no projects

Production of surfactant-based products (ID 37.166)

Objective of the project

Establishment of an enterprise for the production of surfactants (surfactants) in the Ivanovo region.

Brief description and idea

Production of surfactants. The key process determining the competitiveness of a project is R&D and the involvement of engineering centers.

Infrastructure support:

1. Electricity, MW: 20

2. Drainage, cubic meters/hour: 60

3. Nearest federal highway: R-132 "Golden Ring", 21 km

4.Availability of a railway line: it is possible to connect to a non-public railway line of JSC "UIR", 1,7 km

Implementation period

4 years old

Project implementation stage

Pre-investment

Place of implementation

Ivanovo region, village of Inevezh

The total cost of the project

$12M

Pokrovskoye Island Health Resort (ID 62.1)

Objective of the project

Development of the territory to create a health resort. The basis of rehabilitation and rehabilitation is Sapozhkovsky therapeutic acid peat (mud). The Menek therapeutic mud deposit is located next to the resort area.

Brief description and idea

The development of the territory provides for the construction of a mud clinic equipped with modern balneological equipment, a SPA complex, and infrastructure for living, sports, and entertainment. Themed routes include hiking, cycling, and horseback riding. Thematic museums are the museum of the Soviet and Russian writer V.P. Aksenov (Pokrovskoye is the writer's ancestral village), the museum "The History of Sapozhkovsky Mud".

Infrastructure support:

1. Electricity, MW: fully meets the needs of the project
2. Drainage, cubic meters/hour: fully meets the needs of the project
3. Nearest federal highway: M-5 "Ural", 50 km; R-22 "Kaspiy" (until 2018 - M-6), 50 km
4. The presence of a railway line: Ukholovo station, 12 km

Project implementation stage

Proposal

Place of implementation

Ryazan region, Ukholovsky district

The total cost of the project

$60.2M

Construction of a corrugated cardboard production plant (ID 32.8)

Objective of the project

Creation of a new production facility.

Brief description and idea

The project provides for the construction of a plant for the production of paper for corrugation and cardboard for flat layers.

Infrastructure support:

1. Electric power, MVa: 1.44
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: A-240 "Bryansk - Novozybkov - border with the Republic of Belarus"
4. The presence of a railway line: none

Implementation period

24 months

Project implementation stage

Proposal

Place of implementation

Bryansk region

The total cost of the project

$12.73M

Construction of two pig breeding complexes (ID 32.7)

Objective of the project

Creation of a new production facility.

Brief description and idea

The project provides for the construction of two pig breeding complexes for 6,800 sows, with a total capacity of 26,000 tons of marketable pork per year.

Infrastructure support:

1. Electricity, MW: 14.8. It is possible to connect. The current power reserve is 14.8MVA (110/35/10 kV Pochepskaya substation)
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: A-240 "Bryansk - Novozybkov - border with the Republic of Belarus"
4. Railway line availability: yes

Implementation period

10 months

Project implementation stage

Proposal

Place of implementation

Bryansk region

The total cost of the project

$32.18M

Establishment of a production facility for milk processing and cheese production (ID 32.5)

Objective of the project

Creation of a new production facility.

Brief description and idea

The project provides for the construction of a brine cheese production plant, which has the potential for further development and offers consumers high-quality products at competitive prices.

Infrastructure support:

1. Electricity, MW: 9.68. It is possible to connect. 110/35/10kV Neruss substation: installed transformer capacity is 16 MVA, current reserve/power deficit for TP8.86 MVA
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-3 "Ukraine", 17 km
4. Railway line availability: yes

Implementation period

84 months

Project implementation stage

Proposal

Place of implementation

Bryansk region

The total cost of the project

$7.76M

Creation of a rabbit farm (ID 32.1)

Objective of the project

Creation of a new production facility

Brief description and idea

The project provides for the construction of a functioning rabbit breeding farm with 18 fattening and breeding buildings, the capacity of one OMK is 1,430 females.

Infrastructure support:

1. Electricity, MW: connection point at a distance of 100 m
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-3 "Ukraine"
4. The presence of a railway line: no

Implementation period

9 months

Project implementation stage

Proposal

Place of implementation

Bryansk region

The total cost of the project

$12.35M

Deep grain processing (ID 57.37)

Objective of the project

Creation of a high-tech production facility for deep grain processing and production of high-value-added products that can be used in various industries.

Brief description and idea

Deep processing of grain is necessary to obtain high-quality and more efficient grain components in terms of production. During processing, separation is performed, which releases gluten, starch and other by-products. The development of deep grain processing also helps to reduce the import of many products, as a wide range of products with high added value can be obtained in the process. The project is aimed at achieving the national goal of "Technological leadership" in the field of food security.

Infrastructure support:

1. Electricity, MW: 10
2. Water supply cubic meters/hour: 46
3. Drainage, cubic meters/hour: 75
4. Gas supply cubic meters/hour: 6500
5. Railway line availability: none

Implementation period

60 months

Project implementation stage

Proposal

Place of implementation

Oryol region

The total cost of the project

$373.5M

Production of unmanned aerial vehicles (ID 57.36)

Objective of the project

Creation of industrial mass (conveyor) production of unmanned aerial vehicles on the scientific and technical base of domestic manufacturers to solve government and industry tasks.

Brief description and idea

The "Strategy for the Development of Unmanned Aviation 2030" adopted in Russia indicates that a new branch of the economy has appeared in the country - unmanned aircraft systems (UAS). The production of unmanned aerial vehicles (UAVs) is necessary to meet the needs of customers for advanced technologies and efficient solutions for various applications. The national project "Unmanned Aircraft Systems" (UAS) is dedicated to the creation of a promising independent branch of the economy related to the creation and use of civilian unmanned aerial vehicles (UAVs).

Infrastructure support:

1. Nearest federal highway: 54A-1 "Orel-Yefremov"
2. Railway line availability: 0.2 km
3. Possibility of connection to engineering communications: no

Implementation period

12 months

Project implementation stage

Proposal

Place of implementation

Oryol region

The total cost of the project

$18.1M

Laying of intensive perennial plantings (ID 46.4)

Objective of the project

The laying of intensive long-term plantings and the launch of the project, bringing it to the planned level of payback and profitability.

Brief description and idea

This project provides for the organization of a site of intensive perennial crops (apple tree) with a total area of 21.85 hectares using drip irrigation, equipped with modern equipment.

Infrastructure support:

1. Power, MW: no
2. Drainage, cubic meters/hour: no
3. Railway line availability: 0.2 km
4. Nearest federal highway: 6 km
5. The possibility of connecting to the engineering infrastructure, including the projected time and cost: there is a possibility of technological connection to the networks of resource-supplying organizations

Implementation period

84 months

Project implementation stage

Proposal

Place of implementation

Kursk region

The total cost of the project

$2.2M

Construction of the aerated concrete block plant (ID 46.3)

Objective of the project

Creation of an efficient enterprise for the production of aerated concrete blocks, as well as meeting consumer demand in the building materials market.

Brief description and idea

The enterprise for the production of building materials will include the following facilities:
Sector 1. Production facilities:
- aerated concrete production line.
Sector 2. Storage facilities:
- warehouses for storing own factory products;
- warehouses for storing raw materials.
Sector 3. Office premises:
- premises for the staff of the production and warehouse complex (administrative premises).

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. The nearest federal highway: highway 38K-016 Kursk - Kastornoye
4. Railway line availability: 0.04 km
5. The ability to connect to the engineering infrastructure, including the projected time and cost: 12 months

Implementation period

24 months

Project implementation stage

Proposal

Place of implementation

Kursk region, Shchigry

The total cost of the project

$5.4M

Creation of production of fruit fillers (ID 46.2)

Objective of the project

Creation of a modern production of fruit and berry fillers.

Brief description and idea

Creation of a modern production facility:
- fruit and berry fillers for dairy products;
- fruit and berry fillers and ice cream toppings;
- food service products;
- fruit and berry fillers for baking.

Infrastructure support:

1. Power, MW: none
2. Drainage, cubic meters/hour: none
3. Railway line availability: 0.2 km
4. The nearest federal highway: 7 km
5. The possibility of connecting to the engineering infrastructure, including the projected time and cost: there is a possibility of technological connection to the networks of resource-supplying organizations

Implementation period

18 months

Project implementation stage

Proposal

Place of implementation

Kursk region, Kursk region

The total cost of the project

$12M

Establishment of a production facility for deep processing of wheat grain and production of xanthan gum (ID 46.1)

Objective of the project

Creation of a high-tech complex for deep processing of wheat grain with a processing capacity of 250 thousand tons of grain per year. The final products of deep processing of wheat grains will be: wheat gluten, xanthan gum, feed additive.

Brief description and idea

The production complex will allow processing low-liquid grade 4.5 wheat feed grains into products that are highly demanded by the market: wheat gluten, xanthan gum, and protein feed additives. The project will use modern technologies for deep grain processing and industrial biotechnologies using a highly productive new strain of bacteria, Xanthomonas campestris, which uses wheat starch as a breeding medium for bacteria.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: no
3. The nearest federal highway: 7 km
4. Railway line availability: 0.2 km
5. The ability to connect to the engineering infrastructure, including the projected time and cost: 6 months

Implementation period

30 months

Project implementation stage

Proposal

Place of implementation

Kursk region

The total cost of the project

$361.4M

Production of surfactant-based products (ID 37.16)

Objective of the project

Establishment of an enterprise for the production of surfactants (surfactants) in the Ivanovo region.

Brief description and idea

Production of surfactants. The key process determining the competitiveness of a project is R&D and the involvement of engineering centers.

Infrastructure support:

1. Electricity, MW: 20
2. Drainage, cubic meters/hour: 60
3. Nearest federal highway: R-132 "Golden Ring", 21 km
4.Availability of a railway line: it is possible to connect to a non-public railway line of JSC "UIR", 1,7 km

Implementation period

4 years

Project implementation stage

Proposal

Place of implementation

Ivanovo region, village of Inevezh

The total cost of the project

$7.8M

Hotel construction (ID 37.15)

Objective of the project

Opening of a 126-room hotel complex in the Ivanovo region.

Brief description and idea

Construction of a hotel complex.

Infrastructure support:

1. Electricity, MW: 10
2. Drainage, cubic meters/hour: 35
3. Nearest federal highway: R-132 "Golden Ring", 87 km
4. The presence of a railway line: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Ivanovo region, Kineshma

The total cost of the project

$8.7M

Production of synthetic fibers and yarns (ID 37.14)

Objective of the project

Establishment of an enterprise for the production of synthetic fibers and yarns in the Ivanovo region.

Brief description and idea

Production of synthetic fibers and yarns. The key process determining the competitiveness of the project is the involvement of engineering centers.

Infrastructure support:

1. Electricity, MW: 20
2. Drainage, cubic meters/hour: 60
3. Nearest federal highway: R-132 "Golden Ring", 21 km
4. Availability of a railway line: it is possible to connect 1,7 km to a non-public railway line of JSC TUIR

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Ivanovo region, village of Inevezh

The total cost of the project

$381.9M

Construction of a deep grain processing plant (ID 68.19)

Objective of the project

Creation of a biotechnological plant for deep grain processing.

Brief description and idea

The project provides for the construction of a biotechnological plant for the deep processing of feed grains to obtain concentrated protein feed products. When reaching its design capacity, the plant will process 150 thousand tons of feed-grade grain, produce 90 thousand tons of concentrated protein products (feed additives with a protein content of at least 60%), which is enough to produce at least 900 thousand tons of compound feeds for intensive livestock farming (poultry, pig farming).

Infrastructure support:

1. Electricity, MW: 3
2. Drainage, cubic meters/hour: gravity collector
3. Federal Highway: 40 km
4. Availability of a railway line: it is possible to connect to a railway line

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tambov region. Uvarovo industrial park

The total cost of the project

$27.7M

Creation of a breeding and seed center (ID 68.18)

Objective of the project

Production of Russian hybrids of tomato and cucumber seeds.

Brief description and idea

The project provides for the creation of an innovative seed breeding center designed for the production of Russian hybrids of tomato and cucumber seeds, including for light culture for sale to vegetable producers in the region.

