Establishment of an enterprise for the production of surfactants (surfactants) in the Ivanovo region.Brief description and idea
Production of surfactants. The key process determining the competitiveness of a project is R&D and the involvement of engineering centers.Infrastructure support:
1. Electricity, MW: 20Implementation period
4 years oldProject implementation stage
Pre-investmentPlace of implementation
Ivanovo region, village of InevezhThe total cost of the project
$12MObjective of the project
Development of the territory to create a health resort. The basis of rehabilitation and rehabilitation is Sapozhkovsky therapeutic acid peat (mud). The Menek therapeutic mud deposit is located next to the resort area.Brief description and idea
The development of the territory provides for the construction of a mud clinic equipped with modern balneological equipment, a SPA complex, and infrastructure for living, sports, and entertainment. Themed routes include hiking, cycling, and horseback riding. Thematic museums are the museum of the Soviet and Russian writer V.P. Aksenov (Pokrovskoye is the writer's ancestral village), the museum "The History of Sapozhkovsky Mud".Infrastructure support:
1. Electricity, MW: fully meets the needs of the projectProject implementation stage
ProposalPlace of implementation
Ryazan region, Ukholovsky districtThe total cost of the project
$60.2MObjective of the project
Creation of a new production facility.Brief description and idea
The project provides for the construction of a plant for the production of paper for corrugation and cardboard for flat layers.Infrastructure support:
1. Electric power, MVa: 1.44Implementation period
24 monthsProject implementation stage
ProposalPlace of implementation
Bryansk regionThe total cost of the project
$12.73MObjective of the project
Creation of a new production facility.Brief description and idea
The project provides for the construction of two pig breeding complexes for 6,800 sows, with a total capacity of 26,000 tons of marketable pork per year.Infrastructure support:
1. Electricity, MW: 14.8. It is possible to connect. The current power reserve is 14.8MVA (110/35/10 kV Pochepskaya substation)Implementation period
10 monthsProject implementation stage
ProposalPlace of implementation
Bryansk regionThe total cost of the project
$32.18MObjective of the project
Creation of a new production facility.Brief description and idea
The project provides for the construction of a brine cheese production plant, which has the potential for further development and offers consumers high-quality products at competitive prices.Infrastructure support:
1. Electricity, MW: 9.68. It is possible to connect. 110/35/10kV Neruss substation: installed transformer capacity is 16 MVA, current reserve/power deficit for TP8.86 MVAImplementation period
84 monthsProject implementation stage
ProposalPlace of implementation
Bryansk regionThe total cost of the project
$7.76MObjective of the project
Creation of a new production facilityBrief description and idea
The project provides for the construction of a functioning rabbit breeding farm with 18 fattening and breeding buildings, the capacity of one OMK is 1,430 females.Infrastructure support:
1. Electricity, MW: connection point at a distance of 100 mImplementation period
9 monthsProject implementation stage
ProposalPlace of implementation
Bryansk regionThe total cost of the project
$12.35MObjective of the project
Creation of a high-tech production facility for deep grain processing and production of high-value-added products that can be used in various industries.Brief description and idea
Deep processing of grain is necessary to obtain high-quality and more efficient grain components in terms of production. During processing, separation is performed, which releases gluten, starch and other by-products. The development of deep grain processing also helps to reduce the import of many products, as a wide range of products with high added value can be obtained in the process. The project is aimed at achieving the national goal of "Technological leadership" in the field of food security.Infrastructure support:
1. Electricity, MW: 10Implementation period
60 monthsProject implementation stage
ProposalPlace of implementation
Oryol regionThe total cost of the project
$373.5MObjective of the project
Creation of industrial mass (conveyor) production of unmanned aerial vehicles on the scientific and technical base of domestic manufacturers to solve government and industry tasks.Brief description and idea
The "Strategy for the Development of Unmanned Aviation 2030" adopted in Russia indicates that a new branch of the economy has appeared in the country - unmanned aircraft systems (UAS). The production of unmanned aerial vehicles (UAVs) is necessary to meet the needs of customers for advanced technologies and efficient solutions for various applications. The national project "Unmanned Aircraft Systems" (UAS) is dedicated to the creation of a promising independent branch of the economy related to the creation and use of civilian unmanned aerial vehicles (UAVs).Infrastructure support:
1. Nearest federal highway: 54A-1 "Orel-Yefremov"Implementation period
12 monthsProject implementation stage
ProposalPlace of implementation
Oryol regionThe total cost of the project
$18.1MObjective of the project
The laying of intensive long-term plantings and the launch of the project, bringing it to the planned level of payback and profitability.Brief description and idea
This project provides for the organization of a site of intensive perennial crops (apple tree) with a total area of 21.85 hectares using drip irrigation, equipped with modern equipment.Infrastructure support:
1. Power, MW: noImplementation period
84 monthsProject implementation stage
ProposalPlace of implementation
Kursk regionThe total cost of the project
$2.2MObjective of the project
Creation of an efficient enterprise for the production of aerated concrete blocks, as well as meeting consumer demand in the building materials market.Brief description and idea
The enterprise for the production of building materials will include the following facilities:Infrastructure support:
1. Electricity, MW: noneImplementation period
24 monthsProject implementation stage
ProposalPlace of implementation
Kursk region, ShchigryThe total cost of the project
$5.4MObjective of the project
Creation of a modern production of fruit and berry fillers.Brief description and idea
Creation of a modern production facility:Infrastructure support:
1. Power, MW: noneImplementation period
18 monthsProject implementation stage
ProposalPlace of implementation
Kursk region, Kursk regionThe total cost of the project
$12MObjective of the project
Creation of a high-tech complex for deep processing of wheat grain with a processing capacity of 250 thousand tons of grain per year. The final products of deep processing of wheat grains will be: wheat gluten, xanthan gum, feed additive.Brief description and idea
The production complex will allow processing low-liquid grade 4.5 wheat feed grains into products that are highly demanded by the market: wheat gluten, xanthan gum, and protein feed additives. The project will use modern technologies for deep grain processing and industrial biotechnologies using a highly productive new strain of bacteria, Xanthomonas campestris, which uses wheat starch as a breeding medium for bacteria.Infrastructure support:
1. Electricity, MW: noneImplementation period
30 monthsProject implementation stage
ProposalPlace of implementation
Kursk regionThe total cost of the project
$361.4MObjective of the project
Establishment of an enterprise for the production of surfactants (surfactants) in the Ivanovo region.Brief description and idea
Production of surfactants. The key process determining the competitiveness of a project is R&D and the involvement of engineering centers.Infrastructure support:
1. Electricity, MW: 20Implementation period
4 yearsProject implementation stage
ProposalPlace of implementation
Ivanovo region, village of InevezhThe total cost of the project
$7.8MObjective of the project
Opening of a 126-room hotel complex in the Ivanovo region.Brief description and idea
Construction of a hotel complex.Infrastructure support:
1. Electricity, MW: 10Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Ivanovo region, KineshmaThe total cost of the project
$8.7MObjective of the project
Establishment of an enterprise for the production of synthetic fibers and yarns in the Ivanovo region.Brief description and idea
Production of synthetic fibers and yarns. The key process determining the competitiveness of the project is the involvement of engineering centers.Infrastructure support:
