acid with a capacity of 270 thousand tons per year and ammonium nitrate with a capacity of 340 thousand tons per year.Infrastructure support:
1. Power, MW: 20,Project implementation stage
ProposalThe need for additional funding
$93MPlace of implementation
Tula OblastThe total cost of the project
$93MObjective of the project
Creation of a new productionBrief description and idea
Construction of an ammonia production complex with a capacity of 525 thousand tons per year and carbamide with an output of 700 thousand tons per year.Infrastructure support:
1. Power, MW: 15,Project implementation stage
ProposalThe need for additional funding
$551MPlace of implementation
Tula OblastThe total cost of the project
$551MObjective of the project
Creation of a new productionBrief description and idea
Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms. The concept of the project aims to preserve the area and, at the same time, create a comfortable setting for outdoor recreation at all times of the year.Infrastructure support:
1. Power: 9 MW;Project implementation stage
ProposalThe need for additional funding
$13.5MPlace of implementation
Tula OblastThe total cost of the project
$23MObjective of the project
Creation of a new productionBrief description and idea
The complex of ammonia and carbamide AMKAR-1400, manufacturing productivity estimates 3,000 tons of ammonia and 4,200 tons of carbamide per day. The project is directed at increasing the export capacity of Tula Oblast, production release with higher added value cost.Infrastructure support:
1. Power, MW: 25;Project implementation stage
ProposalThe need for additional funding
$847MPlace of implementation
Tula OblastThe total cost of the project
$847MObjective of the project
Creation of a new productionBrief description and idea
Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms.Infrastructure support:
1. Power: 6 MW;Project implementation stage
ProposalThe need for additional funding
$5.4MPlace of implementation
Tula OblastThe total cost of the project
$12.1MObjective of the project
Creation of a new productionBrief description and idea
The reconstruction of the health resort complex Sanatorium "Krainka" involves the modernisation of infrastructure, improvement of accommodation facilities, improvement of the adjoining territory, and an increase of the number of available accommodation places.Infrastructure support:
1. Power: 8 MW;Project implementation stage
ProposalThe need for additional funding
$13.5MPlace of implementation
Tula OblastThe total cost of the project
$13.5MObjective of the project
Creation of a new productionBrief description and idea
Construction of a 150-bed 2 or 3-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".Infrastructure support:
1. Power: 3 MW;Project implementation stage
ProposalThe need for additional funding
$8.1MPlace of implementation
Tula OblastThe total cost of the project
$8.1MObjective of the project
Creation of a new productionBrief description and idea
Construction of a 750-bed 5-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".Infrastructure support:
1. Power: 6 MW;Project implementation stage
ProposalThe need for additional funding
$40.5MPlace of implementation
Tula OblastThe total cost of the project
$40.5MObjective of the project
Creation of a new productionBrief description and idea
Creation of infrastructure for food, accommodation and active recreation with a year-round stay.Infrastructure support:
1. Power: 1 MWImplementation period
16 monthsProject implementation stage
ProposalThe need for additional funding
$1.3MPlace of implementation
Kaluga OblastThe total cost of the project
$1.3MObjective of the project
Creation of a new productionBrief description and idea
The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.Infrastructure support:
1. Water: 10,401 m3/h;Project implementation stage
ProposalThe need for additional funding
$149MPlace of implementation
Moscow OblastThe total cost of the project
$149MObjective of the project
Creation of a new productionBrief description and idea
An enterprise for the production of geotextiles.Infrastructure support:
1. Power: 8 MW;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$32MPlace of implementation
Ivanovo OblastThe total cost of the project
$32MObjective of the project
Creation of a new productionBrief description and idea
Construction of a factory for the production of sanitary ware products from raw materials extracted in the Ulyanovsk region. The main products are sanitary ware made of ceramic masses.Infrastructure support:
1. Power: 2 MWImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$30MPlace of implementation
Kaluga OblastThe total cost of the project
$30MObjective of the project
Creation of a new productionBrief description and idea
Construction of a factory for the production of finished dosage forms. The number of jobs created is 225.Infrastructure support:
1. Power: 2 MWImplementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$38MPlace of implementation
Kaluga OblastThe total cost of the project
$38MObjective of the project
Creation of a new productionBrief description and idea
Creation of an enterprise for the mini excavator's production.Infrastructure support:
1. Power: 10 MW;Implementation period
4 monthsProject implementation stage
ProposalThe need for additional funding
$1.6MPlace of implementation
Ivanovo OblastThe total cost of the project
$1.6MObjective of the project
Creation of a new productionBrief description and idea
The project provides for the construction of a factory for the production of automotive components for Volkswagen, Skoda, Volvo, Renault, Mitsubishi car brands.Infrastructure support:
1. Power: 4 MWImplementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$18MPlace of implementation
Kaluga OblastThe total cost of the project
$18MObjective of the project
Creation of a new productionBrief description and idea
Creation and development of a modern timber industry enterprise - a woodworking factory. The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging transport.Project implementation stage
ProposalThe need for additional funding
$9.4MPlace of implementation
Tver OblastThe total cost of the project
$9.4MObjective of the project
Creation of a new productionBrief description and idea
Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.Infrastructure support:
1. Power: 250 MW and 4,934 MW;Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$33MPlace of implementation
Kostroma OblastThe total cost of the project
$33MObjective of the project
Creation of a new productionBrief description and idea
The main goal of the project is to create a new production facility equipped with modern, energy-efficient devices to make a profit through the sale of manufactured products: steel grinding balls with a diameter of 30-100 mm.Infrastructure support:
1. Power: 13 MW;Implementation period
16 monthsProject implementation stage
ProposalThe need for additional funding
$14MPlace of implementation
Vladimir OblastThe total cost of the project
$14MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of cast iron and steel: plumbing casting (plumbing and accessories), accessories for anchor-rail fastening, artistic casting.Infrastructure support:
1. Power: 3 MWImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$432MPlace of implementation
Kaluga OblastThe total cost of the project
$432MObjective of the project
Creation of a new productionBrief description and idea
Construction of a plant for the production of radio and mobile communications.Infrastructure support:
1. Power: 1 MWProject implementation stage
ProposalThe need for additional funding
$76MPlace of implementation
Kaluga OblastThe total cost of the project
$76MObjective of the project
Creation of a new productionBrief description and idea
The project is aimed at the construction of a thermoforming plant for products.Infrastructure support:
1. Power: 1 MWImplementation period
11 monthsProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Kaluga OblastThe total cost of the project
$2M