Infrastructure support:

1. Electricity, MW: not available on the site, it is required to contact the RSO for the organization of technological connection
2. Drainage, cubic meters / hour: requires the creation of a water intake well, the project concept assumes a closed cycle of water use
3. Federal highway: R-208 Tambov - Penza, 21 km (in the immediate vicinity of the site there is an inter-municipal highway with asphalt pavement leading to the R-208 highway)
4. The presence of a railway line: none

Implementation period

4 years

Project implementation stage

Proposal

Place of implementation

Tambov region

The total cost of the project

$36.1M

Creation of a logistics center (ID 68.17)

Objective of the project

Construction of a high-tech logistics center focused on providing comprehensive fulfillment services, including storage, packaging and delivery of goods, for large organizations operating in the field of e-commerce.

Brief description and idea

The project for the construction of a high-tech logistics center for the provision of fulfillment services in the territory of the industrial park "Kotovsk", focused on servicing large organizations in the field of electronic commerce.

Infrastructure support:

1. Electricity, MW: 2
2. Drainage, cubic meters/hour: 300
3. Federal highway: R-208 "Tambov-Penza", less than 2 km
4. The presence of a railway line: at a distance of 3 km the station "Bokino"

Implementation period

4 years

Project implementation stage

Proposal

Place of implementation

Tambov region, industrial Park "Kotovsk" Tambov municipal district

The total cost of the project

$81.9M

Creation of an all-season ski sports and recreation complex (ID 68.16)

Objective of the project

Creation of a modern multifunctional complex in the Tambov region, equipped with everything necessary for active recreation and entertainment at any time of the year.

Brief description and idea

The project provides for the following key facilities: ski slopes with trails of varying difficulty (skiing, snowboarding, snowmobiling, tubing). The unique project of an artificially raised mountain, combined with the existing landscape, will create comfortable ski trails and ski-out reception areas. It is assumed that the ski complex will have a total length of more than 6 km, a height difference of 170 m, and 12 slopes of three categories; a ski and biathlon complex; an ice palace with two arenas for figure skating, ice hockey, and ice skating training for children, as well as hockey tournaments. Children's entertainment is one of the important factors in choosing a place for a family holiday, which is why the construction of a children's sports and entertainment town is envisaged. In summer, aquazones, tennis courts, volleyball, basketball courts, roller-skating trails, fishing, hiking and water tours will be open.

Infrastructure support:

1. Electricity, MW: requires study with the initiator of the project
2. Drainage, cubic meters/hour: requires study with the initiator of the project
3. Nearest federal highway: R-208 "Tambov - Penza", 10 km
4. The presence of a railway line: none

Project implementation stage

Proposal

Place of implementation

Tambov region

The total cost of the project

$110.8M

Construction of a factory for the production of ready-made dosage forms (ID 40.32)

Objective of the project

Creation of a modern enterprise for the production of ready-made dosage forms, for their sale both in the territory of the Russian Federation and abroad.

Brief description and idea

Construction of a factory for the production of ready-made dosage forms to ensure the drug safety of state and municipal healthcare organizations. Provision of the necessary medicines from our own production, widely used in medicine in the provision of first aid, as well as to meet the needs of patients with medicines included in the list of essential medicines approved by the Government of the Russian Federation.

Infrastructure support:

1. Electricity, MW: yes, according to the investor's request
2. Drainage, cubic meters/hour: yes, according to the investor's request
3. Nearest federal highway: M-3 "Ukraine", 5 km; A-130 "Moscow-Maloyaroslavets-Roslavl", 81 km
4. The presence of a railway line: none. Babyninsky district is crossed by the Moscow-Kiev railway

Project implementation stage

Proposal

Place of implementation

Kaluga region. Special economic zone industrial production type "KALUGA"

The total cost of the project

$36.1M

Construction of a factory for the production of knitted fabric (ID 40.31)

Objective of the project

Creation of a modern enterprise for the production of knitted fabric to cover the shortage of good quality knitted fabric in the Russian Federation, import substitution.

Brief description and idea

The project provides for the construction of a factory for the production of knitted fabrics, with a universal production line that allows for rapid conversion to new types of products.

Infrastructure support:

1. Electricity, MW: yes, according to the investor's request
2. Drainage, cubic meters/hour: yes, according to the investor's request
3. Nearest federal highway: 37 km. "Kaluga-Medyn" highway of regional importance, 0 km
4. The presence of a railway line: at a distance of 7 km from this site, the Govardovo freight and passenger railway station is located, where wagon shipments of goods allowed for storage in open areas of the stations are received and delivered.

Project implementation stage

Proposal

Place of implementation

Kaluga region, Industrial park "Kondrovo"

The total cost of the project

$60.2M

Construction of a greenhouse complex for year-round cultivation of cut roses and production of rose seedlings (ID 40.30)

Objective of the project

Construction of a greenhouse complex for the year-round production of rose seedlings and the cultivation of cut roses.

Brief description and idea

Cultivation of the most popular varieties of roses and the introduction of new ones as a mother material, as well as the sale of roses on the cut. It is a kind of test of the variety for resistance to diseases, attractiveness to the buyer and yield. The cultivation of varietal planting material will make planting material more accessible to consumers, namely for greenhouse plants specializing in the cultivation of cut roses.

Infrastructure support:

1. Electricity, MW: up to 50
2. Drainage, cubic meters/hour: yes, in the immediate vicinity
3. Nearest federal highway: M-3 "Moscow-Kiev", 8 km
4. The presence of a railway line: "Moscow-Kiev" railway, "Sukhinichi main station", 4.7 km

Project implementation stage

Proposal

Place of implementation

Kaluga region, Sukhinichi district

The total cost of the project

$144.6M

Construction of a fruit and vegetable processing plant (ID 68.15)

Objective of the project

Creation of a modern enterprise for processing fruit and vegetable products.

Brief description and idea

The project provides for the construction of a modern enterprise for processing fruit and vegetable products to produce products such as purees, juices, jams, jams and other products. When reaching its design capacity, the enterprise will process 250 thousand tons of fruit and vegetable raw materials. The priority type of raw materials is apples.

Infrastructure support:

1. Electricity, MW: 2
2. Drainage, cubic meters/hour: 300
3. Nearest federal highway: R-208 "Tambov-Penza", less than 2 km
4. The presence of a railway line: Bokino station, 3 km
5. The ability to connect to the engineering infrastructure, including the projected time and cost: depending on the design documentation and project conditions (2-4 months)

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Tambov region, industrial park "Kotovsk" Tambov municipal district

The total cost of the project

$6M

Manufacture of electronic components and modules (ID 71.48)

Objective of the project

Production of import-substituting products.

Brief description and idea

Construction of a plant for the production of electronic components and modules designed for controlled switching of an electrical circuit of electronic, electromechanical and electrotechnical devices and/or their components.

Infrastructure support:

1. Power, MW: 1
2. Drainage, cubic meters/hour: 6
3. Nearest federal highway: M-4 "Don", 1.5 km
4. Railway line availability: yes

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Tula region, special economic zone "Uzlovaya"

The total cost of the project

$14.5M

Multifunctional Cargo Processing Terminal (ID 71.47)

Objective of the project

Increase efficiency and reduce the cost of transportation and logistics services.

Brief description and idea

Construction and operation of a multifunctional cargo processing terminal. Terminal processing of containers, container storage, railway container shipping services, storage of frozen products, cargo work on frozen products, storage in warehouses, cargo work on pallets in warehouses.

Infrastructure support:

1. Electricity, MW: 5
2. Drainage, cubic meters/hour: 160
3. Nearest federal highway: M-4 "Don", 5.5 km
4. Railway line availability: yes

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region. Uzlovaya Special Economic Zone

The total cost of the project

$84.3M

Manufacture of medical diagnostic equipment (ID 71.46)

Objective of the project

Production of import-substituting medical equipment in the Russian Federation.

Brief description and idea

Construction and production of medical diagnostic equipment - ultrasound machines of all types, X-rays. The products planned for development and production are intended to provide medical equipment for state medical and preventive institutions.

Infrastructure support:

1. Electricity, MW: 3
2. Drainage, cubic meters/hour: 11
3. Nearest federal highway: M-4 "Don", 1.5 km
4. Railway line availability: yes

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region, special economic zone "Uzlovaya"

The total cost of the project

$33.7M

Lubricant Processing Plant (ID 71.45)

Objective of the project

Launching new products on the market.

Brief description and idea

The processing of lubricants that have passed the period of operation using environmentally friendly technologies.

Infrastructure support:

1. Electricity, MW: 5
2. Drainage, cubic meters/hour: 12.5
3. Nearest federal highway: M-4 "Don", 3 km
4. Railway line availability: yes

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region. Uzlovaya Special Economic Zone

The total cost of the project

$38.6M

Waste paper recycling plant (ID 71.44)

Objective of the project

Production of import-substituting products.

Brief description and idea

Recycling of waste paper for the subsequent production of corrugated cardboard.

Infrastructure support:

1. Electricity, MW: 3
2. Drainage, cubic meters/hour: 15
3. Nearest federal highway: M-4 "Don", 2 km
4. Railway line availability: yes

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region. Uzlovaya Special Economic Zone

The total cost of the project

$48.2M

Construction of a microelectronics technology park (ID 71.43)

Objective of the project

Increasing the investment attractiveness of the region, creating comfortable conditions for doing business.

Brief description and idea

The construction of a technopark in the Tula region to accommodate enterprises and individual entrepreneurs who organize and develop activities in the field of industrial production and/or innovation.

Infrastructure support:

1. Power, MW: 20 MW
3. Drainage, cubic meters/hour: none
4. Nearest federal highway: M-4 "Don", 7 km
5. Railway line availability: yes

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Tula region, Venev

The total cost of the project

$50.6M

Construction of a light industry technopark (ID 71.42)

Objective of the project

Increasing the investment attractiveness of the region, creating comfortable conditions for doing business.

Brief description and idea

The construction of a technopark in the Tula region to accommodate enterprises and individual entrepreneurs who organize and develop activities in the field of industrial production and/or innovation.

Infrastructure support:

1. Electricity, MW: 20 MW
3. Drainage, cubic meters/hour: not installed
4. Nearest federal highway: M-4 "Don", 7 km
5. Railway line availability: yes

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Tula region, Venev

The total cost of the project

$57.8M

Year-round eco-resort “Konduki” (Romantsev mountains) (ID 71.41)

Objective of the project

Increased tourist flow, development of territories.

Brief description and idea

Organization and development of the Northeast cluster of the tourist territory "Konduki". Creation of tourist infrastructure facilities: hotel complex, guest houses, restaurants, cafes, sports facilities, eco-parks.

Infrastructure support:

1. Electricity, MW: 5.6
2. Drainage, cubic meters/hour: 57
3. Nearest federal highway: M-4 "Don", 25 km
4. The presence of a railway line: none

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Tula region, Uzlovsky district, Konduki/Romantsev Mountains

The total cost of the project

$82.5M

Construction of a wholesale distribution center for agricultural products in the Voronezh Region (ID 36.51)

Objective of the project

The creation of a modern wholesale distribution center for agricultural products in the Voronezh Region is a necessary solution to the problem of storing and selling agricultural products of local producers through wholesale and retail trade networks.

Brief description and idea

The construction of a wholesale distribution center in the Voronezh Region is an effective mechanism within the framework of import substitution and will allow:
- to create an effective system of harvesting, storage, processing and marketing of agricultural products
- increase incomes and employment of rural population
- effectively develop regional agricultural consumer cooperation
- to create a tool for state and regional regulation of food commodity flows and prices in order to support the domestic agricultural producer
- increase the production of domestic competitive products
- ensure the formation and observance of standards
- provide the population with high-quality local fruit and vegetable products

Infrastructure support:

1. Electricity, MW: 4
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-4 "Don", 25 km
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Liskinsky municipal district

The total cost of the project

$64.1M

Construction of a concept restaurant (ID 36.50)

Objective of the project

The purpose of the project is to build a restaurant in the Voronezh Region. It is planned to create a conceptual restaurant with natural farm cuisine.