1. Electricity, MW: 20Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Ivanovo region, village of InevezhThe total cost of the project
$381.9MObjective of the project
Creation of a biotechnological plant for deep grain processing.Brief description and idea
The project provides for the construction of a biotechnological plant for the deep processing of feed grains to obtain concentrated protein feed products. When reaching its design capacity, the plant will process 150 thousand tons of feed-grade grain, produce 90 thousand tons of concentrated protein products (feed additives with a protein content of at least 60%), which is enough to produce at least 900 thousand tons of compound feeds for intensive livestock farming (poultry, pig farming).Infrastructure support:
1. Electricity, MW: 3Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tambov region. Uvarovo industrial parkThe total cost of the project
$27.7MObjective of the project
Production of Russian hybrids of tomato and cucumber seeds.Brief description and idea
The project provides for the creation of an innovative seed breeding center designed for the production of Russian hybrids of tomato and cucumber seeds, including for light culture for sale to vegetable producers in the region.Infrastructure support:
1. Electricity, MW: not available on the site, it is required to contact the RSO for the organization of technological connectionImplementation period
4 yearsProject implementation stage
ProposalPlace of implementation
Tambov regionThe total cost of the project
$36.1MObjective of the project
Construction of a high-tech logistics center focused on providing comprehensive fulfillment services, including storage, packaging and delivery of goods, for large organizations operating in the field of e-commerce.Brief description and idea
The project for the construction of a high-tech logistics center for the provision of fulfillment services in the territory of the industrial park "Kotovsk", focused on servicing large organizations in the field of electronic commerce.Infrastructure support:
1. Electricity, MW: 2Implementation period
4 yearsProject implementation stage
ProposalPlace of implementation
Tambov region, industrial Park "Kotovsk" Tambov municipal districtThe total cost of the project
$81.9MObjective of the project
Creation of a modern multifunctional complex in the Tambov region, equipped with everything necessary for active recreation and entertainment at any time of the year.Brief description and idea
The project provides for the following key facilities: ski slopes with trails of varying difficulty (skiing, snowboarding, snowmobiling, tubing). The unique project of an artificially raised mountain, combined with the existing landscape, will create comfortable ski trails and ski-out reception areas. It is assumed that the ski complex will have a total length of more than 6 km, a height difference of 170 m, and 12 slopes of three categories; a ski and biathlon complex; an ice palace with two arenas for figure skating, ice hockey, and ice skating training for children, as well as hockey tournaments. Children's entertainment is one of the important factors in choosing a place for a family holiday, which is why the construction of a children's sports and entertainment town is envisaged. In summer, aquazones, tennis courts, volleyball, basketball courts, roller-skating trails, fishing, hiking and water tours will be open.Infrastructure support:
1. Electricity, MW: requires study with the initiator of the projectProject implementation stage
ProposalPlace of implementation
Tambov regionThe total cost of the project
$110.8MObjective of the project
Creation of a modern enterprise for the production of ready-made dosage forms, for their sale both in the territory of the Russian Federation and abroad.Brief description and idea
Construction of a factory for the production of ready-made dosage forms to ensure the drug safety of state and municipal healthcare organizations. Provision of the necessary medicines from our own production, widely used in medicine in the provision of first aid, as well as to meet the needs of patients with medicines included in the list of essential medicines approved by the Government of the Russian Federation.Infrastructure support:
1. Electricity, MW: yes, according to the investor's requestProject implementation stage
ProposalPlace of implementation
Kaluga region. Special economic zone industrial production type "KALUGA"The total cost of the project
$36.1MObjective of the project
Creation of a modern enterprise for the production of knitted fabric to cover the shortage of good quality knitted fabric in the Russian Federation, import substitution.Brief description and idea
The project provides for the construction of a factory for the production of knitted fabrics, with a universal production line that allows for rapid conversion to new types of products.Infrastructure support:
1. Electricity, MW: yes, according to the investor's requestProject implementation stage
ProposalPlace of implementation
Kaluga region, Industrial park "Kondrovo"The total cost of the project
$60.2MObjective of the project
Construction of a greenhouse complex for the year-round production of rose seedlings and the cultivation of cut roses.Brief description and idea
Cultivation of the most popular varieties of roses and the introduction of new ones as a mother material, as well as the sale of roses on the cut. It is a kind of test of the variety for resistance to diseases, attractiveness to the buyer and yield. The cultivation of varietal planting material will make planting material more accessible to consumers, namely for greenhouse plants specializing in the cultivation of cut roses.Infrastructure support:
1. Electricity, MW: up to 50Project implementation stage
ProposalPlace of implementation
Kaluga region, Sukhinichi districtThe total cost of the project
$144.6MObjective of the project
Creation of a modern enterprise for processing fruit and vegetable products.Brief description and idea
The project provides for the construction of a modern enterprise for processing fruit and vegetable products to produce products such as purees, juices, jams, jams and other products. When reaching its design capacity, the enterprise will process 250 thousand tons of fruit and vegetable raw materials. The priority type of raw materials is apples.Infrastructure support:
1. Electricity, MW: 2Implementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Tambov region, industrial park "Kotovsk" Tambov municipal districtThe total cost of the project
$6MObjective of the project
Production of import-substituting products.Brief description and idea
Construction of a plant for the production of electronic components and modules designed for controlled switching of an electrical circuit of electronic, electromechanical and electrotechnical devices and/or their components.Infrastructure support:
1. Power, MW: 1Implementation period
1 yearProject implementation stage
ProposalPlace of implementation
Tula region, special economic zone "Uzlovaya"The total cost of the project
$14.5MObjective of the project
Increase efficiency and reduce the cost of transportation and logistics services.Brief description and idea
Construction and operation of a multifunctional cargo processing terminal. Terminal processing of containers, container storage, railway container shipping services, storage of frozen products, cargo work on frozen products, storage in warehouses, cargo work on pallets in warehouses.Infrastructure support:
1. Electricity, MW: 5Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region. Uzlovaya Special Economic ZoneThe total cost of the project
$84.3MObjective of the project
Production of import-substituting medical equipment in the Russian Federation.Brief description and idea
Construction and production of medical diagnostic equipment - ultrasound machines of all types, X-rays. The products planned for development and production are intended to provide medical equipment for state medical and preventive institutions.Infrastructure support:
1. Electricity, MW: 3Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region, special economic zone "Uzlovaya"The total cost of the project
$33.7MObjective of the project
Launching new products on the market.Brief description and idea
The processing of lubricants that have passed the period of operation using environmentally friendly technologies.Infrastructure support:
1. Electricity, MW: 5Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region. Uzlovaya Special Economic ZoneThe total cost of the project
$38.6MObjective of the project
Production of import-substituting products.Brief description and idea
