关于行业
项目 0
当前没有符合指定筛选条件的项目。请尝试其他选项。
项目目标
The development of 124,000 m2 area to create the Pokrovskoye mud resort.简要描述和想法
The development involves the construction of medical rehabilitation centers equipped with modern balneological equipment. Construction of infrastructure for living, entertainment, sports. Tourist routes - walking, cycling, horseback riding. Thematic museums - the museum of the writer Vasily Pavlovich Aksenov, the museum “History of Sapozhkovsky Muds”. The basis of rehabilitation is rare Sapozhkovsky medicinal acidic mud.基础设施支持:
Full compliance to the needs of the project.实施期间
60 months需要额外资金
$2B销售地点
Ryazan oblast项目总成本
$2B项目目标
Creation of a new production简要描述和想法
The project assumes the construction of a greenhouse complex with the area of 5 hectares. The aim of the project is to create the production of greenhouse vegetables (cucumbers, tomatoes) on a mineral substrate in year-round greenhouses with the use of additional illumination system on the territory of Oryol region.项目实施阶段
Proposal需要额外资金
$24M销售地点
Oryol Oblast项目总成本
$24M项目目标
Creation of a new production简要描述和想法
Organization of the production of bars made of precision alloys in small batches with a quality exceeding domestic and world analogues in the city of Mtsensk.项目实施阶段
Proposal需要额外资金
$0,2M销售地点
Oryol Oblast项目总成本
$0,2M项目目标
Creation of a new production简要描述和想法
Сonstruction of a mill grinding 2 types of grain with productivity of 150 tons per day项目实施阶段
Proposal需要额外资金
$5,8M销售地点
Oryol Oblast项目总成本
$5,8M项目目标
Creation of a new production简要描述和想法
The object is a building for potatoes storage. Technology of potatoes storage "APH Group" (Netherlands) is based on Omnivent ventilation equipment (Netherlands) and Munters air humidification system (Sweden). All components of the vegetables storage process are compurterized and automated. The APH Group company is a provider of technological equipment and carries out its installation and comissioning works (turnkeys). The maximum one-time volume of stored products is 8,100 tons.项目实施阶段
Proposal需要额外资金
$2M销售地点
Oryol Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
The project assumes construction of a plant for the production of glass products on the territory of the special economic zone Oryol.项目实施阶段
Proposal需要额外资金
$75M销售地点
Oryol Oblast项目总成本
$75M项目目标
Creation of a new production简要描述和想法
Construction of a modern factory for the production of vegetable oils (sunflower, soybean, rapeseed).项目实施阶段
Proposal需要额外资金
$6,1M销售地点
Oryol Oblast项目总成本
$6,1M项目目标
Creation of a new production简要描述和想法
The project assumes construction of a Data centre (Data Processing Centre - DPC). It is created with the purpose of processing and storing of huge amounts of information. The project is implemented taking into account the requirements towards data backup, stability and security of storage and processing of data.项目实施阶段
Proposal需要额外资金
$10M销售地点
Oryol Oblast项目总成本
$10M项目目标
Creation of a new production简要描述和想法
The project assumes production of consumer electronics and engineering networks. Production line consists of: a line for the production of printed circuit assemblies, a line for washing and varnishing, a selective soldering oven, a vapor-phase oven with a vacuum.项目实施阶段
Proposal需要额外资金
$101,7M销售地点
Oryol Oblast项目总成本
$101,7M项目目标
Creation of a new production简要描述和想法
The project assumes creation of block-containers and switchboard equipment production with the highest possible level of factory readiness, with mounted technological equipment and engineering systems.项目实施阶段
Proposal需要额外资金
$0,25M销售地点
Oryol Oblast项目总成本
$0,25M项目目标
Modernization简要描述和想法
The project assumes reconstruction of the Hotel Intourist-Yelets:项目实施阶段
Proposal需要额外资金
$13,3M销售地点
Lipetsk Oblast项目总成本
$13,3M项目目标
Creation of a new production简要描述和想法
Creation of an agro-industrial complex for the production of goat milk and dairy products in Lipetsk region实施期间
18 months项目实施阶段
Proposal需要额外资金
$5,8M销售地点
Lipetsk Oblast项目总成本
$5,8M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of vegetable and fruit chips with a production capacity of 40 tons per year.基础设施支持:
1. Power, MW: source 1 - substation 35/10 kW "Kochetovka", power supply using a temporary scheme - 630 kW, ТУ №5-199/20284964 from 19.12.2013实施期间
8 months项目实施阶段
Proposal需要额外资金
$1,7M销售地点
Belgorod Oblast项目总成本
$1,7M项目目标
Creation of a new production简要描述和想法
The project assumes construction of a complex for the production of ready-made frozen pasta with a maximum production capacity of 1,200 tons per month in the village Belovskoe in Belgorod region. Planned commissioning date is March, 2023. Creation of 29 working places with an average salary of 33,4 thousand rubles. Manufacture is planned to be located on the territory of land plot with the cadastral number 31:15:0904001:3793, address: Belgorod region, village Belovskoe, Magistralnaya street, № 16в. In the production of pasta only natural, environmentally friendly ingredients will be used - flour, eggs, spices and water. There is no need to use any preservatives, flavourings and colorants - the production and storage technology allows to save mineral-vitamin complex for 2 years.基础设施支持:
1. Power, MW: 1 MW实施期间
14 months项目实施阶段
Proposal需要额外资金
$13,9M销售地点
Belgorod Oblast项目总成本
$13,9M项目目标
Creation of a new production简要描述和想法
Creation and development of a modern textile enterprise. The project assumes construction of a knitwear factory, purchase of equipment.项目实施阶段
Proposal需要额外资金
$266,7M销售地点
Tver Oblast项目总成本
$266,7M项目目标
Creation of a new production简要描述和想法
Construction of a modern highly efficient dairy complex with automated processes of manufacture management, with a full processing cycle starting from receiving of raw milk to the shipment of finished product, corresponding to all requirements of technical regulations of the Customs Union, current technological regulatory legal acts, State Standards, Sanitary-epidemiological rules and norms, food and dairy product safety programs and sanitary requirements for the design of dairy industry enterprises.项目实施阶段
Proposal需要额外资金
$35M销售地点
Ivanovo Oblast项目总成本
$35M项目目标
Creation of a new production简要描述和想法
Creation of modern production of microcalcite from calcium carbonate for the needs of enterprises of Russian Federation engaged in the production of plastics, polymers, paints and varnishes, linoleum, cable plastic, rubber products, sealants and drilling fluids项目实施阶段
Proposal需要额外资金
$5M销售地点
Smolensk Oblast项目总成本
$5M项目目标
Creation of a new production简要描述和想法
Production of endoprostheses of the knee and hip joints with the potential of 30-40% of imported goods substitution实施期间
20 months项目实施阶段
Proposal需要额外资金
$28,3M销售地点
Smolensk Oblast项目总成本
$28,3M项目目标
Creation of a new production简要描述和想法
Creation of a transport and logistics complex for 3,000-4,000 vehicles with arrangement of parking and storage places for transport, construction of warehouses and of a training and educational complex for employees实施期间
18 months项目实施阶段
Proposal需要额外资金
$21,7M销售地点
Smolensk Oblast项目总成本
$21,7M项目目标
Creation of a new production简要描述和想法
Organization of an activity center for IT specialists (a single platform for collaborative work, an "idea generation" center) with the purpose of retaining existing and attracting new qualified personnel for IT companies in Smolensk region, with the option of buying out the cultural center "Youth" (city of Smolensk) for placement of specialists实施期间
7 months项目实施阶段
Proposal需要额外资金
$1,6M销售地点
Smolensk Oblast项目总成本
$1,6M项目目标
Creation of a new production简要描述和想法
Construction of a flax factory including a factory processing flax straw and a yarn factory. The factory will become a part of a flax cluster. The new production will be aimed at creating high quality competitive products with a focus on import substitution and export. Long and cottonized flax fiber, the most in demand on the market, will be used as a raw material for the production of yarn.实施期间
25 months项目实施阶段
Proposal需要额外资金
$52,5M销售地点
Smolensk Oblast项目总成本
$52,5M项目目标
Creation of a new production简要描述和想法
It is planned to build a factory for cultivating and processing of champignons on the territory of the state industrial park "Phoenix"实施期间
90 months项目实施阶段
Proposal需要额外资金
$15,3M销售地点
Smolensk Oblast项目总成本
$15,3M项目目标
Creation of a new production简要描述和想法