Brief description and idea

The urgency of building a restaurant is explained by the fact that in 2024 there is an increase in domestic tourism in the Russian Federation, which creates additional demand for restaurant business services, and a shortage of catering outlets after the pandemic crisis. In addition, the trend towards health care is growing as consumers pay more attention to their health and well-being, as well as what they eat. The pandemic has put a new emphasis on health. Due to these two factors, the demand for healthy and eco-friendly dishes is growing in the restaurant industry.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-4 "Don", 13 km
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Voronezh

The total cost of the project

$0.4M

Equestrian club construction (ID 36.49)

Objective of the project

The purpose of building an equestrian club is determined by the growing demand for sports tourism and the general increase in the involvement of the population in sports events. The implementation of the proposal will allow meeting similar needs of the population of the Voronezh region, as well as numerous tourists staying in the region.

Brief description and idea

The Equestrian Club will offer a range of educational and entertainment services, namely:
- horse riding training;
- professional training of athletes for competitions;
- organization of horseback riding;
- horse rental;
- hippotherapy;
- rental of stalls;
- rental of exercise equipment for horses

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. The nearest federal highway: the distance to the regional highway R-298 "Kaspiy", 12 km; M-4 "Don", 30 km
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Semiluksky municipal district

The total cost of the project

$0.4M

Construction of a sports and entertainment park (ID 36.48)

Objective of the project

The purpose of the construction of the sports and entertainment park is determined by the growing demand for sports tourism and the general increase in the involvement of the population in sports events. The implementation of the proposal will allow meeting similar needs of the population of the Voronezh region, as well as numerous tourists staying in the region.

Brief description and idea

The sports and entertainment park includes
- sports grounds (volleyball, ping-pong, badminton, workout area)
- rope mini-town
- shooting gallery
- playgrounds
- trampolines
- climbing wall
- laser tag
- paintball
- recreation area

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: R-298 "Kursk-Voronezh", 12 km, M-4 "Don", 30 km
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Semiluksky municipal district

The total cost of the project

$0.5M

Construction of a children’s camp in the Voronezh Region (ID 36.47)

Objective of the project

A modern children's camp needs to respond to the demands of the time: to offer children unique programs, to teach skills and professions in demand on the labor market, and to develop a child's creative skills. This project fulfills an important mission for the socialization and upbringing of children, and is socially responsible.

Brief description and idea

The investment proposal provides for the construction of a private children's camp in the Voronezh Region.

Infrastructure support:

1. Electricity, MW: reserve of 35 kV substation "Don"
2. Drainage, cubic meters/hour: the distance to the well is 90 m
3. Nearest federal highway: R-194 "Voronezh - Lugansk (state border)", 320 m
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Khokholsky municipal district

The total cost of the project

$0.7M

Construction of a roadside complex on the M-4 “DON” road in the Pavlovsky district of the Voronezh region (ID 36.46)

Objective of the project

The investment proposal provides for the construction of a roadside complex on the M-4 Don highway, which is a key artery in southern Russia.

Brief description and idea

Every year, an increasing number of tourists pass through the M-4 Don highway, and there are practically no competitive roadside complexes in the Voronezh Region, so the implementation of this investment proposal in the region is an urgent area.The roadside complex will be able to provide the guests of the region with comfortable recreation areas: rooms equipped with everything necessary, secure Parking, laundry, cafe. The implementation of the investment proposal for the construction of a roadside complex will create conditions for the development of high-quality road services, as well as improve the recreation conditions for residents and guests of the Voronezh region.

Infrastructure support:

1. Electricity, MW: TP-70 overhead line poles-10 kV
2. Drainage, cubic meters/hour: 35 Chkalova St. projected water well at the outlet of the"Chkalova" water supply line, 2.5 km
3. The nearest federal highway: M-4 "Don", 3 km; "Pavlovsk-Kalach-Petropavlovsk", 0.1 km
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Pavlovsky municipal district

The total cost of the project

$1.4M

Construction of a food mall on the territory of Petrovskaya Embankment (ID 36.45)

Objective of the project

The purpose of building the food mall is due to the following factors: - high demand for the products offered (diverse cuisines of the world as fast food outlets in a popular tourist destination); - accessibility; - variety.

Brief description and idea

The investment proposal provides for the construction of a food mall (gastronomic center), namely a space with mini-restaurants, cafes, snack bars, pastry shops, shops with national dishes, small shops and shopping malls.

Infrastructure support:

1. Electricity, MW: none
2. Water supply cubic meters/hour: none
3. Drainage, cubic meters/hour: none
4. Nearest federal highway: none
5. Railway line availability: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Voronezh

The total cost of the project

$1.8M

Construction of a factory for the production of sanitary ceramics (ID 36.44)

Objective of the project

Due to the absence of such production in the Voronezh Region, an investment proposal is proposed for the creation of a factory for the production of sanitary ware products.

Brief description and idea

The high performance of the Voronezh Region in the field of construction, the availability of the necessary raw materials, as well as the absence of competitors and a wide sales market contribute to the creation of a factory for the production of sanitary ceramics.

Infrastructure support:

1. Electricity, MW: connection point of 110 sq. m. substation Location – 2800 m from the site boundary
2. Drainage, cubic meters/hour: connection point HC-2. The estimated capacity is 4000 m3/h. Location – 1400 m from the boundary of the plot
3. Nearest federal highway: M-4 "Don", 32.8 km
4. The presence of a railway line: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Novovoronezh city district

The total cost of the project

$7.8M

Construction of a shrimp farm (ID 36.43)

Objective of the project

The share of foreign products in the Russian market is more than 85%. It is also worth noting that mostly fish and seafood are imported in frozen form – about 90% of the total import volume. The aim of the project is to create an import-substituting shrimp production facility.

Brief description and idea

A shrimp farm is a form of aquaculture that artificially breeds shrimp. The sale of fresh seafood produced near the market remains a promising and important area in the food industry.

Infrastructure support:

1. Power, MW: 10 KV overhead power lines
2. Drainage, cubic meters/hour: depth of groundwater: from 1.5 to 4.2 m
3. The nearest federal highway: highway E-38-A144 Kursk-Saratov , 27 km
4. The presence of a railway line: no

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh Region, Ternovsky municipal district

The total cost of the project

$9.4M

Construction of a hardware manufacturing plant (ID 36.42)

Objective of the project

The construction of a hardware manufacturing plant aims to cover the needs of enterprises in the Voronezh Region and neighboring regions for these products.

Brief description and idea

The production of hardware products in the Voronezh region is a promising area, as the main consumers of these products are construction companies, and the construction industry is one of the key industries in the region. The project provides for the production of fasteners and wire.

Infrastructure support:

1. Electricity, kW: POWER LINE 10
2. Drainage, cubic meters/hour: well
3. Nearest federal highway: M-4 "Don", 130 km
4. The presence of a railway line: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, repyevsky municipal district

The total cost of the project

$10.1M

Construction of a fish farming complex for the cultivation of rainbow trout in a closed-loop water supply facility (ID 36.41)

Objective of the project

The investment proposal provides for the construction of a fish farming complex for the cultivation of rainbow trout in closed-loop water supply installations.

Brief description and idea

The project provides for the cultivation of 300 tons of fish and its subsequent processing and sale.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: R-298 "Kursk-Voronezh"; R-22 "Kaspiy", 4,6 km
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Anninsky municipal district

The total cost of the project

$11.1M

Construction of an enterprise for the production of contact lens storage solution (ID 36.40)

Objective of the project

The creation of our own factory for the production of solutions for contact lenses and lenses themselves in Russia will meet the growing demand for these products, reduce dependence on imports and create new jobs.

Brief description and idea

It is planned to create a modern factory specializing in the production of high-quality solutions for the care of contact lenses and the contact lenses themselves.

Infrastructure support:

1. Electricity, kW: 0.4
2. Drainage, cubic meters/hour: none
3. The nearest federal highway: M-4 "Don"

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Ramonsky municipal district

The total cost of the project

$11.3M

Construction of the thermal complex (ID 36.39)

Objective of the project

The purpose of the construction of a thermal complex with the possibility of accommodation in a hotel where wellness services are provided is that there is currently a steady increase in demand for tourist and recreational services, and the implementation of this project will meet similar needs of the population of the Voronezh region and guests of the region.

Brief description and idea

The investment proposal provides for the construction and operation of an aquathermal complex in the Voronezh Region, combining recreation and wellness elements accessible to all segments of the population.

Infrastructure support:

1. Electricity, MW: connection point of 110 sq. m. substation Location – 2,200 m from the site boundary
2. Drainage, cubic meters/hour: connection point HC-2. Estimated capacity of 4000; location – 800 m from the boundary of the site
3. Nearest federal highway: 34 km
4. The presence of a railway line: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Novovoronezh city district

The total cost of the project

$11.5M

Establishment of a large regional research and production center for testing and competencies in the field of UAS development (ID 36.38)

Objective of the project

Russia's innovation policy, the interest of the state and representatives of the real sector of the economy in the use of unmanned technologies in performing various tasks provide the basis for the development of UAS in the Voronezh Region.

Brief description and idea

UAS in the Voronezh region. The project involves the creation of a large regional scientific and production center for testing and competence in the field of UAS development with the production of UAS for civilian purposes.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: R-208 "Tambov-Penza", A-144 "Kursk-Voronezh-Borisoglebsk"
4. The presence of a railway line: none

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Voronezh region, Semiluksky municipal district

The total cost of the project

$17M

Construction of a pet food production plant (ID 36.37)

Objective of the project

Despite the fact that 85% of the country's feed is of domestic production, the production of premium—class and, more importantly, veterinary feed is poorly developed in the Russian Federation. The Russian market for ready-made pet food is far from saturated: the prevalence of pet food is still much lower than in developed countries. This indicates that the market has significant growth potential. In this regard, an investment proposal is proposed for the construction of a pet food production plant in the Voronezh Region.

Brief description and idea

The project involves the production of dry food for dogs and cats.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: it is necessary to build wells/water intake. The depth of groundwater is 30-40 m.
3. Nearest federal highway: none
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Kashirsky municipal district, Voronezh region

The total cost of the project

$31.8M

Construction of a brick factory (ID 36.36)

Objective of the project

The high performance of the Voronezh Region in the construction sector necessitates the creation of a brick factory, which is one of the most sought-after building materials in Russia.

Brief description and idea

It is planned to create an enterprise for the production of ceramic bricks. Modern automated brick production lines make it possible to obtain a diverse range of manufactured products.

Infrastructure support:

1. Power MW: TP
2. Drainage, cubic meters/hour: central water supply
3. The presence of a railway line: adjacent to the site is an access railway dead end from the station "Podgornoye"
4. The Federal highway and the distance to it: highway M-4 "Don", 44 km

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Podgorensky municipal district

The total cost of the project

$39M

Construction of a plant for deep processing of high-protein oilseed crops (ID 36.35)

Objective of the project

Currently, there is a constant development in the construction of new soybean processing facilities, especially in Central Russia. This Maslenitsa crop has recently demonstrated one of the highest production profitability. The aim of the project is to build a plant for deep processing of high-protein shrovetide crops in the Voronezh Region.

Brief description and idea

On the territory of the Voronezh Region, an average of 440-450 thousand tons of soybeans are harvested annually, the main buyers of which are oil processing plants and soybean processing plants. Taking into account the large volume of soybean cultivation in the region, the small number of enterprises engaged in its processing in the region, as well as the development of exports of the Voronezh Region to China and the fact that it is the world's largest consumer of soybeans, the implementation of this investment proposal is relevant.

Infrastructure support:

1. Electricity, MW: line VL-6-24 substation No. 1 at a distance of 100 m
2. Drainage, cubic meters/hour: construction of own well
3. Nearest federal highway: none
4. Gas supply: high-pressure gas pipeline within the boundaries of the site
5. Railway line availability: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Ostrogozhsky municipal district

The total cost of the project

$87.3M

Construction of a factory for the production of large household appliances (ID 36.34)

Objective of the project

The departure of foreign partners froze many promising projects that were planned for implementation. However, Chinese and Turkish manufacturers have replaced European companies. They are not only increasing the supply of their own products to the country, acquiring existing Russian plants, but also building new ones. In this regard, it is proposed to implement an investment proposal for the construction of a plant for the production of large household appliances in the Voronezh region.