Recycling of waste paper for the subsequent production of corrugated cardboard.Infrastructure support:
1. Electricity, MW: 3Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region. Uzlovaya Special Economic ZoneThe total cost of the project
$48.2MObjective of the project
Increasing the investment attractiveness of the region, creating comfortable conditions for doing business.Brief description and idea
The construction of a technopark in the Tula region to accommodate enterprises and individual entrepreneurs who organize and develop activities in the field of industrial production and/or innovation.Infrastructure support:
1. Power, MW: 20 MWImplementation period
1 yearProject implementation stage
ProposalPlace of implementation
Tula region, VenevThe total cost of the project
$50.6MObjective of the project
Increasing the investment attractiveness of the region, creating comfortable conditions for doing business.Brief description and idea
The construction of a technopark in the Tula region to accommodate enterprises and individual entrepreneurs who organize and develop activities in the field of industrial production and/or innovation.Infrastructure support:
1. Electricity, MW: 20 MWImplementation period
1 yearProject implementation stage
ProposalPlace of implementation
Tula region, VenevThe total cost of the project
$57.8MObjective of the project
Increased tourist flow, development of territories.Brief description and idea
Organization and development of the Northeast cluster of the tourist territory "Konduki". Creation of tourist infrastructure facilities: hotel complex, guest houses, restaurants, cafes, sports facilities, eco-parks.Infrastructure support:
1. Electricity, MW: 5.6Implementation period
1 yearProject implementation stage
ProposalPlace of implementation
Tula region, Uzlovsky district, Konduki/Romantsev MountainsThe total cost of the project
$82.5MObjective of the project
The creation of a modern wholesale distribution center for agricultural products in the Voronezh Region is a necessary solution to the problem of storing and selling agricultural products of local producers through wholesale and retail trade networks.Brief description and idea
The construction of a wholesale distribution center in the Voronezh Region is an effective mechanism within the framework of import substitution and will allow:Infrastructure support:
1. Electricity, MW: 4Implementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Liskinsky municipal districtThe total cost of the project
$64.1MObjective of the project
The purpose of the project is to build a restaurant in the Voronezh Region. It is planned to create a conceptual restaurant with natural farm cuisine.Brief description and idea
The urgency of building a restaurant is explained by the fact that in 2024 there is an increase in domestic tourism in the Russian Federation, which creates additional demand for restaurant business services, and a shortage of catering outlets after the pandemic crisis. In addition, the trend towards health care is growing as consumers pay more attention to their health and well-being, as well as what they eat. The pandemic has put a new emphasis on health. Due to these two factors, the demand for healthy and eco-friendly dishes is growing in the restaurant industry.Infrastructure support:
1. Electricity, MW: noneImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, VoronezhThe total cost of the project
$0.4MObjective of the project
The purpose of building an equestrian club is determined by the growing demand for sports tourism and the general increase in the involvement of the population in sports events. The implementation of the proposal will allow meeting similar needs of the population of the Voronezh region, as well as numerous tourists staying in the region.Brief description and idea
The Equestrian Club will offer a range of educational and entertainment services, namely:Infrastructure support:
1. Electricity, MW: noneImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Semiluksky municipal districtThe total cost of the project
$0.4MObjective of the project
The purpose of the construction of the sports and entertainment park is determined by the growing demand for sports tourism and the general increase in the involvement of the population in sports events. The implementation of the proposal will allow meeting similar needs of the population of the Voronezh region, as well as numerous tourists staying in the region.Brief description and idea
The sports and entertainment park includesInfrastructure support:
1. Electricity, MW: noneImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Semiluksky municipal districtThe total cost of the project
$0.5MObjective of the project
A modern children's camp needs to respond to the demands of the time: to offer children unique programs, to teach skills and professions in demand on the labor market, and to develop a child's creative skills. This project fulfills an important mission for the socialization and upbringing of children, and is socially responsible.Brief description and idea
The investment proposal provides for the construction of a private children's camp in the Voronezh Region.Infrastructure support:
1. Electricity, MW: reserve of 35 kV substation "Don"Implementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Khokholsky municipal districtThe total cost of the project
$0.7MObjective of the project
The investment proposal provides for the construction of a roadside complex on the M-4 Don highway, which is a key artery in southern Russia.Brief description and idea
Every year, an increasing number of tourists pass through the M-4 Don highway, and there are practically no competitive roadside complexes in the Voronezh Region, so the implementation of this investment proposal in the region is an urgent area.The roadside complex will be able to provide the guests of the region with comfortable recreation areas: rooms equipped with everything necessary, secure Parking, laundry, cafe. The implementation of the investment proposal for the construction of a roadside complex will create conditions for the development of high-quality road services, as well as improve the recreation conditions for residents and guests of the Voronezh region.Infrastructure support:
1. Electricity, MW: TP-70 overhead line poles-10 kVImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Pavlovsky municipal districtThe total cost of the project
$1.4MObjective of the project
The purpose of building the food mall is due to the following factors: - high demand for the products offered (diverse cuisines of the world as fast food outlets in a popular tourist destination); - accessibility; - variety.Brief description and idea
The investment proposal provides for the construction of a food mall (gastronomic center), namely a space with mini-restaurants, cafes, snack bars, pastry shops, shops with national dishes, small shops and shopping malls.Infrastructure support:
1. Electricity, MW: noneImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, VoronezhThe total cost of the project
$1.8MObjective of the project
Due to the absence of such production in the Voronezh Region, an investment proposal is proposed for the creation of a factory for the production of sanitary ware products.Brief description and idea
The high performance of the Voronezh Region in the field of construction, the availability of the necessary raw materials, as well as the absence of competitors and a wide sales market contribute to the creation of a factory for the production of sanitary ceramics.Infrastructure support:
1. Electricity, MW: connection point of 110 sq. m. substation Location – 2800 m from the site boundaryImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Novovoronezh city districtThe total cost of the project
$7.8MObjective of the project
The share of foreign products in the Russian market is more than 85%. It is also worth noting that mostly fish and seafood are imported in frozen form – about 90% of the total import volume. The aim of the project is to create an import-substituting shrimp production facility.Brief description and idea
A shrimp farm is a form of aquaculture that artificially breeds shrimp. The sale of fresh seafood produced near the market remains a promising and important area in the food industry.Infrastructure support:
1. Power, MW: 10 KV overhead power linesImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh Region, Ternovsky municipal districtThe total cost of the project
$9.4MObjective of the project
The construction of a hardware manufacturing plant aims to cover the needs of enterprises in the Voronezh Region and neighboring regions for these products.Brief description and idea
The production of hardware products in the Voronezh region is a promising area, as the main consumers of these products are construction companies, and the construction industry is one of the key industries in the region. The project provides for the production of fasteners and wire.Infrastructure support:
1. Electricity, kW: POWER LINE 10Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, repyevsky municipal districtThe total cost of the project
$10.1MObjective of the project
The investment proposal provides for the construction of a fish farming complex for the cultivation of rainbow trout in closed-loop water supply installations.Brief description and idea
The project provides for the cultivation of 300 tons of fish and its subsequent processing and sale.Infrastructure support:
1. Electricity, MW: noneImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Anninsky municipal districtThe total cost of the project
$11.1MObjective of the project
The creation of our own factory for the production of solutions for contact lenses and lenses themselves in Russia will meet the growing demand for these products, reduce dependence on imports and create new jobs.Brief description and idea
It is planned to create a modern factory specializing in the production of high-quality solutions for the care of contact lenses and the contact lenses themselves.Infrastructure support:
1. Electricity, kW: 0.4Implementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Ramonsky municipal districtThe total cost of the project
$11.3MObjective of the project
The purpose of the construction of a thermal complex with the possibility of accommodation in a hotel where wellness services are provided is that there is currently a steady increase in demand for tourist and recreational services, and the implementation of this project will meet similar needs of the population of the Voronezh region and guests of the region.Brief description and idea
The investment proposal provides for the construction and operation of an aquathermal complex in the Voronezh Region, combining recreation and wellness elements accessible to all segments of the population.Infrastructure support:
1. Electricity, MW: connection point of 110 sq. m. substation Location – 2,200 m from the site boundaryImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Novovoronezh city districtThe total cost of the project
$11.5MObjective of the project
Russia's innovation policy, the interest of the state and representatives of the real sector of the economy in the use of unmanned technologies in performing various tasks provide the basis for the development of UAS in the Voronezh Region.Brief description and idea
UAS in the Voronezh region. The project involves the creation of a large regional scientific and production center for testing and competence in the field of UAS development with the production of UAS for civilian purposes.Infrastructure support:
1. Electricity, MW: noneImplementation period
1 yearProject implementation stage
ProposalPlace of implementation
Voronezh region, Semiluksky municipal districtThe total cost of the project
$17MObjective of the project
Despite the fact that 85% of the country's feed is of domestic production, the production of premium—class and, more importantly, veterinary feed is poorly developed in the Russian Federation. The Russian market for ready-made pet food is far from saturated: the prevalence of pet food is still much lower than in developed countries. This indicates that the market has significant growth potential. In this regard, an investment proposal is proposed for the construction of a pet food production plant in the Voronezh Region.Brief description and idea
The project involves the production of dry food for dogs and cats.Infrastructure support:
1. Electricity, MW: noneImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Kashirsky municipal district, Voronezh regionThe total cost of the project
$31.8MObjective of the project
The high performance of the Voronezh Region in the construction sector necessitates the creation of a brick factory, which is one of the most sought-after building materials in Russia.Brief description and idea
It is planned to create an enterprise for the production of ceramic bricks. Modern automated brick production lines make it possible to obtain a diverse range of manufactured products.Infrastructure support:
1. Power MW: TPImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Podgorensky municipal districtThe total cost of the project
$39MObjective of the project
Currently, there is a constant development in the construction of new soybean processing facilities, especially in Central Russia. This Maslenitsa crop has recently demonstrated one of the highest production profitability. The aim of the project is to build a plant for deep processing of high-protein shrovetide crops in the Voronezh Region.Brief description and idea
On the territory of the Voronezh Region, an average of 440-450 thousand tons of soybeans are harvested annually, the main buyers of which are oil processing plants and soybean processing plants. Taking into account the large volume of soybean cultivation in the region, the small number of enterprises engaged in its processing in the region, as well as the development of exports of the Voronezh Region to China and the fact that it is the world's largest consumer of soybeans, the implementation of this investment proposal is relevant.Infrastructure support:
1. Electricity, MW: line VL-6-24 substation No. 1 at a distance of 100 mImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Ostrogozhsky municipal districtThe total cost of the project
$87.3MObjective of the project
The departure of foreign partners froze many promising projects that were planned for implementation. However, Chinese and Turkish manufacturers have replaced European companies. They are not only increasing the supply of their own products to the country, acquiring existing Russian plants, but also building new ones. In this regard, it is proposed to implement an investment proposal for the construction of a plant for the production of large household appliances in the Voronezh region.Brief description and idea
It is planned to create a modern factory for the production of large household appliances such as refrigerators, washing machines, dryers.Infrastructure support:
1. Electricity, MW: noneImplementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Voronezh region, Novousmansky municipal districtThe total cost of the project
$245.3MObjective of the project
Expansion of the product line.Brief description and idea
Construction of a fruit and vegetable processing plant.Infrastructure support:
1. Electricity, MW: 4Implementation period
1 yearProject implementation stage
ProposalPlace of implementation
Tula region, the territory of advanced development "Aleksin"The total cost of the project
$5.8MObjective of the project
Increased tourist flow, development of territories.Brief description and idea
The project involves the construction of a hotel that is part of one of the federal networks.Infrastructure support:
1. Electricity, MW: noneImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula regionThe total cost of the project
$2.4MObjective of the project
Expansion of the product line.Brief description and idea
Construction of production facilities for the cultivation and processing of sugar beet.Infrastructure support:
1. Power, MW: 5 MWImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region, Arsenyevsky districtThe total cost of the project
$7.2MObjective of the project
The possibility of increasing production capacity to enter foreign markets.Brief description and idea
Construction of a modern linear elevator with a one-time storage capacity of 100 thousand tons with equipment for cleaning and drying grain.Infrastructure support:
1. Electricity, MW: noneImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region, Plavsky districtThe total cost of the project
$14.5MObjective of the project
Expansion of the product line.Brief description and idea
Construction of a plant for the production of lacquers, paints, enamels, primers, adhesives, putties, coloring pigments and drying oils.Infrastructure support:
1. Electricity, MW: noneImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region, ShchekinoThe total cost of the project
$25.9MObjective of the project
Import substitution.Brief description and idea
Construction of a new production of components for the repair and modernization of metalworking machines.Infrastructure support:
1. Electricity, MW: 6Implementation period
1 yearProject implementation stage
ProposalPlace of implementation
Tula region, industrial park "Uzlovaya"The total cost of the project
$14.5MObjective of the project