Brief description and idea

It is planned to create a modern factory for the production of large household appliances such as refrigerators, washing machines, dryers.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-4 "Don", 11 km
4. The presence of a railway line: none

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Voronezh region, Novousmansky municipal district

The total cost of the project

$245.3M

Fruit and vegetable processing plant (ID 71.40)

Objective of the project

Expansion of the product line.

Brief description and idea

Construction of a fruit and vegetable processing plant.

Infrastructure support:

1. Electricity, MW: 4
2. Drainage, cubic meters/hour: none
3. The nearest federal highway: M-2 "Crimea", 9 km
4. The presence of a railway line: none

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Tula region, the territory of advanced development "Aleksin"

The total cost of the project

$5.8M

Construction of an international chain hotel (ID 71.38)

Objective of the project

Increased tourist flow, development of territories.

Brief description and idea

The project involves the construction of a hotel that is part of one of the federal networks.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-4 "Don", 7.6 km
4. The presence of a railway line: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region

The total cost of the project

$2.4M

Construction of a sugar beet processing plant (ID 71.34)

Objective of the project

Expansion of the product line.

Brief description and idea

Construction of production facilities for the cultivation and processing of sugar beet.

Infrastructure support:

1. Power, MW: 5 MW
2. Drainage, cubic meters/hour: 7 m3/h
3. Nearest federal highway: R-92 "Kaluga — Przemysl — Belev — Orel", 27 km
4. The presence of a railway line: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region, Arsenyevsky district

The total cost of the project

$7.2M

Construction of a linear elevator with grain cleaning and drying equipment (ID 71.29)

Objective of the project

The possibility of increasing production capacity to enter foreign markets.

Brief description and idea

Construction of a modern linear elevator with a one-time storage capacity of 100 thousand tons with equipment for cleaning and drying grain.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: water supply through the railway, free capacity - 36 m3/day. The distance from the site boundary is 850 m
3. The nearest federal highway: M-2 "Crimea", 4.5 km
4. Railway line length: 130 m

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region, Plavsky district

The total cost of the project

$14.5M

Creation of paint and varnish production (ID 71.28)

Objective of the project

Expansion of the product line.

Brief description and idea

Construction of a plant for the production of lacquers, paints, enamels, primers, adhesives, putties, coloring pigments and drying oils.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. The nearest federal highway: M-2 "Crimea", 7 km
4. The presence of a railway line: along the border of the site

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region, Shchekino

The total cost of the project

$25.9M

Metalworking Machine Components Factory (ID 71.19)

Objective of the project

Import substitution.

Brief description and idea

Construction of a new production of components for the repair and modernization of metalworking machines.

Infrastructure support:

1. Electricity, MW: 6
2. Drainage, cubic meters/hour: 7
3. Nearest federal highway: M-4 "Don", 3 km
4. The presence of a railway line: none

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Tula region, industrial park "Uzlovaya"

The total cost of the project

$14.5M

Construction of a gypsum stone mining company (ID 71.16)

Objective of the project

The possibility of increasing production capacity to enter foreign markets.

Brief description and idea

Construction of a gypsum stone mining company.

Infrastructure support:

1. Electricity, MW: none
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-4 "Don", 100 m
4. The presence of a railway line: none

Implementation period

1 year

Project implementation stage

Proposal

Place of implementation

Tula region, Venevsky district

The total cost of the project

$3.6M

Manufacture of pharmaceutical substances (ID 71.7)

Objective of the project

Import substitution.

Brief description and idea

Production of pharmaceutical substances.

Infrastructure support:

1. Electricity, MW: 6.5
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-4 "Don", 5 km
4. Railway line availability: yes

Implementation period

2 years

Project implementation stage

Proposal

Place of implementation

Tula region, Kireevsky district

The total cost of the project

$18.1M

Fruit storage facility construction (ID 71.6)

Objective of the project

The possibility of increasing production capacity to enter foreign markets.

Brief description and idea

Construction of a modern fruit storage facility for fruit storage.

Infrastructure support:

1. Power, MW: Substation No. 358 Rebarnaya in the village. Tovarkovsky: current capacity reserve: 23.84 mvA
2. Drainage, cubic meters/hour: not installed
3. The nearest federal highway: the railway dead end of JSC Tovarkovosakhar through the Levinka-Tovarkovo station is located 1 km from the border of the site
4. Availability of railway line: M-4 "Don", 9,5 km

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region, Bogoroditsky district

The total cost of the project

$5.4M

Construction of a plant for deep processing of plant products (ID 71.3)

Objective of the project

The possibility of increasing production capacity to enter foreign markets.

Brief description and idea

Creation of a production facility for deep processing of fruit and vegetable, fruit and berry products and the production of ready meals.

Infrastructure support:

1. Electricity, MW: the nearest substation is No. 310 Partizanskaya. Current power reserve: 8.77
2. Drainage, cubic meters/hour: none
3. Nearest federal highway: M-4 "Don", 9.5 km
4. The presence of a railway line: none

Implementation period

3 years

Project implementation stage

Proposal

Place of implementation

Tula region, Uzlovsky district

The total cost of the project

$34.9M

Electronics production (ID 57.25)

IRR
37%
РВР
32 months

Objective of the project

Creation of a new production.

Brief description and idea

The project assumes production of consumer electronics and engineering networks. Production line consists of: a line for the production of printed circuit assemblies, a line for washing and varnishing, a selective soldering oven, a vapor-phase oven with a vacuum.

Infrastructure support:

1. Electricity, MWh: 10
2. Gas supply, cubic meters/hour: 6 500
3. Water supply cubic meters/hour: 46
4. The presence of a railway line: none

Project implementation stage

Proposal

The need for additional funding

$70.16M

Place of implementation

Oryol Oblast

The total cost of the project

$84.3M

Reconstruction of the Intourist-Yelets Hotel (ID 48.6)

NPV
$3.7M
IRR
18%
РВР
6.5 years

Objective of the project

Modernization.

Brief description and idea

The project assumes reconstruction of the Hotel Intourist-Yelets: year of construction - 1988, number of rooms - 136, territory of the hotel - 6,042 square meters.

Infrastructure support:

1. Electricity, MW: 0.15
2. Water supply, cubic meters/hour: 50
3. Drainage, cubic meters/hour: 50
4. Gas supply, cubic meters/hour: 500
5. Nearest federal highway: 15 km
6. Railway line availability: 0 km

Project implementation stage

Proposal

The need for additional funding

$8.01M

Place of implementation

Lipetsk Oblast

The total cost of the project

$8.01M

Construction of a vegetable and fruit chips plant (ID 31.26)

NPV
$0.6M
IRR
21.53%
РВР
87.9 months

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a plant for the production of vegetable and fruit chips with a production capacity of 40 tons per year.

Infrastructure support:

1. Electricity, MW: source 1 – PS-35/10 kV "Kochetovka"; power supply according to a temporary scheme with a capacity of 630 kW, TU No. 5-199/20284964 dated 12/19/2013
2. Water supply, cubic meters / hour: possible by drilling wells; to meet the demand of 125, it is necessary to drill 6 water intake wells of 25 (5 working and 1 backup)
3. Gas supply, cubic meters / hour: the source is the GRS of the village of Malye Mayachki (P 0.6 MPa), an underground gas pipeline; free peak load of 2 – 6.7 thousand; a gas pipeline with a maximum hourly flow rate of 6.6 thousand, TU No. 7566 dated 11/29/2013
4. The nearest federal highway: an asphalt-paved highway runs near the site

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$1.04M

Place of implementation

Belgorod Oblast

The total cost of the project

$1.2M

Construction of a ready-made frozen pasta factory (ID 31.25)

NPV
$0.7M
IRR
19.8%
РВР
59 months

Objective of the project

Creation of a new production.

Brief description and idea

The project assumes construction of a complex for the production of ready-made frozen pasta with a maximum production capacity of 1,200 tons per month in the village Belovskoe in Belgorod region. Planned commissioning date is March, 2023. Creation of 29 working places with an average salary of 33,4 thousand rubles. Manufacture is planned to be located on the territory of land plot with the cadastral number 31:15:0904001:3793, address: Belgorod region, village Belovskoe, Magistralnaya street, № 16в. In the production of pasta only natural, environmentally friendly ingredients will be used - flour, eggs, spices and water. There is no need to use any preservatives, flavourings and colorants - the production and storage technology allows to save mineral-vitamin complex for 2 years.
Import substitution. Manufactured product is not a novelty, in addition to the fact that it has a large and established sales market in Europe, Russian customers are familiar with it as this product has been imported to Russia for more that 3 years.
Development of the food industry in Belgorod region with the launch of a product that has no Russian analogue on the market. The company plans to concentrate sales in the following segments: HoReCa - 50%, municipal institutions (hospitals, schools, pre-school institutions etc.) - 20%, catering companies - 30%.

Infrastructure support:

1. Electricity, MW: 1
2. Water supply, cubic meters/hour: 400
3. Drainage, cubic meters/hour: 400
4. Gas supply, cubic meters/hour: 60

Implementation period

14 months

Project implementation stage

Proposal

The need for additional funding

$8.34M

Place of implementation

Belgorod Oblast

The total cost of the project

$10M

Creation of microcalcite production (ID 67.18)

NPV
$6.7M
IRR
55%
РВР
35 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of modern production of microcalcite from calcium carbonate for the needs of enterprises of Russian Federation engaged in the production of plastics, polymers, paints and varnishes, linoleum, cable plastic, rubber products, sealants and drilling fluids.

Infrastructure support:

1. Electricity, MW: 3.86
2. Gas supply, cubic meters/hour: 1,911
3. The presence of a railway line: Smolenskaya railway station, 82 km

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Smolensk Oblast

The total cost of the project

$3M

Manufacture of prosthetic and orthopedic products (ID 67.17)

NPV
$30.8M
IRR
23%
РВР
82 months

Objective of the project

Creation of a new production.

Brief description and idea

Production of endoprostheses of the knee and hip joints with the potential of 30-40% of imported goods substitution.

Infrastructure support:

1. Electricity, MW: 3.86
2. Gas supply, cubic meters/hour: 1,911
3. The presence of a railway line: Smolenskaya railway station, 82 km

Implementation period

20 months

Project implementation stage

Proposal

The need for additional funding

$17.04M

Place of implementation

Smolensk Oblast

The total cost of the project

$17.04M

Creation of a transport and logistics complex (ID 67.16)

NPV
$24.2M
IRR
29%
РВР
70 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of a transport and logistics complex for 3,000-4,000 vehicles with arrangement of parking and storage places for transport, construction of warehouses and of a training and educational complex for employees.

Infrastructure support:

1. Electricity, MW: 4.54
2. Gas supply, cubic meters/hour: 37,100
3. The presence of a railway line: Smolenskaya railway station, 8 km
4. Nearest federal highway: M-1 "Belarus", 9 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$13.03M

Place of implementation

Smolensk Oblast

The total cost of the project

$13.03M

Creation of a high-tech coworking with IT specialization (ID 67.15)

NPV
$1.8M
IRR
23%
РВР
48 months

Objective of the project

Creation of a new production.

Brief description and idea

Organization of an activity center for IT specialists (a single platform for collaborative work, an "idea generation" center) with the purpose of retaining existing and attracting new qualified personnel for IT companies in Smolensk region, with the option of buying out the cultural center "Youth" (city of Smolensk) for placement of specialists.

Infrastructure support:

1. Electricity, MW: 10.31
2. Gas supply, cubic meters/hour: 26,902
3. The presence of a railway line: Smolenskaya railway station, 2.5 km
4. Nearest federal highway: M-1 "Belarus", 20 km; R-120 "Orel — Bryansk — Smolensk — border with the Republic of Belarus", 8 km

Implementation period

7 months

Project implementation stage

Proposal

The need for additional funding

$0.95M

Place of implementation

Smolensk Oblast

The total cost of the project

$0.95M

Costruction of a flax plant (ID 67.14)

NPV
$56.7M
IRR
23%
РВР
86 months

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a flax factory including a factory processing flax straw and a yarn factory. The factory will become a part of a flax cluster. The new production will be aimed at creating high quality competitive products with a focus on import substitution and export. Long and cottonized flax fiber, the most in demand on the market, will be used as a raw material for the production of yarn.

Infrastructure support:

1. Electricity, MW: 4.53
2. Gas supply, cubic meters/hour: 4,947
3. Nearest federal highway: M-1 "Belarus", 3 km
4. The presence of a railway line: Smolenskaya railway station, 8 km

Implementation period

25 months

Project implementation stage

Proposal

The need for additional funding

$31.57M

Place of implementation

Smolensk Oblast

The total cost of the project

$31.57M

Construction of a factory for cultivating and processing of champignons (ID 67.13)

NPV
$19M
IRR
14%
РВР
90 months

Objective of the project

Creation of a new production.

Brief description and idea

It is planned to build a factory for cultivating and processing of champignons on the territory of the state industrial park "Phoenix".

Infrastructure support:

1. Electricity, MW: 4.53
2. Water supply, cubic meters/hour: 36,000
3. Drainage, cubic meters/hour: 36,000
4. Gas supply, cubic meters/hour: 26,902
5. Railway line availability: Smolenskaya railway station, 1 km
6. Nearest federal highway: M-1 "Belarus", 20 km; R-120 "Orel — Bryansk — Smolensk — border with the Republic of Belarus", 8 km

Implementation period

90 months

Project implementation stage

Proposal

The need for additional funding

$9.22M

Place of implementation

Smolensk Oblast

The total cost of the project

$9.22M

Organization of production of slab glued products from natural veneer (ID 67.12)

NPV
$2.5M
IRR
22%
РВР
78 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of an enterprise specializing in deep processing of raw materials - wood for the manufacture of products in demand on the territory of the state industrial park "Phoenix".

Infrastructure support:

1. Electricity, MW: 10.31
2. Water supply, cubic meters/hour: 36,000
3. Drainage, cubic meters/hour: 36,000
4. Gas supply, cubic meters/hour: 26,902
5. Railway line availability: Smolenskaya railway station, 1 km
6. Nearest federal highway: M-1 "Belarus", 20 km; R-120 "Orel — Bryansk — Smolensk — border with the Republic of Belarus", 8 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$1.3M

Place of implementation

Smolensk Oblast

The total cost of the project

$1.3M

Creation of pallet blanks production (ID 67.11)

NPV
$1.7M
IRR
35%
РВР
25 months

Objective of the project

Creation of a new production.

Brief description and idea

Organization of manufacture specializing in deep processing of wood and the sale of manufactured products for export in order to make profit.

Infrastructure support:

1. Electricity, MW: 5,48
2. Gas supply, cubic meters/hour: 6,000
3. The presence of a railway line: Smolenskaya railway station, 74 km

Implementation period

6 months

Project implementation stage

Proposal

The need for additional funding

$0.7M

Place of implementation

Smolensk Oblast

The total cost of the project

$0.7M

Construction of a complex for receiving, cleaning, drying and shipping of grain crops (ID 67.10)

NPV
$2.7M
IRR
29%
РВР
56 months

Objective of the project

Creation of a new production.

Brief description and idea

In the result of the project will be constructed a high-tech complex for receiving, cleaning, drying and shipping of grain crops. The complex will allow simultaneous storage of 4 types of crops which, in turn, will allow to sell products at the most optimal prices in different time periods.

Infrastructure support:

1. Electricity, MW: 2.1
2. Gas supply, cubic meters/hour: 63,791
3. The presence of a railway line: Smolenskaya railway station, 90 km
4. Nearest federal highway: A-130 "Maloyaroslavets - Roslavl - border with the Republic of Belarus", 5 km

Implementation period

9 months

Project implementation stage

Proposal

The need for additional funding

$1.45M

Place of implementation

Smolensk Oblast

The total cost of the project

$1.45M

Creation of a recreation complex “Olshansky quarries” (ID 67.9)

NPV
$9M
IRR
19%
РВР
97 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of an all-season recreation complex for residents, tourists and autotourists of Smolensk region and adjacent regions on the territory with a total area of more than 14 hectares, located near Olshansky quarries.

Infrastructure support:

1. Electricity, MW: 3.86
2. Gas supply, cubic meters/hour: 37,206
3. Nearest federal highway: M-1 "Belarus", 5 km; R-120 "Orel — Bryansk — Smolensk — border with the Republic of Belarus", 4.5 km
4. The presence of a railway line: Smolenskaya railway station, 12.5 km

Implementation period

13 months

Project implementation stage

Proposal

The need for additional funding

$2.76M

Place of implementation

Smolensk Oblast

The total cost of the project

$2.76M

Creation of livestock complex for 1200 dairy cows (ID 67.8)

NPV
$17.5M
IRR
19%
РВР
49 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of a modern high-tech dairy complex for 1200 dairy cows within the available fund of agricultural land in Smolensk region.

Infrastructure support:

1. Electricity, MW: 1.36
2. Gas supply, cubic meters/hour: 30,000
3. Nearest federal highway: A-130 "Moscow - Maloyaroslavets - Roslavl - border with the Republic of Belarus", 3 km; R-120 "Orel - Bryansk - Smolensk - border with the Republic of Belarus", 3 km
4. The presence of a railway line: Smolenskaya railway station, 108 km

Implementation period

11 months

Project implementation stage

Proposal

The need for additional funding

$8.62M

Place of implementation

Smolensk Oblast

The total cost of the project

$8.62M

Construction of a gas generating complex for the production of medical oxygen (ID 67.7)

NPV
$14.3M
IRR
23%
РВР
59 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of a full-cycle enterprise for the production of liquid medical oxygen (with the possibility of subsequent gasification) on the territory of the state industrial park "Safonovo".

Infrastructure support:

1. Electricity, MW: 6.62
2. Water supply, cubic meters/hour: 16,440
3. Drainage, cubic meters/hour: 16,440
4. Gas supply, cubic meters/hour: 495
5. Nearest federal highway: M-1 "Belarus", 9 km
6. The presence of a railway line: Smolenskaya railway station, 84 km

Implementation period

10 months

Project implementation stage

Proposal

Place of implementation

Smolensk Oblast

The total cost of the project

$5.61M

Construction of a gas silicate blocks plant (ID 67.6)

NPV
$24.2M
IRR
29%
РВР
70 months

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a plant for the production of autoclaved cellular concrete blocks (gas silicate blocks) on the territory of the state industrial park "Safonovo".

Infrastructure support:

1. Electricity, MW: 6.62
2. Water supply, cubic meters/hour: 16,440
3. Drainage, cubic meters/hour: 16,440
4. Gas supply, cubic meters/hour: 495
5. Nearest federal highway: M-1 "Belarus", 9 km
6. The presence of a railway line: Smolenskaya railway station, 84 km

Implementation period

28 months

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Smolensk Oblast

The total cost of the project

$29M

Organization of lignin processing production (ID 44.4)

Objective of the project

Creation of a new production

Brief description and idea

Construction in Kostroma region of a plant for processing of hydrolytic lignin dumps in the amount of 1.4 million tons

Infrastructure support:

1. Electricity, MW: 240
2. Water supply, cubic meters/hour: Depending on technical conditions. Distance from the connection point - 100 m
3. Drainage, cubic meters/hour: Depending on technical conditions. Distance from the insertion point - 100 m
4. Gas supply, cubic meters/hour: no. The Galich-Manturovo-Sharya branch gas pipeline is under construction
5. Nearest federal highway: R-243 Kostroma - Sharya - Kirov - Perm, 2.2 km
6. Railway line availability: privately owned in the immediate vicinity, 50 km

Implementation period

16 months

Project implementation stage

Proposal

Place of implementation

Kostroma Oblast

The total cost of the project

$1.30M

Construction of a vegetable storage (ID 44.3)

NPV
$0.3M
IRR
11.86%
РВР
94.8 months

Objective of the project

Creation of a new production

Brief description and idea

Construction in Kostroma region of a vegetable storage corresponding to the modern standards, for storage and year-round supply of products to consumers

Infrastructure support:

1. Electricity, MW: 220 kV Motordetal substation 220/110/10, free capacity 71
2. Water supply, cubic meters/hour: 55 wells with a total flow rate of 250, free capacity up to 100. Distance from the connection point – 0.3 km
3. Drainage, cubic meters/hour: Discharge through a city collector up to 150, wastewater treatment through a buffer pond equipped with an aeration system with a throughput capacity of up to 900 per year.
4. Gas supply, cubic meters/hour: Kostroma gas station, high pressure, d 159. Free capacity is 1000 years. Distance from the connection point – 0.5 km
5. Nearest federal highway: M-8 "Kholmogory"
6. Railway line availability: Karimovo station, 0.1 km

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$95M

Place of implementation

Kostroma Oblast

The total cost of the project

$57.13M

Organization of modern production of ceramic facade materials (ID 31.18)

NPV
$13M
IRR
37.47%
РВР
60 months

Objective of the project

Creation of a new production.

Brief description and idea

The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.

The planned commissioning date is 2022.

The main raw material is our own raw material source - clays and loams of the Western area of ​​the Bykovsky ceramic clay deposit (up to 50%). Location of the deposit: Belgorod region, Yakovlevsky district, 0.5-1 km. South-west of the city of Stroitel and 3 km from the production site.

The main products are a wide range of ceramic panels (terracotta) for ventilated facades and decorative finishes for any type of building (up to 30 items).

The main consumers of the manufactured products are large and small enterprises of the Belgorod region and other regions of Russia, engaged in the construction industry.

Infrastructure support:

1. Electricity, MW: 17.46
2. Water supply, cubic meters/hour: 4 artesian wells, capacity 120, pumps can be increased to 200; 2 reservoirs, capacity 800; 2 pipelines, d = 100 mm, capacity 360
3. Drainage, cubic meters/hour: 520
4. Gas supply, cubic meters/hour: 500 m3/hour, when replacing the RVD (high pressure reducer), it is possible to increase up to 4000
5. The nearest federal highway: M-2 "Crimea", 2.5 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$18M

Place of implementation

Belgorod Oblast

The total cost of the project

$18M

Construction of a plant for the production of semi-soft and hard cheese (ID 31.16)

NPV
$3M
IRR
10.8%
РВР
100.6 months

Objective of the project

Creation of a new production

Brief description and idea

"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.
The planned commissioning date is 2023.
Requirements for the project site: a land plot of at least 3 hectares for the construction of a production building.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement of Ivnya. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. "

Infrastructure support:

1. The nearest federal highway: M-2 "Crimea", 5.5 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$4.97M

Place of implementation

Belgorod Oblast

The total cost of the project

$4.97M

Construction of a wholesale distribution center (ID 31.11)

NPV
$857K
IRR
11.32%
РВР
112.56 months

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.

The presence of a slaughterhouse for up to 5 cattle or 10 pigs and equipment for intensive cooling and shock freezing will ensure high-quality primary processing of pork and cattle meat, which will significantly increase the competitiveness and profitability of the products.

The planned date for reaching the design capacity is 2022.

The project site is currently an undeveloped land plot with an area of ​​55.9 hectares, 64 km from the city of Belgorod and 26 km from the village of Ivnya (the center of the municipality). The land plot is owned by the Belgorod region.

The construction of engineering and transport infrastructure facilities, driveways, roads and logistics sites, a system of electricity, gas and water supply (increasing the capacity of networks) is envisaged.

The project involves the construction of a warehouse for long-term storage of apples with a total capacity of up to 1500 tons with a sorting workshop (LLC EUROHOLOD, Moscow). Construction of a refrigeration and freezing warehouse (LLC PROFSTAL). Completion of the slaughter shop for up to 5 cattle or 10 pigs (DiPiProm LLC).

The main consumers of the services of the wholesale distribution center are small-scale agricultural producers of the Ivnyansky, Rakityansky, Prokhorovsky districts of the Belgorod region, as well as Bolshesoldatsky, Belovsky, Oboyansky districts of the Kursk region.