The possibility of increasing production capacity to enter foreign markets.Brief description and idea
Construction of a gypsum stone mining company.Infrastructure support:
1. Electricity, MW: noneImplementation period
1 yearProject implementation stage
ProposalPlace of implementation
Tula region, Venevsky districtThe total cost of the project
$3.6MObjective of the project
Import substitution.Brief description and idea
Production of pharmaceutical substances.Infrastructure support:
1. Electricity, MW: 6.5Implementation period
2 yearsProject implementation stage
ProposalPlace of implementation
Tula region, Kireevsky districtThe total cost of the project
$18.1MObjective of the project
The possibility of increasing production capacity to enter foreign markets.Brief description and idea
Construction of a modern fruit storage facility for fruit storage.Infrastructure support:
1. Power, MW: Substation No. 358 Rebarnaya in the village. Tovarkovsky: current capacity reserve: 23.84 mvAImplementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region, Bogoroditsky districtThe total cost of the project
$5.4MObjective of the project
The possibility of increasing production capacity to enter foreign markets.Brief description and idea
Creation of a production facility for deep processing of fruit and vegetable, fruit and berry products and the production of ready meals.Infrastructure support:
1. Electricity, MW: the nearest substation is No. 310 Partizanskaya. Current power reserve: 8.77Implementation period
3 yearsProject implementation stage
ProposalPlace of implementation
Tula region, Uzlovsky districtThe total cost of the project
$34.9MObjective of the project
Creation of a new production.Brief description and idea
The project assumes production of consumer electronics and engineering networks. Production line consists of: a line for the production of printed circuit assemblies, a line for washing and varnishing, a selective soldering oven, a vapor-phase oven with a vacuum.Infrastructure support:
1. Electricity, MWh: 10Project implementation stage
ProposalThe need for additional funding
$70.16MPlace of implementation
Oryol OblastThe total cost of the project
$84.3MObjective of the project
Modernization.Brief description and idea
The project assumes reconstruction of the Hotel Intourist-Yelets: year of construction - 1988, number of rooms - 136, territory of the hotel - 6,042 square meters.Infrastructure support:
1. Electricity, MW: 0.15Project implementation stage
ProposalThe need for additional funding
$8.01MPlace of implementation
Lipetsk OblastThe total cost of the project
$8.01MObjective of the project
Creation of a new production.Brief description and idea
Construction of a plant for the production of vegetable and fruit chips with a production capacity of 40 tons per year.Infrastructure support:
1. Electricity, MW: source 1 – PS-35/10 kV "Kochetovka"; power supply according to a temporary scheme with a capacity of 630 kW, TU No. 5-199/20284964 dated 12/19/2013Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$1.04MPlace of implementation
Belgorod OblastThe total cost of the project
$1.2MObjective of the project
Creation of a new production.Brief description and idea
The project assumes construction of a complex for the production of ready-made frozen pasta with a maximum production capacity of 1,200 tons per month in the village Belovskoe in Belgorod region. Planned commissioning date is March, 2023. Creation of 29 working places with an average salary of 33,4 thousand rubles. Manufacture is planned to be located on the territory of land plot with the cadastral number 31:15:0904001:3793, address: Belgorod region, village Belovskoe, Magistralnaya street, № 16в. In the production of pasta only natural, environmentally friendly ingredients will be used - flour, eggs, spices and water. There is no need to use any preservatives, flavourings and colorants - the production and storage technology allows to save mineral-vitamin complex for 2 years.Infrastructure support:
1. Electricity, MW: 1Implementation period
14 monthsProject implementation stage
ProposalThe need for additional funding
$8.34MPlace of implementation
Belgorod OblastThe total cost of the project
$10MObjective of the project
Creation of a new production.Brief description and idea
Creation of modern production of microcalcite from calcium carbonate for the needs of enterprises of Russian Federation engaged in the production of plastics, polymers, paints and varnishes, linoleum, cable plastic, rubber products, sealants and drilling fluids.Infrastructure support:
1. Electricity, MW: 3.86Project implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Smolensk OblastThe total cost of the project
$3MObjective of the project
Creation of a new production.Brief description and idea
Production of endoprostheses of the knee and hip joints with the potential of 30-40% of imported goods substitution.Infrastructure support:
1. Electricity, MW: 3.86Implementation period
20 monthsProject implementation stage
ProposalThe need for additional funding
$17.04MPlace of implementation
Smolensk OblastThe total cost of the project
$17.04MObjective of the project
Creation of a new production.Brief description and idea
Creation of a transport and logistics complex for 3,000-4,000 vehicles with arrangement of parking and storage places for transport, construction of warehouses and of a training and educational complex for employees.Infrastructure support:
1. Electricity, MW: 4.54Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$13.03MPlace of implementation
Smolensk OblastThe total cost of the project
$13.03MObjective of the project
Creation of a new production.Brief description and idea
Organization of an activity center for IT specialists (a single platform for collaborative work, an "idea generation" center) with the purpose of retaining existing and attracting new qualified personnel for IT companies in Smolensk region, with the option of buying out the cultural center "Youth" (city of Smolensk) for placement of specialists.Infrastructure support:
1. Electricity, MW: 10.31Implementation period
7 monthsProject implementation stage
ProposalThe need for additional funding
$0.95MPlace of implementation
Smolensk OblastThe total cost of the project
$0.95MObjective of the project
Creation of a new production.Brief description and idea
Construction of a flax factory including a factory processing flax straw and a yarn factory. The factory will become a part of a flax cluster. The new production will be aimed at creating high quality competitive products with a focus on import substitution and export. Long and cottonized flax fiber, the most in demand on the market, will be used as a raw material for the production of yarn.Infrastructure support:
1. Electricity, MW: 4.53Implementation period
25 monthsProject implementation stage
ProposalThe need for additional funding
$31.57MPlace of implementation
Smolensk OblastThe total cost of the project
$31.57MObjective of the project
Creation of a new production.Brief description and idea
It is planned to build a factory for cultivating and processing of champignons on the territory of the state industrial park "Phoenix".Infrastructure support:
1. Electricity, MW: 4.53Implementation period
90 monthsProject implementation stage
ProposalThe need for additional funding
$9.22MPlace of implementation
Smolensk OblastThe total cost of the project
$9.22MObjective of the project
Creation of a new production.Brief description and idea
Creation of an enterprise specializing in deep processing of raw materials - wood for the manufacture of products in demand on the territory of the state industrial park "Phoenix".Infrastructure support:
1. Electricity, MW: 10.31Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$1.3MPlace of implementation
Smolensk OblastThe total cost of the project
$1.3MObjective of the project
Creation of a new production.Brief description and idea
Organization of manufacture specializing in deep processing of wood and the sale of manufactured products for export in order to make profit.Infrastructure support:
1. Electricity, MW: 5,48Implementation period
6 monthsProject implementation stage
ProposalThe need for additional funding
$0.7MPlace of implementation
Smolensk OblastThe total cost of the project
$0.7MObjective of the project
Creation of a new production.Brief description and idea
In the result of the project will be constructed a high-tech complex for receiving, cleaning, drying and shipping of grain crops. The complex will allow simultaneous storage of 4 types of crops which, in turn, will allow to sell products at the most optimal prices in different time periods.Infrastructure support:
1. Electricity, MW: 2.1Implementation period
9 monthsProject implementation stage
ProposalThe need for additional funding
$1.45MPlace of implementation
Smolensk OblastThe total cost of the project
$1.45MObjective of the project
Creation of a new production.Brief description and idea
Creation of an all-season recreation complex for residents, tourists and autotourists of Smolensk region and adjacent regions on the territory with a total area of more than 14 hectares, located near Olshansky quarries.Infrastructure support:
1. Electricity, MW: 3.86Implementation period
13 monthsProject implementation stage
ProposalThe need for additional funding
$2.76MPlace of implementation
Smolensk OblastThe total cost of the project
$2.76MObjective of the project
Creation of a new production.Brief description and idea
Creation of a modern high-tech dairy complex for 1200 dairy cows within the available fund of agricultural land in Smolensk region.Infrastructure support:
1. Electricity, MW: 1.36Implementation period
11 monthsProject implementation stage
ProposalThe need for additional funding
$8.62MPlace of implementation
Smolensk OblastThe total cost of the project
$8.62MObjective of the project
Creation of a new production.Brief description and idea
Creation of a full-cycle enterprise for the production of liquid medical oxygen (with the possibility of subsequent gasification) on the territory of the state industrial park "Safonovo".Infrastructure support:
1. Electricity, MW: 6.62Implementation period
10 monthsProject implementation stage
ProposalPlace of implementation
Smolensk OblastThe total cost of the project
$5.61MObjective of the project
Creation of a new production.Brief description and idea
Construction of a plant for the production of autoclaved cellular concrete blocks (gas silicate blocks) on the territory of the state industrial park "Safonovo".Infrastructure support:
1. Electricity, MW: 6.62Implementation period
28 monthsProject implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Smolensk OblastThe total cost of the project
$29MObjective of the project
Creation of a new productionBrief description and idea
Construction in Kostroma region of a plant for processing of hydrolytic lignin dumps in the amount of 1.4 million tonsInfrastructure support:
1. Electricity, MW: 240Implementation period
16 monthsProject implementation stage
ProposalPlace of implementation
Kostroma OblastThe total cost of the project
$1.30MObjective of the project
Creation of a new productionBrief description and idea
Construction in Kostroma region of a vegetable storage corresponding to the modern standards, for storage and year-round supply of products to consumersInfrastructure support:
1. Electricity, MW: 220 kV Motordetal substation 220/110/10, free capacity 71Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$95MPlace of implementation
Kostroma OblastThe total cost of the project
$57.13MObjective of the project
Creation of a new production.Brief description and idea
The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.Infrastructure support:
1. Electricity, MW: 17.46Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$18MPlace of implementation
Belgorod OblastThe total cost of the project
$18MObjective of the project
Creation of a new productionBrief description and idea
"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.Infrastructure support:
1. The nearest federal highway: M-2 "Crimea", 5.5 kmImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$4.97MPlace of implementation
Belgorod OblastThe total cost of the project
$4.97MObjective of the project
Creation of a new production.Brief description and idea
Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.Infrastructure support:
1. Electricity, MW: source 1 – PS-35/10 kV "Kochetovka"; power supply according to a temporary scheme with a capacity of 630 kW, TU No.5-199/20284964 dated 12/19/2013.Project implementation stage
ProposalThe need for additional funding
$1.84MPlace of implementation
Belgorod OblastThe total cost of the project
$1.84MObjective of the project
Creation of a new production.Brief description and idea
The area of most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.Project implementation stage
ProposalThe need for additional funding
$7 015.5MPlace of implementation
MoscowThe total cost of the project
$7 015.5MObjective of the project
Creation of a new production.Brief description and idea
Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.Infrastructure support:
1. Electricity, kW: the current KTP-168, powered by line 10000, has technical specifications for increasing the power to 800Project implementation stage
ProposalThe need for additional funding
$2.9MPlace of implementation
Belgorod OblastThe total cost of the project
$2.9MObjective of the project
Creation of a new production.Brief description and idea
A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:Infrastructure support:
1. Electricity, MW: it is possible to connect to a high-voltage transmission lineImplementation period
27 monthsProject implementation stage
ProposalThe need for additional funding
$12.21MPlace of implementation
Moscow Oblast, Chekhov district, Meshcherskoye areaThe total cost of the project
$12.21MObjective of the project
Creation of a new production.Brief description and idea
An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilities.Infrastructure support:
1. Electricity, MW: requires 32.93Project implementation stage
ProposalThe need for additional funding
$501MPlace of implementation
Moscow OblastThe total cost of the project
$501MObjective of the project
Creation of a new production.Brief description and idea
The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.Project implementation stage
ProposalThe need for additional funding
$1.50MPlace of implementation
Moscow OblastThe total cost of the project
$1.50MObjective of the project
Creation of a new production.Brief description and idea
Establishment of an enterprise for the production of electric drives.Infrastructure support:
1. Electricity, MW: 8Project implementation stage
ProposalThe need for additional funding
$20.04MPlace of implementation
Ivanovo OblastThe total cost of the project
$20.04MObjective of the project
Creation of a new production.Brief description and idea
The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.Infrastructure support:
1. Electricity, MW: 10Project implementation stage
ProposalThe need for additional funding
$8.02MPlace of implementation
Ivanovo OblastThe total cost of the project
$8.02MObjective of the project
Creation of a new production.Brief description and idea
Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.Infrastructure support:
1. Electricity, MW: 10Project implementation stage
ProposalThe need for additional funding
$9.5MPlace of implementation
Ivanovo OblastThe total cost of the project
$7.02MObjective of the project
Creation of a new production.Brief description and idea
An enterprise for the production of geotextiles.Infrastructure support:
1. Electricity, MW: 8Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$32MPlace of implementation
Ivanovo OblastThe total cost of the project
$24.05MObjective of the project
Creation of a new production.Brief description and idea
Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.Infrastructure support:
1. Electricity, MW: 10Project implementation stage
ProposalThe need for additional funding
$24MPlace of implementation
Ivanovo OblastThe total cost of the project
$18.04MObjective of the project
Creation of a new production.Brief description and idea
Establishment of an enterprise for the production of synthetic resins.Infrastructure support:
1. Electricity, MW: 20Implementation period
7 yearsProject implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Ivanovo OblastThe total cost of the project
$8.02MObjective of the project
Creation of a new production.Brief description and idea
Creation of an enterprise for the mini excavator's production.Infrastructure support:
1. Electricity, MW: 10Implementation period
4 monthsProject implementation stage
ProposalThe need for additional funding
$1.6MPlace of implementation
Ivanovo OblastThe total cost of the project
$1.6MBrief description and idea
Restoration of a cultural heritage site with adaptation to the chosen function of the site.Infrastructure support:
1. Electricity, MW: conductedProject implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new production.Brief description and idea
Construction of a logistics center in the urban district of Serebryanye Prudy.Infrastructure support:
1. Electricity, MW: 5.53Project implementation stage
ProposalThe need for additional funding
$2MPlace of implementation
Moscow OblastThe total cost of the project