Infrastructure support:

1. Electricity, MW: source 1 – PS-35/10 kV "Kochetovka"; power supply according to a temporary scheme with a capacity of 630 kW, TU No.5-199/20284964 dated 12/19/2013.
2. Water supply, cubic meters/hour: possible by drilling wells; to meet the demand of 125, it is necessary to drill 6 water intake wells of 25 (5 working and 1 backup)
3. Gas supply, cubic meters/hour: the source is the GRS of the village of Malye Mayachki (P 0.6 MPa), underground gas pipeline; free peak load 2 – 6.7 thousand; a gas pipeline with a maximum hourly flow rate of 6.6 thousand was connected, TU No. 7566 dated 11/29/2013.
4. The nearest federal highway: M-2 "Crimea", 5.5 km
5. Railway line availability: none

Project implementation stage

Proposal

The need for additional funding

$1.84M

Place of implementation

Belgorod Oblast

The total cost of the project

$1.84M

Construction of new transfer hubs (ID 77.8)

Objective of the project

Creation of a new production.

Brief description and idea

The area of ​​most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.

The construction of technological zones of TPU will be carried out by the investor with subsequent transfer to the city. For TPU projects with separated technological and commercial facilities, the construction of the technological part will be financed from funds received from the sale of development rights to commercial real estate.

26 TPU projects were raffled off. As part of the implementation of these TPU projects, investors will build about 2.0 million square meters. m of total area of ​​real estate objects. The projected volume of private investment may amount to about 160.0 billion rubles.

Project implementation stage

Proposal

The need for additional funding

$7 015.5M

Place of implementation

Moscow

The total cost of the project

$7 015.5M

Biodegradable tableware production (ID 31.10)

NPV
$4M
IRR
15%
РВР
156 months

Objective of the project

Creation of a new production.

Brief description and idea

Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.

Infrastructure support:

1. Electricity, kW: the current KTP-168, powered by line 10000, has technical specifications for increasing the power to 800
2. Water supply, cubic meters/hour: own well No. 442 (2010) with a depth of 56 meters, filtered column 159 mm, flow rate 12
3. Gas supply, cubic meters/hour: GRPSh-0,5-2U1 is located on the territory of the enterprise, gas is used for heating buildings. Technical conditions allow for an increase in gas supply capacity for production needs
4. The nearest federal highway: 14K-4 "Belgorod-Grayvoron-Kozinka". The abutment to the road is asphalt. The access roads at the industrial site are tiled for loading for freight transport
5. Railway line availability: none

Project implementation stage

Proposal

The need for additional funding

$2.9M

Place of implementation

Belgorod Oblast

The total cost of the project

$2.9M

Creation of an all-season multifunctional, eco-educational, and recreational tourist complex (ID 50.39)

NPV
$13M
IRR
56%
РВР
44.3 months

Objective of the project

Creation of a new production.

Brief description and idea

A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:
- five-star "Zoo-Safari" style hotel with panoramic glazing;
- a glass multi-hall restaurant;
- "Zoo Water Park" with a fitness and spa center in a glass building with a similar congress center;
- "The International Children's Academy of Ecology and Zoology"
- and other infrastructure facilities of the modern tourism industry
"The International Children's Academy of Ecology and Zoology, located near Moscow Safari Park, will contribute to the ecological and patriotic education of the youth.

Infrastructure support:

1. Electricity, MW: it is possible to connect to a high-voltage transmission line
2. Water supply, cubic meters/hour: installation of own well
3. Drainage, cubic meters/hour: sewage treatment plants are available along the border of the site
4. Gas supply, cubic meters/hour: medium-pressure gas pipeline along the site boundary is available
5. The nearest federal highway: M-2 "Crimea"; A-113 "TsKAD", less than 3 km

Implementation period

27 months

Project implementation stage

Proposal

The need for additional funding

$12.21M

Place of implementation

Moscow Oblast, Chekhov district, Meshcherskoye area

The total cost of the project

$12.21M

Construction of a congress and exhibition complex (ID 50.38)

Objective of the project

Creation of a new production.

Brief description and idea

An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilities.

Infrastructure support:

1. Electricity, MW: requires 32.93
2. Water supply, cubic meters/hour: requires 1553
3. Drainage, cubic meters/hour: requires 1467
4. Gas supply, cubic meters/hour: requires 15,500
5. Nearest federal highway: planned exit and exit to M-11 "Neva", International Highway
6. Availability of railway line: planned station of the projected "Krasnogorsk-Khimki-Sheremetyevo" LRT

Project implementation stage

Proposal

The need for additional funding

$501M

Place of implementation

Moscow Oblast

The total cost of the project

$501M

Construction of light rail lines (ID 50.37)

РВР
168 months

Objective of the project

Creation of a new production.

Brief description and idea

The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.

Project implementation stage

Proposal

The need for additional funding

$1.50M

Place of implementation

Moscow Oblast

The total cost of the project

$1.50M

Organization of production of electric drives (ID 37.11)

IRR
23%
РВР
5.2 years

Objective of the project

Creation of a new production.

Brief description and idea

Establishment of an enterprise for the production of electric drives.

The main products are electric drives for industrial equipment, pipeline fittings, household appliances, ventilation systems.

Infrastructure support:

1. Electricity, MW: 8
2. Water supply, cubic meters/hour: 550
3. Drainage, cubic meters/hour: 160
4. Gas supply, cubic meters/hour: none
5. Railway line availability: 4,000
6. Nearest federal highway: M-7 "Volga", 100 km

Project implementation stage

Proposal

The need for additional funding

$20.04M

Place of implementation

Ivanovo Oblast

The total cost of the project

$20.04M

Production of components for specialized machinery (ID 37.10)

IRR
21%
РВР
5.5 years

Objective of the project

Creation of a new production.

Brief description and idea

The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.

Infrastructure support:

1. Electricity, MW: 10
2. Water supply, cubic meters/hour: 35
3. Gas supply, cubic meters/hour: 25
4. Nearest federal highway: M-7 "Volga", 100 km
4. Railway line availability: yes

Project implementation stage

Proposal

The need for additional funding

$8.02M

Place of implementation

Ivanovo Oblast

The total cost of the project

$8.02M

Production of filling and packaging machines (ID 37.9)

IRR
18%
РВР
5.5 years

Objective of the project

Creation of a new production.

Brief description and idea

Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.

Infrastructure support:

1. Electricity, MW: 10
2. Water supply, cubic meters/hour: 35
3. Gas supply, cubic meters/hour: 25
4. Railway line availability: yes
5. Nearest federal highway: M-7 "Volga", 100 km
6. Railway line availability: yes

Project implementation stage

Proposal

The need for additional funding

$9.5M

Place of implementation

Ivanovo Oblast

The total cost of the project

$7.02M

Organization of geotextiles production (ID 37.8)

NPV
$4.4M
IRR
18%
РВР
60 months

Objective of the project

Creation of a new production.

Brief description and idea

An enterprise for the production of geotextiles.

Infrastructure support:

1. Electricity, MW: 8
2. Water supply, cubic meters/hour: 550
3. Drainage, cubic meters/hour: 160
4. Gas supply, cubic meters/hour: yes
6. Nearest federal highway: M-7 "Volga", 100 km

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$32M

Place of implementation

Ivanovo Oblast

The total cost of the project

$24.05M

Organization of production of energy storage systems (ID 37.7)

IRR
27%
РВР
7.4 years

Objective of the project

Creation of a new production.

Brief description and idea

Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.

Infrastructure support:

1. Electricity, MW: 10
2. Water supply, cubic meters/hour: 35
3. Gas supply, cubic meters/hour: 25
4. Nearest federal highway: M-7 "Volga", 100 km
5. Railway line availability: yes

Project implementation stage

Proposal

The need for additional funding

$24M

Place of implementation

Ivanovo Oblast

The total cost of the project

$18.04M

Organization of production of synthetic resins (ID 37.6)

IRR
21%
РВР
84 months

Objective of the project

Creation of a new production.

Brief description and idea

Establishment of an enterprise for the production of synthetic resins.

Infrastructure support:

1. Electricity, MW: 20
2. Water supply, cubic meters/hour: 60
3. Gas supply, cubic meters/hour: 32
4. Nearest federal highway: M-7 "Volga", 100 km
5. Railway line availability: yes

Implementation period

7 years

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Ivanovo Oblast

The total cost of the project

$8.02M

Mini excavators production (ID 37.4)

NPV
$1.7M
IRR
21%
РВР
60 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of an enterprise for the mini excavator's production.

Infrastructure support:

1. Electricity, MW: 10
2. Water supply, cubic meters/hour: 35
3. Gas supply, Gcal/hour: 25
4. Nearest federal highway: M-7 "Volga", 100 km
5. Railway line availability: yes

Implementation period

4 months

Project implementation stage

Proposal

The need for additional funding

$1.6M

Place of implementation

Ivanovo Oblast

The total cost of the project

$1.6M

Manor restoration with adaptations to the chosen function of the site (ID 50.36)

Brief description and idea

Restoration of a cultural heritage site with adaptation to the chosen function of the site.

Infrastructure support:

1. Electricity, MW: conducted
2. Nearest federal highway: M-5 "Ural", 6 km

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Construction of a logistics center (ID 50.34)

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a logistics center in the urban district of Serebryanye Prudy.

Infrastructure support:

1. Electricity, MW: 5.53
2. Nearest federal highway: M-6 "Kaspiy", 300 m

Project implementation stage

Proposal

The need for additional funding

$2M

Place of implementation

Moscow Oblast

The total cost of the project

$2M

Creation of places of application of labor (ID 77.4)

Objective of the project

Creation of a new production

Brief description and idea

The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.

The mechanism for granting benefits (exemption from payment for changing the type of permitted use (VRI) of a land plot) is extended to the creation of not only objects of administrative and business or industrial and production purposes, but also objects of education, science, health and social security, sports, culture, trade , shopping and entertainment facilities, public catering, as well as multifunctional facilities, including all of the above types.

Project implementation stage

Proposal

The need for additional funding

$2 004.4M

Place of implementation

Moscow

The total cost of the project

$2 004.4M

Construction of an international medical cluster (ID 77.3)

Objective of the project

Creation of a new production

Brief description and idea

The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.

The project is being implemented on the principles of PPP, and the leading medical centers of the OECD countries will be involved in the management of MMK facilities.

Infrastructure support:

The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.

Project implementation stage

Proposal

The need for additional funding

$360.8M

Place of implementation

Moscow

The total cost of the project

$360.8M

Construction of a cement plant (ID 44.2)

NPV
$418M
IRR
20.8%
РВР
80 months

Objective of the project

Creation of a new production

Brief description and idea

This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.

Infrastructure support:

1. Power: available;
2. Water: available ;
3. Sewage: available ;
4. Gas: available;
5. The nearest federal highway: 235 km, 8.5 km, 5.5 km.

Project implementation stage

Proposal

The need for additional funding

$210.5M

Place of implementation

Kostroma Oblast

The total cost of the project

$210.5M

Establishment of building materials production (ID 50.33)

Objective of the project

Creation of a new production.

Brief description and idea

Manufacture of finishing products and construction products.

Infrastructure support:

1. Electricity, MW: none
2. Gas supply, cubic meters/hour: none
3. Nearest federal highway: M-1 "Belarus", 24 km; M-9 "Baltia", 42 km
4. The presence of a railway line: none

Project implementation stage

Proposal

The need for additional funding

$3M

Place of implementation

Moscow Oblast

The total cost of the project

$3M

Organization of production of medical textiles (ID 37.3)

NPV
$10M
IRR
19%
РВР
60 months

Objective of the project

Creation of a new production.

Brief description and idea

Enterprise for the production of medical textiles. The main products are functional medical textiles.

Infrastructure support:

1. Electricity, MW: 8
2. Water supply, cubic meters/hour: 550
3. Drainage, cubic meters/hour: 160
4. Gas supply, cubic meters/hour: 4000
5. Nearest federal highway: M-7 "Volga", 100 km
6. Railway line availability: yes

Project implementation stage

Proposal

The need for additional funding

$6.01M

Place of implementation

Ivanovo Oblast

The total cost of the project

$6.01M

Complex development of territories (ID 77.2)

Objective of the project

Creation of a new production

Brief description and idea

The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.

Project implementation stage

Proposal

The need for additional funding

$70.2M

Place of implementation

Moscow

The total cost of the project

$70.2M

Creation of a rabbit farm (ID 31.7)

NPV
$173К
IRR
39.7%
РВР
49.56 months

Objective of the project

Creation of a new production

Brief description and idea

Creation of a rabbit farm located in the Ivnyansky district, Belgorod Oblast
The project involves farming meat rabbits of the California breed. 
The planned date of reaching the projected capacity is 2022.
The project site is currently an undeveloped land plot of 55.9 hectares, 64 km from the city of Belgorod. The land plot is owned by the Belgorod Oblast.
The industrial site has all the necessary engineering infrastructure. 
The distance from the industrial site to the federal highway M-2 "Krym" is 5.5 km.
The main consumers of the project's products are located in the Central Federal District.

Infrastructure support:

1. Electricity, MW: source 1 – PS-35/10 kV "Kochetovka", power supply according to a temporary scheme with a capacity of 630 kW, TU No.5-199/20284964 dated 12/19/2013.
2. Water supply, cubic meters/hour: it is possible by drilling wells, to meet the demand of 125 it is necessary to drill 6 intake wells of 25 (5 working and 1 backup)
3. Gas supply, cubic meters/hour: the source is the GRS of the village of Malye Mayachki (P 0.6 MPa), underground gas pipeline, free peak load of 2 – 6.7 thousand m3/hour, a gas pipeline with a maximum hourly flow rate of 6.6 thousand m3/hour, TU No. 7566 dated 11/29/2013.
4. The nearest federal highway: an asphalt-paved highway runs near the site.

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$210.37М

Place of implementation

Belgorod Oblast

The total cost of the project

$210.37М

Organization of production of charging stations for electric vehicles (ID 37.2)

NPV
$8M
IRR
2%
РВР
72 months

Objective of the project

Creation of a new production.

Brief description and idea

An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.

Infrastructure support:

1. Electricity, MW: 10
2. Water supply, cubic meters/hour: 35
3. Gas supply, Gcal/hour: 25
4. Nearest federal highway: M-7 "Volga", 100 km
5. Railway line availability: yes

Implementation period

8 months

Project implementation stage

Proposal

The need for additional funding

$4.01M

Place of implementation

Ivanovo Oblast

The total cost of the project

$4.01M

Organization of production of automated control and metering stations for electricity (ID 37.1)

NPV
$16M
IRR
31%
РВР
48 months

Objective of the project

Creation of a new production.

Brief description and idea

An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.

Infrastructure support:

1. Electricity, MW: 10
2. Water supply, cubic meters/hour: 35
3. Gas supply, cubic meters/hour: 25
5. Nearest federal highway: M-7 "Volga", 100 km
4. Railway line availability: yes

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$25.05M

Place of implementation

Ivanovo Oblast

The total cost of the project

$47m

Construction and maintenance of an industrial greenhouse complex (ID 67.5)

NPV
$39.2M
IRR
15.6%
РВР
111 months

Objective of the project

Creation of a new production.

Brief description and idea

The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per year.

Infrastructure support:

1. Electricity, MW: 36
2. Gas supply, cubic meters/hour: 62,794
3. Nearest federal highway: M-1 "Belarus", less than 1 km
4. The presence of a railway line: Smolenskaya railway station, 151 km

Implementation period

37 months

Project implementation stage

Proposal

The need for additional funding

$82.1M

Place of implementation

Smolensk Oblast

The total cost of the project

$82.1M

Creation of a broiler poultry farm (ID 67.4)

IRR
31%
РВР
60 months

Objective of the project

Creation of a new production.

Brief description and idea

Investment attraction at the former broiler farm site. Reconstruction of the production and storage site and the launch of a new production facility at the former broiler farm.

Infrastructure support:

1. Electricity, MW: 3.8
2. Gas supply, cubic meters/hour: 13,390
3. Nearest federal highway: M-1 "Belarus", 160 km
4. The presence of a railway line: Smolenskaya railway station, 43 km

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$29M

Place of implementation

Smolensk Oblast

The total cost of the project

$29M

Production of distilled potable alcoholic and non-alcoholic beverages (ID 67.3)

Objective of the project

Creation of a new production.

Brief description and idea

Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distillery.

Infrastructure support:

1. Electricity, MW: 9.89
2. Gas supply, cubic meters/hour: 26,902
3. Nearest federal highway: M-1 "Belarus", 4 km
4. The presence of a railway line: Smolenskaya railway station, 0.5 km

Project implementation stage

Proposal

The need for additional funding

$1.20M

Place of implementation

Smolensk Oblast

The total cost of the project

$1.20M

Construction of a vegetable drying complex project (ID 67.2)

NPV
$45M
IRR
29.2%
РВР
60 months

Objective of the project

Creation of a new production.

Brief description and idea

Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.
Production technology: by dehydration the most efficient in these conditions method of convective drying with the use of automatic raw material processing lines was selected.

Infrastructure support:

1. Electricity, MW: 26
2. Water supply, cubic meters/hour: 685
3. Drainage, cubic meters/hour: 685
4. Gas supply, cubic meters/hour: 495
5. Nearest federal highway: M-1 "Belarus", 7.5 km
6. The presence of a railway line: Smolenskaya railway station, 1 km

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$12.33M

Place of implementation

Smolensk Oblast

The total cost of the project

$12.33M

Production of frozen berry and vegetable crops (ID 31.4)

NPV
$2.3M
IRR
31.17%
РВР
64.56 months

Objective of the project

Creation of a new production

Brief description and idea

The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.
The project is expected to reach its projected capacity in 2022.
The project site is currently an undeveloped land plot with an area of 55,9 hectares, 64 km from Belgorod and 26 km from the settlement Ivnya. The land plot is owned by Belgorod Oblast. The construction of engineering and transport infrastructure facilities, driveways, roads, and logistics sites, as well as electricity, gas, and water supply systems is planned.
The project includes the construction of a long-term storage facility for frozen products with a capacity of up to 5,000 tonnes, a sorting facility, and the purchase of blast freezing equipment.
The main consumers of the project's products are located in the Central Federal District.

Infrastructure support:

1. Power, MW: available:
2. Water, m3/hour: available;
3. Sewage, m3/hour: available;
4. Gas, m3/hour: available;
5. The nearest federal highway: M-2 "Crimea Highway" (5,5 km).

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$5.78M

Place of implementation

Belgorod Oblast

The total cost of the project

$5.78M

Creation of an innovative greenhouse complex for vegetable production (ID 69.5)

Objective of the project

Creation of a new production.

Brief description and idea

The project of a high-tech greenhouse complex for growing protected soil vegetable products, which is expected to be implemented in three stages. The first stage: the construction of a complex with an industrial area of 3 hectares. The second and third stages are the construction of a complex with an industrial area of 6 and 6 hectares, respectively. The investment project provides for the use of advanced innovative equipment and technologies. The created greenhouse complex will create 67 new jobs at the first stage of the project implementation. During the implementation of the second stage, the number of jobs at the enterprise will increase to 163 people. During the implementation of the third stage, the number of jobs at the enterprise will increase to 251 people.

Infrastructure support:

1. Nearest federal highway: M-10 "Russia", 1.5 km

Implementation period

36 months

Project implementation stage

Proposal

Place of implementation

Tver Oblast

The total cost of the project

$46.11M

Manufacture of complete busbar systems (ID 33.1)

NPV
$45K
IRR
20.8%
РВР
170.16 months

Objective of the project

Creation of a new production

Brief description and idea

The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.

The investment project involves the production of complete busbar systems for power transmission with a degree of protection IP55, IP68.

The main parameters of the products planned for release:
- Bus material: copper or aluminum;
- Degree of protection of the case: IP55, IP68;
- Cast insulation is used as insulation - a compound of our own design (application
No. 2018116892 dated May 18, 2018 for obtaining a patent for the invention "Polyurethane compound of cold curing");
- The size of a standard section of busbar trunking is 3 meters.

Sections of the bus duct (bus duct system) are made using an aluminum or copper bus as a current-carrying element. The busbar section is selected depending on the electrical power transmitted by the system. The design uses a tightly compressed package of insulated busbars, enclosed in a metal or polymer case, depending on the required degree of protection.

Depending on the design and requirements of the consumer, the busbar system can contain up to five independent current-carrying conductors enclosed in one housing. The connection of the consumer of electricity to the busbar system is carried out either with the help of terminal sections of the busbar, which allow taking full power from the busbar, or by power take-offs, each designed for a certain power.

The size of a standard busbar section is 3 meters, which is a multiple of the standard column grid in construction. Also, busbar sections can be made smaller, for ease of routing and installation of the system.

Infrastructure support:

1. Electricity, MW: 0.37
2. Water supply, cubic meters/hour: 8.11
3. Drainage, cubic meters/hour: 8.11
4. Gas supply, cubic meters/hour: 650
5. Nearest federal highway: M-8 "Kholmogory"

Implementation period

12 months

Project implementation stage

Proposal

The need for additional funding

$15.03M

Place of implementation

Vladimir Oblast, Kolchuginsky district, Kolchugino city

The total cost of the project

$15.03M

Construction project for an automated cattle dairy farm (ID 67.1)

IRR
19.2%
РВР
60 months

Objective of the project

Creation of a new production.

Brief description and idea

Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cows.

Infrastructure support:

1. Electricity, MW: 6.19
2. Gas supply, cubic meters/hour: 6 537
3. Nearest federal highway: M-1 "Belarus", 25 km

Project implementation stage

Proposal

The need for additional funding

$1.70M

Place of implementation

Smolensk Oblast

The total cost of the project

$1.70M

Creation of a multifunctional sports complex (ID 50.32)

Objective of the project

Creation of a new production.

Brief description and idea

Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.

Infrastructure support:

1. Electricity, MW: none
2. Gas supply, cubic meters/hour: none
3. Nearest federal highway: M-7 "Volga" 11 km, "MKAD", 15 km
4. The presence of a railway line: none

The need for additional funding

$4M

The total cost of the project

$4M

Construction of a hotel in a ski complex (ID 50.31)

Objective of the project

Creation of a new production.

Brief description and idea

The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.

Infrastructure support:

1. Electricity, MW: own independent 10 kV power line, provides full power supply to the resort
2. Water supply, cubic meters/hour: own water intake unit for domestic drinking water supply of 560 cubic meters/day
3. Drainage, cubic meters/hour: own wastewater treatment facilities of 200 cubic meters/day
4. Gas supply, cubic meters/hour: 1.08
5. Nearest federal highway: MKAD, 45 km; A-104 "Moscow-Dubna", 7 km
6. Railway line availability: none

Project implementation stage

Proposal

The need for additional funding

$3.51M

Place of implementation

Moscow Oblast

The total cost of the project

$3.51M

Dairy farming and milk production (single-cycle farm-complex) (ID 69.3)

Objective of the project

Creation of a new production facility.

Brief description and idea

An investment project for the construction of 3 dairy complexes (farms) for a total herd of up to 10,000 cows, as well as a dairy processing plant. Sources of capital investments are own and borrowed funds raised by the company. Creation of at least 600 jobs, including about 360 on all farms and 240 at the dairy processing plant.

Implementation period

40 months

Project implementation stage

Proposal

Place of implementation

Tver Oblast

The total cost of the project

$120.27M

Establishment of an advanced milk processing production facility (ID 50.30)

IRR
19.5%
РВР
120 months

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.

Infrastructure support:

1. Electricity, MW: to connect the technological equipment, a supply voltage of 380/220 V, ± 5% is required, the electrical network is five–wire L1, L2, L3, N, PE
2. Water supply, cubic meters/hour: hot water - 0.5, cold water - 9
3. Drainage, cubic meters/hour: 9.5
4. Nearest federal highway: A-108 "MBK"; A-107 "MMK"; A-104 "Moscow – Dubna"; R-113 "Moscow – Rogachevo"

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$4.77M

Place of implementation

Moscow Oblast

The total cost of the project

$4.77M

Construction of a plant protection center (ID 50.29)

Objective of the project

Creation of a new production.

Brief description and idea

Market launch of competitive, highly effective products. Field trials of new preparations, evaluation of active ingredients' efficiency, including biological, ecological, and chemical crop protection agents, and new preparative forms. Kashir district.

Infrastructure support:

1. Electricity, MW: 0.15
2. Water supply, cubic meters/hour: 2
3. Drainage, cubic meters/hour: 2
4. Gas supply, cubic meters/hour: 0.3
5. Nearest federal highway: M-4 "Don", 6 km, M-6 "Kaspiy", 6.2 km

Project implementation stage

Proposal

The need for additional funding

$6.51M

Place of implementation

Moscow Oblast

The total cost of the project

$6.51M

Creation of a children’s technopark (ID 50.28)

Objective of the project

Creation of a new production.