$2MObjective of the project
Creation of a new productionBrief description and idea
The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.Project implementation stage
ProposalThe need for additional funding
$2 004.4MPlace of implementation
MoscowThe total cost of the project
$2 004.4MObjective of the project
Creation of a new productionBrief description and idea
The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.Infrastructure support:
The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.Project implementation stage
ProposalThe need for additional funding
$360.8MPlace of implementation
MoscowThe total cost of the project
$360.8MObjective of the project
Creation of a new productionBrief description and idea
This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.Infrastructure support:
1. Power: available;Project implementation stage
ProposalThe need for additional funding
$210.5MPlace of implementation
Kostroma OblastThe total cost of the project
$210.5MObjective of the project
Creation of a new production.Brief description and idea
Manufacture of finishing products and construction products.Infrastructure support:
1. Electricity, MW: noneProject implementation stage
ProposalThe need for additional funding
$3MPlace of implementation
Moscow OblastThe total cost of the project
$3MObjective of the project
Creation of a new production.Brief description and idea
Enterprise for the production of medical textiles. The main products are functional medical textiles.Infrastructure support:
1. Electricity, MW: 8Project implementation stage
ProposalThe need for additional funding
$6.01MPlace of implementation
Ivanovo OblastThe total cost of the project
$6.01MObjective of the project
Creation of a new productionBrief description and idea
The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.Project implementation stage
ProposalThe need for additional funding
$70.2MPlace of implementation
MoscowThe total cost of the project
$70.2MObjective of the project
Creation of a new productionBrief description and idea
Creation of a rabbit farm located in the Ivnyansky district, Belgorod OblastInfrastructure support:
1. Electricity, MW: source 1 – PS-35/10 kV "Kochetovka", power supply according to a temporary scheme with a capacity of 630 kW, TU No.5-199/20284964 dated 12/19/2013.Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$210.37МPlace of implementation
Belgorod OblastThe total cost of the project
$210.37МObjective of the project
Creation of a new production.Brief description and idea
An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.Infrastructure support:
1. Electricity, MW: 10Implementation period
8 monthsProject implementation stage
ProposalThe need for additional funding
$4.01MPlace of implementation
Ivanovo OblastThe total cost of the project
$4.01MObjective of the project
Creation of a new production.Brief description and idea
An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.Infrastructure support:
1. Electricity, MW: 10Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$25.05MPlace of implementation
Ivanovo OblastThe total cost of the project
$47mObjective of the project
Creation of a new production.Brief description and idea
The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per year.Infrastructure support:
1. Electricity, MW: 36Implementation period
37 monthsProject implementation stage
ProposalThe need for additional funding
$82.1MPlace of implementation
Smolensk OblastThe total cost of the project
$82.1MObjective of the project
Creation of a new production.Brief description and idea
Investment attraction at the former broiler farm site. Reconstruction of the production and storage site and the launch of a new production facility at the former broiler farm.Infrastructure support:
1. Electricity, MW: 3.8Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$29MPlace of implementation
Smolensk OblastThe total cost of the project
$29MObjective of the project
Creation of a new production.Brief description and idea
Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distillery.Infrastructure support:
1. Electricity, MW: 9.89Project implementation stage
ProposalThe need for additional funding
$1.20MPlace of implementation
Smolensk OblastThe total cost of the project
$1.20MObjective of the project
Creation of a new production.Brief description and idea
Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.Infrastructure support:
1. Electricity, MW: 26Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$12.33MPlace of implementation
Smolensk OblastThe total cost of the project
$12.33MObjective of the project
Creation of a new productionBrief description and idea
The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.Infrastructure support:
1. Power, MW: available:Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$5.78MPlace of implementation
Belgorod OblastThe total cost of the project
$5.78MObjective of the project
Creation of a new production.Brief description and idea
The project of a high-tech greenhouse complex for growing protected soil vegetable products, which is expected to be implemented in three stages. The first stage: the construction of a complex with an industrial area of 3 hectares. The second and third stages are the construction of a complex with an industrial area of 6 and 6 hectares, respectively. The investment project provides for the use of advanced innovative equipment and technologies. The created greenhouse complex will create 67 new jobs at the first stage of the project implementation. During the implementation of the second stage, the number of jobs at the enterprise will increase to 163 people. During the implementation of the third stage, the number of jobs at the enterprise will increase to 251 people.Infrastructure support:
1. Nearest federal highway: M-10 "Russia", 1.5 kmImplementation period
36 monthsProject implementation stage
ProposalPlace of implementation
Tver OblastThe total cost of the project
$46.11MObjective of the project
Creation of a new productionBrief description and idea
The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.Infrastructure support:
1. Electricity, MW: 0.37Implementation period
12 monthsProject implementation stage
ProposalThe need for additional funding
$15.03MPlace of implementation
Vladimir Oblast, Kolchuginsky district, Kolchugino cityThe total cost of the project
$15.03MObjective of the project
Creation of a new production.Brief description and idea
Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cows.Infrastructure support:
1. Electricity, MW: 6.19Project implementation stage
ProposalThe need for additional funding
$1.70MPlace of implementation
Smolensk OblastThe total cost of the project
$1.70MObjective of the project
Creation of a new production.Brief description and idea
Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.Infrastructure support:
1. Electricity, MW: noneThe need for additional funding
$4MThe total cost of the project
$4MObjective of the project
Creation of a new production.Brief description and idea
The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.Infrastructure support:
1. Electricity, MW: own independent 10 kV power line, provides full power supply to the resortProject implementation stage
ProposalThe need for additional funding
$3.51MPlace of implementation
Moscow OblastThe total cost of the project
$3.51MObjective of the project
Creation of a new production facility.Brief description and idea
An investment project for the construction of 3 dairy complexes (farms) for a total herd of up to 10,000 cows, as well as a dairy processing plant. Sources of capital investments are own and borrowed funds raised by the company. Creation of at least 600 jobs, including about 360 on all farms and 240 at the dairy processing plant.Implementation period
40 monthsProject implementation stage
ProposalPlace of implementation
Tver OblastThe total cost of the project
$120.27MObjective of the project
Creation of a new production.Brief description and idea
Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.Infrastructure support:
1. Electricity, MW: to connect the technological equipment, a supply voltage of 380/220 V, ± 5% is required, the electrical network is five–wire L1, L2, L3, N, PEImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$4.77MPlace of implementation
Moscow OblastThe total cost of the project
$4.77MObjective of the project
Creation of a new production.Brief description and idea
Market launch of competitive, highly effective products. Field trials of new preparations, evaluation of active ingredients' efficiency, including biological, ecological, and chemical crop protection agents, and new preparative forms. Kashir district.Infrastructure support:
1. Electricity, MW: 0.15Project implementation stage
ProposalThe need for additional funding
$6.51MPlace of implementation
Moscow OblastThe total cost of the project
$6.51MObjective of the project
Creation of a new production.Brief description and idea
Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.Infrastructure support:
1. Electricity, MW: 0.4Project implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Moscow OblastThe total cost of the project
$10MObjective of the project
Creation of a new production.Brief description and idea
Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".Infrastructure support:
1. Electricity, MW: noneImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$8.02MPlace of implementation
Moscow OblastThe total cost of the project
$8.02MObjective of the project
Creation of a new production.Brief description and idea
Construction of a goat farm with 6,400 milking goats in Shchelkovo districtImplementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$10MPlace of implementation
Moscow OblastThe total cost of the project
$10MObjective of the project
Creation of a new production.Brief description and idea
The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8,000 m2, with an emphasis on self-service, low prices and high throughput.Infrastructure support:
1. Electricity, MW: 0.4 available; 1 requiredImplementation period
Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)Project implementation stage
ProposalThe need for additional funding
$1.7MPlace of implementation
Moscow OblastThe total cost of the project
$3MObjective of the project
Creation of a new production.Brief description and idea
Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky district.Infrastructure support:
1. Nearest federal highway: A-107 "Moskovskoe Maloe Koltso", 17 km; A-113 "TSKAD", 17 kmProject implementation stage
ProposalThe need for additional funding
$45MPlace of implementation
Moscow OblastThe total cost of the project
$45MObjective of the project
Creation of a new production.Brief description and idea
Creation of an Atlantic salmon farming plant in the Kashira urban district.Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$40MPlace of implementation
Moscow OblastThe total cost of the project
$40MObjective of the project
Creation of a new production facility.Brief description and idea
An investment project for the construction of a high-tech meat processing complex, a workshop for the production of compound feeds, a livestock complex, including its own: 5 pig breeding complexes, a breeding and genetic center for 2,500 sows, a workshop for the production of feed up to 150 thousand tons per year, a drying complex, a separation station, a herbal flour workshop, a warehouse complex.Implementation period
36 monthsProject implementation stage
ProposalPlace of implementation
Tver OblastThe total cost of the project
$46.11MObjective of the project
Creation of a new production facility.Brief description and idea
Production of breadcrumbs, biscuits and other breadcrumbs, production of flour confectionery, cakes, pastries, pies and biscuits intended for long-term storage. The total planned investment volume for the project is 4.7 billion rubles. Project implementation period: 36 months. Number of jobs created (units): 359.Implementation period
36 monthsProject implementation stage
ProposalPlace of implementation
Tver OblastThe total cost of the project
$47.11MObjective of the project
Creation of a new production.Brief description and idea
Design and construction of a production and warehouse complex in the Mozhaisk city district.Infrastructure support:
1. Electricity, MW: 3Implementation period
14 months – 1st stage, 12 months. – 2nd stageProject implementation stage
ProposalThe need for additional funding
$35.08MPlace of implementation
Moscow OblastThe total cost of the project
$35.08MObjective of the project
Creation of a new production.Brief description and idea
Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.Infrastructure support:
1. Electricity, MW: 10 with a possible increaseProject implementation stage
ProposalThe need for additional funding
$30.07MPlace of implementation
Moscow OblastThe total cost of the project
$30.07MObjective of the project
Creation and development of a modern timber industry enterprise – a woodworking factory.Brief description and idea
The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging vehicles. By 2027, a modern integrated production facility with a completed cycle of deep wood processing, including the processing of waste into marketable products. Number of jobs created (units): 85.Infrastructure support:
1. Nearest federal highway: M-11 "Neva"Project implementation stage
ProposalThe need for additional funding
$9.4MPlace of implementation
Tver regionThe total cost of the project
$7.01MObjective of the project
Creation of a new productionBrief description and idea
Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.Infrastructure support:
1. Electricity, MW: FGC networks: Borok substation 220/110/10 kV with an installed capacity of 250, reserve capacity of 200; IDGC networks: substation 110/10 kV Zapadnaya substation, reserve capacity of 4,934Implementation period
18 monthsProject implementation stage
ProposalThe need for additional funding
$33MPlace of implementation
Kostroma OblastThe total cost of the project
$24.05MObjective of the project
Creation of a new production.Brief description and idea
Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.Implementation period
24 monthsProject implementation stage
ProposalThe need for additional funding
$49MPlace of implementation
Moscow OblastThe total cost of the project
$49MObjective of the project
Creation of a new production.Brief description and idea
Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.Infrastructure support:
1. The presence of a railway lineImplementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$50.11MPlace of implementation
Moscow OblastThe total cost of the project
$50.11MObjective of the project
Creation of a new production.Brief description and idea
The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.Implementation period
36 monthsProject implementation stage
ProposalThe need for additional funding
$134MPlace of implementation
Moscow OblastThe total cost of the project
$134MObjective of the project
Creation of a new production.Brief description and idea
A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.Infrastructure support:
1. Electricity, MW: up to 3Project implementation stage
ProposalThe need for additional funding
$50.8MPlace of implementation
Moscow OblastThe total cost of the project
$50.8MObjective of the project
Creation of a new production.Brief description and idea
The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.Infrastructure support:
1. Water supply, cubic meters/hour: 10 401Project implementation stage
ProposalThe need for additional funding
$110.24MPlace of implementation
Moscow OblastThe total cost of the project
$110.24MObjective of the project
Creation of a new production.Brief description and idea
Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.Implementation period
108 monthsProject implementation stage
ProposalPlace of implementation
Moscow OblastThe total cost of the project
$114.25МObjective of the project
Creation of a new production.Brief description and idea
The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.Infrastructure support:
1. Electricity, kW: there is a substation on the territory of the plant for 800The need for additional funding
$20MPlace of implementation
Moscow OblastThe total cost of the project
$28MObjective of the project
Creation of a new production.Brief description and idea
An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.Infrastructure support:
1. Electricity, MW: 40Implementation period
18 months (for one object)Project implementation stage
ProposalThe need for additional funding
$675MPlace of implementation
Moscow OblastThe total cost of the project
$675MObjective of the project
Creation of a new production.Brief description and idea
The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure.Infrastructure support:
1. Electricity, MW: noneProject implementation stage
ProposalThe need for additional funding
$5.1BPlace of implementation
Moscow OblastThe total cost of the project
$5.1BObjective of the project
Creation of a new production.Brief description and idea
Development of the "RATAY" aeromobile aircraft complex for agricultural use.Infrastructure support:
1. Electricity, kW: there is a substation on the territory of the plant for 800Project implementation stage
ProposalThe need for additional funding
$5.51MPlace of implementation
Moscow OblastThe total cost of the project
$5.51M