Brief description and idea

Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.

Infrastructure support:

1. Electricity, MW: 0.4
2. Water supply, cubic meters/hour: 1D=100mm from the water supply networks of its own water intake unit with the possibility of purchasing an additional volume of drinking water from the Municipal Unitary Enterprise Vodokanal-Service
3. The nearest federal highway: M-2 "Crimea", 2 km
4. Railway line availability: yes

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Moscow Oblast

The total cost of the project

$10M

Recreational theme park (ID 50.27)

РВР
144 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".

Infrastructure support:

1. Electricity, MW: none
2. Water supply, cubic meters/hour: none
3. Drainage, cubic meters/hour: none
4. Gas supply, cubic meters/hour: none
5. Nearest federal highway: M-4 "Don", 15.1 km
6. The presence of a railway line: Shmatovo railway station, 1.6 km

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$8.02M

Place of implementation

Moscow Oblast

The total cost of the project

$8.02M

Construction of a goat farm (ID 50.26)

РВР
84 months

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a goat farm with 6,400 milking goats in Shchelkovo district
Main consumers are milk processing plants in Moscow and the Moscow Oblast (~4 million tonnes/year).

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$10M

Place of implementation

Moscow Oblast

The total cost of the project

$10M

Construction of a sports and recreation complex (ID 50.25)

NPV
$20M
РВР
36 months

Objective of the project

Creation of a new production.

Brief description and idea

The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8,000 m2, with an emphasis on self-service, low prices and high throughput.

Infrastructure support:

1. Electricity, MW: 0.4 available; 1 required
2. Water supply, cubic meters/hour: 2.71 available (HVAC); 3 required (DHW)
3. Drainage, cubic meters/hour: 2.92 available; 2.71 required
4. Gas supply, cubic meters/hour: currently there is no gas supply, 357 is required
5. Nearest federal highway: M-5 "Ural", 15 km

Implementation period

Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)

Project implementation stage

Proposal

The need for additional funding

$1.7M

Place of implementation

Moscow Oblast

The total cost of the project

$3M

Creation of an industrial aquaculture cluster (ID 50.24)

Objective of the project

Creation of a new production.

Brief description and idea

Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky district.

Infrastructure support:

1. Nearest federal highway: A-107 "Moskovskoe Maloe Koltso", 17 km; A-113 "TSKAD", 17 km

Project implementation stage

Proposal

The need for additional funding

$45M

Place of implementation

Moscow Oblast

The total cost of the project

$45M

Creation of an Atlantic salmon farming plant (ID 50.23)

Objective of the project

Creation of a new production.

Brief description and idea

Creation of an Atlantic salmon farming plant in the Kashira urban district.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$40M

Place of implementation

Moscow Oblast

The total cost of the project

$40M

Creation of a modern high-tech swine-breeding complex (ID 69.4)

Objective of the project

Creation of a new production facility.

Brief description and idea

An investment project for the construction of a high-tech meat processing complex, a workshop for the production of compound feeds, a livestock complex, including its own: 5 pig breeding complexes, a breeding and genetic center for 2,500 sows, a workshop for the production of feed up to 150 thousand tons per year, a drying complex, a separation station, a herbal flour workshop, a warehouse complex.

Implementation period

36 months

Project implementation stage

Proposal

Place of implementation

Tver Oblast

The total cost of the project

$46.11M

Construction of a confectionery plant (ID 69.2)

Objective of the project

Creation of a new production facility.

Brief description and idea

Production of breadcrumbs, biscuits and other breadcrumbs, production of flour confectionery, cakes, pastries, pies and biscuits intended for long-term storage. The total planned investment volume for the project is 4.7 billion rubles. Project implementation period: 36 months. Number of jobs created (units): 359.

Implementation period

36 months

Project implementation stage

Proposal

Place of implementation

Tver Oblast

The total cost of the project

$47.11M

Construction of a production and warehouse complex (ID 50.20)

IRR
19,4%
РВР
96 months

Objective of the project

Creation of a new production.

Brief description and idea

Design and construction of a production and warehouse complex in the Mozhaisk city district.

Infrastructure support:

1. Electricity, MW: 3
2. Water supply, cubic meters/hour: 510
3. Drainage, cubic meters/hour: 980
4. Gas supply, cubic meters/hour: 1194
5. Nearest federal highway: M-1 "Belarus", 0 km

Implementation period

14 months – 1st stage, 12 months. – 2nd stage

Project implementation stage

Proposal

The need for additional funding

$35.08M

Place of implementation

Moscow Oblast

The total cost of the project

$35.08M

Construction of an industrial and logistics complex (ID 50.21)

Objective of the project

Creation of a new production.

Brief description and idea

Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.

Infrastructure support:

1. Electricity, MW: 10 with a possible increase
2. Water supply, cubic meters/hour: individual well
3. Gas supply, cubic meters/hour: gas pipeline along the border, but reconstruction of the Yakot gas station is required
5. Nearest federal highway: A-104 "Moscow-Dubna" 03 km; A-108 "MBL"
6. Railway line availability: yes

Project implementation stage

Proposal

The need for additional funding

$30.07M

Place of implementation

Moscow Oblast

The total cost of the project

$30.07M

Construction of a woodworking factory (ID 69.1)

Objective of the project

Creation and development of a modern timber industry enterprise – a woodworking factory.

Brief description and idea

The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging vehicles. By 2027, a modern integrated production facility with a completed cycle of deep wood processing, including the processing of waste into marketable products. Number of jobs created (units): 85.

Infrastructure support:

1. Nearest federal highway: M-11 "Neva"
2. Railway line availability: well-developed railway connection. The distance to Moscow is 170 km, to St. Petersburg is 540 km.

Project implementation stage

Proposal

The need for additional funding

$9.4M

Place of implementation

Tver region

The total cost of the project

$7.01M

Production of MDF boards (ID 44.1)

NPV
$17M
IRR
33.6%
РВР
57.6 months

Objective of the project

Creation of a new production

Brief description and idea

Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.

Infrastructure support:

1. Electricity, MW: FGC networks: Borok substation 220/110/10 kV with an installed capacity of 250, reserve capacity of 200; IDGC networks: substation 110/10 kV Zapadnaya substation, reserve capacity of 4,934
2. Water supply, cubic meters/hour: up to 20, it is possible to build artesian wells
3. Water disposal, cubic meters/hour: construction of local sewage treatment plants
4. Gas supply, cubic meters/hour: inter–settlement gas pipeline AGRS Bui – P. Chistye Bory - P. Susanino of high pressure P < 0.6 MPa (category II) made of steel pipes with a diameter of 426x7.0 according to GOST 10704-91
5. Nearest federal highway: 92.4 km to Kostroma, 11.6 km to the district center, 10.1 km to the railway station, 0.75 km to the highway
6. The presence of a railway line: the access railway, located in close proximity to the border of the land plot

Implementation period

18 months

Project implementation stage

Proposal

The need for additional funding

$33M

Place of implementation

Kostroma Oblast

The total cost of the project

$24.05M

Creation of a complex for the production of cow and buffalo milk (ID 50.19)

NPV
$21M
IRR
5,4%
РВР
156 months

Objective of the project

Creation of a new production.

Brief description and idea

Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.

Implementation period

24 months

Project implementation stage

Proposal

The need for additional funding

$49M

Place of implementation

Moscow Oblast

The total cost of the project

$49M

Construction of transport interchange hub of TPU (ID 50.18)

Objective of the project

Creation of a new production.

Brief description and idea

Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.

Infrastructure support:

1. The presence of a railway line

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$50.11M

Place of implementation

Moscow Oblast

The total cost of the project

$50.11M

Construction of transport interchange hub of TPU (ID 50.17)

Objective of the project

Creation of a new production.

Brief description and idea

The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.

Implementation period

36 months

Project implementation stage

Proposal

The need for additional funding

$134M

Place of implementation

Moscow Oblast

The total cost of the project

$134M

Creation of an agro-industrial technology park (ID 50.16)

Objective of the project

Creation of a new production.

Brief description and idea

A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.

Infrastructure support:

1. Electricity, MW: up to 3
2. Water supply, cubic meters/day: 650
3. Drainage, cubic meters/day: 2000
4. Gas supply, cubic meters/hour: 2,200
5. Nearest federal highway: R-106 "Kurovskoye-Samoilikha", 2 km

Project implementation stage

Proposal

The need for additional funding

$50.8M

Place of implementation

Moscow Oblast

The total cost of the project

$50.8M

Amusement park (ID 50.11)

NPV
$85M
IRR
23%
РВР
101 months

Objective of the project

Creation of a new production.

Brief description and idea

The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.

Infrastructure support:

1. Water supply, cubic meters/hour: 10 401
2. Drainage, cubic meters/hour: 10 401
3. Gas supply, cubic meters/hour: 1,214,000
4. Nearest federal highway: "MKAD", 17 km

Project implementation stage

Proposal

The need for additional funding

$110.24M

Place of implementation

Moscow Oblast

The total cost of the project

$110.24M

Construction of transport interchange hub of TPU (ID 50.9)

NPV
$1M
IRR
21.4%
РВР
7.9 months

Objective of the project

Creation of a new production.

Brief description and idea

Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.

Implementation period

108 months

Project implementation stage

Proposal

Place of implementation

Moscow Oblast

The total cost of the project

$114.25М

Reconstruction of a shopping facility (ID 50.4)

Objective of the project

Creation of a new production.

Brief description and idea

The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.

Infrastructure support:

1. Electricity, kW: there is a substation on the territory of the plant for 800
2. Water supply, cubic meters/hour: yes
3. Drainage, cubic meters/hour: yes
4. Gas supply, cubic meters/hour: none
5. Nearest federal highway: A-108 "MBK", 50 m; M-5 "Ural", 8 km
6. Railway line availability: none

The need for additional funding

$20M

Place of implementation

Moscow Oblast

The total cost of the project

$28M

Construction of an industrial park (ID 50.3)

NPV
$6M
РВР
204 months

Objective of the project

Creation of a new production.

Brief description and idea

An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.

Infrastructure support:

1. Electricity, MW: 40
2. Gas supply, cubic meters/hour: 15,000
3. Nearest federal highway: A-107 "MMK", A-113 "TSKAD", 1 km, M-4 "Don", 13 km, M-2 "Crimea", 28 km
4. The presence of a railway line: none

Implementation period

18 months (for one object)

Project implementation stage

Proposal

The need for additional funding

$675M

Place of implementation

Moscow Oblast

The total cost of the project

$675M

Construction of congress and exhibition, hotel, trade and entertainment infrastructure facilities (ID 50.2)

РВР
5 years

Objective of the project

Creation of a new production.

Brief description and idea

The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure. 

Infrastructure support:

1. Electricity, MW: none
2. Water supply, cubic meters/hour: none
3. Drainage, cubic meters/hour: none
4. Nearest federal highway: M-4 "Don", A-105 "Access road from Moscow to Domodedovo airport", A-107 "MMK", M-2 "Crimea"
5. Railway line availability: none

Project implementation stage

Proposal

The need for additional funding

$5.1B

Place of implementation

Moscow Oblast

The total cost of the project

$5.1B

Production of small aviation aircraft for agricultural use (ID 50.1)

РВР
36-60 months

Objective of the project

Creation of a new production.

Brief description and idea

Development of the "RATAY" aeromobile aircraft complex for agricultural use.

Infrastructure support:

1. Electricity, kW: there is a substation on the territory of the plant for 800
2. Water supply, cubic meters/hour: yes
3. Drainage, cubic meters/hour: yes
4. Gas supply, cubic meters/hour: none
5. Nearest federal highway: A-108 "MBK", 50 m; M-5 "Ural", 8 km

Project implementation stage

Proposal

The need for additional funding

$5.51M

Place of implementation

Moscow Oblast

The total cost of the project

$5.51M
We use cookies to ensure that you have the best possible experience with our website. By continuing to use this website, you agree that we use cookies.
The site collects information about users using Yandex.Metrica.
Accept
Reject