Creation of an enterprise specializing in deep processing of raw materials - wood for the manufacture of products in demand on the territory of the state industrial park "Phoenix"实施期间
24 months项目实施阶段
Proposal需要额外资金
$1,3M销售地点
Smolensk Oblast项目总成本
$1,3M项目目标
Creation of a new production简要描述和想法
Organization of manufacture specializing in deep processing of wood and the sale of manufactured products for export in order to make profit实施期间
6 months项目实施阶段
Proposal需要额外资金
$0,7M销售地点
Smolensk Oblast项目总成本
$0,7M项目目标
Creation of a new production简要描述和想法
In the result of the project will be constructed a high-tech complex for receiving, cleaning, drying and shipping of grain crops. The complex will allow simultaneous storage of 4 types of crops which, in turn, will allow to sell products at the most optimal prices in different time periods实施期间
9 months项目实施阶段
Proposal需要额外资金
$2,4M销售地点
Smolensk Oblast项目总成本
$2,4M项目目标
Creation of a new production简要描述和想法
Creation of an all-season recreation complex for residents, tourists and autotourists of Smolensk region and adjacent regions on the territory with a total area of more than 14 hectares, located near Olshansky quarries实施期间
13 months项目实施阶段
Proposal需要额外资金
$4,6M销售地点
Smolensk Oblast项目总成本
$4,6M项目目标
Creation of a new production简要描述和想法
Creation of a modern high-tech dairy complex for 1200 dairy cows within the available fund of agricultural land in Smolensk region实施期间
11 months项目实施阶段
Proposal需要额外资金
$14,3M销售地点
Smolensk Oblast项目总成本
$14,3M项目目标
Creation of a new production简要描述和想法
Creation of a full-cycle enterprise for the production of liquid medical oxygen (with the possibility of subsequent gasification) on the territory of the state industrial park "Safonovo"实施期间
10 months项目实施阶段
Proposal需要额外资金
$9,3M销售地点
Smolensk Oblast项目总成本
$9,3M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of autoclaved cellular concrete blocks (gas silicate blocks) on the territory of the state industrial park "Safonovo"基础设施支持:
1. Power, MW: 495 m3/h. Off-site high-pressure gas pipeline networks实施期间
28 months项目实施阶段
Proposal需要额外资金
$48,3M销售地点
Smolensk Oblast项目总成本
$48,3M项目目标
Creation of a new production简要描述和想法
Construction in Kostroma region of a plant for processing of hydrolytic lignin dumps in the amount of 1.4 million tons基础设施支持:
1. Power, MW: FSK networks: substation 500 kW "Zvezda" 220/110/10, power reserve - 240 MW. MRSK networks: substation 110/10 kW, power reserve - 24 MW实施期间
16 months项目实施阶段
Proposal需要额外资金
$1,9M销售地点
Kostroma Oblast项目总成本
$1,9M项目目标
Creation of a new production简要描述和想法
Construction in Kostroma region of a vegetable storage corresponding to the modern standards, for storage and year-round supply of products to consumers实施期间
8 months项目实施阶段
Proposal需要额外资金
$95M销售地点
Kostroma Oblast项目总成本
$95M项目目标
Creation of a new production简要描述和想法
The project assumes construction of a plant for the manufacture of paper for corrugation and cardboard for flat layers基础设施支持:
1. Power, MW: 1,44 MW. There is a possibility of connection. Current power reserve - 1,44 MVA (substation Surazh).实施期间
24 months项目实施阶段
Proposal需要额外资金
$21,2M销售地点
Bryansk Oblast项目总成本
$21,2M项目目标
Creation of a new production简要描述和想法
The project assumes construction of an ultra-modern carbamide-methanol complex applying the most promising technologies - the combined production of ammonia and methanol, followed by the production of carbamide基础设施支持:
1. Power, MW: 3,73 MW. There is a possibility of connection. Current power shortage/reserve - 3,73 MVA (substation 35/10 kV Ruzhnoe)实施期间
120 months项目实施阶段
Proposal需要额外资金
$341,7M销售地点
Bryansk Oblast项目总成本
$341,7M项目目标
Creation of a new production简要描述和想法
The project assumes construction of 2 pig breeding complexes for 6800 sows with a total capacity of 26,000 tons of commercial pork per year基础设施支持:
1. Power, MW: 14,8 MW. There is a possibility of connection. Current power reserve - 14,8 MWA (Substation 110/35/10 kW Pochepskaya)实施期间
10 months项目实施阶段
Proposal需要额外资金
$53,5M销售地点
Bryansk Oblast项目总成本
$53,5M项目目标
Creation of a new production简要描述和想法
The project assumes construction of a plant for the manufacture of pickled cheeses with the potential of futher development and offering consumers high quality products at competitive prices基础设施支持:
1. Power, MW: 9,68 MW. There is a possibility of connection. Substation 110/35/10 kW Nerussa: tranformers capacity - 16 MVA, current power reserve/shortage for the transformer substation - 8,86 MVA.实施期间
84 months项目实施阶段
Proposal需要额外资金
$12,9M销售地点
Bryansk Oblast项目总成本
$12,9M项目目标
Creation of a new production简要描述和想法
Construction of 9 waste management facilities: MSW landfills and waste sorting complexes in the Voronezh region.基础设施支持:
1. Electricity: 6,49 MW;项目实施阶段
Proposal需要额外资金
$2,8M销售地点
Voronezh Oblast项目总成本
$2,8M项目目标
Creation of a new production简要描述和想法
Concession transfer of heat and power facilities (22 municipal boiler houses).项目实施阶段
Proposal需要额外资金
$27M销售地点
Voronezh Oblast项目总成本
$27M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the processing of municipal solid waste using promising methods of recycling waste as material and energy resources.基础设施支持:
1. Power: 8,38 MW;项目实施阶段
Proposal需要额外资金
$52M销售地点
Voronezh Oblast项目总成本
$52M项目目标
Creation of a new production简要描述和想法
Production of disposable tableware from biodegradable plastics on the basis of the existing property complex of Terrakota LLC. The project will use the company's patented technology based on a combination of synthetic polymers (polypropylene, polyethylene) and natural fillers.The planned date for reaching the design capacity is 2025.基础设施支持:
1. Power: available;项目实施阶段
Proposal需要额外资金
$3M销售地点
Belgorod Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
The project involves the creation of the production of LED products as part of the development of the Russian Federation's program for a gradual transition to energy-saving technologies and the abandonment of traditional light sources.基础设施支持:
1. Power: 0,25-14,98 MW;项目实施阶段
Proposal需要额外资金
$36M销售地点
Orlov Oblast项目总成本
$36M项目目标
Creation of a new production简要描述和想法
The complex development of areas is the activity which is implemented for efficacious territory usage and includes documental preparation and submission of land planification of capital construction facilities. Project comprises residential, industrial, social and business purposes which are essential for citizens' life support in communal, transporting and social functionality.项目实施阶段
Proposal需要额外资金
$1B销售地点
Moscow项目总成本
$1B项目目标
Creation of a new production简要描述和想法
The project is to create a sports and health park "thermal springs" of mass public use within the city of Lyubertsy with an area of up to 8000 m2, with an emphasis on self-service, low prices and high throughput.基础设施支持:
1. Power: 0,4 and 1 MW;实施期间
Put into operation on 29.01.2020 (Permit for commissioning RU50-22-15251-2020)项目实施阶段
Proposal需要额外资金
$1,7M销售地点
Moscow Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
The construction of a modern congress and exhibition center in Voronezh will create a platform for major events at the regional, interregional and federal levels.项目实施阶段
Proposal需要额外资金
$27M销售地点
Voronezh Oblast项目总成本
$27M项目目标
Creation of a new production简要描述和想法
The first shopping area on Novoryazanskoye Highway, combining the formats of a grocery hypermarket, DIY, an electronics store, a shopping gallery and a sports hypermarket.基础设施支持:
1. Power, MW: there is a substation for 800 kW on the territory of the plant;需要额外资金
$20M销售地点
Moscow Oblast项目总成本
$28M项目目标
Creation of a new production简要描述和想法
It is planned to create production lines, including the following stages of production:基础设施支持:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;项目实施阶段
Proposal需要额外资金
$13M销售地点
Orlov Oblast项目总成本
$13M项目目标
Creation of a new production简要描述和想法
The project envisages the production of electric stoves with several hermetic levels, using energy-saving technology, as well as the possible production of built-in ovens and built-in hobs.基础设施支持:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;项目实施阶段
Proposal需要额外资金
$47M销售地点
Orlov Oblast项目总成本
$47M项目目标
Creation of a new production简要描述和想法
The International Medical Cluster (IMC) is being created by the Government of Moscow to attract the world's best medical practices and educational technologies to Russia, and to exchange experience between Russian and foreign specialists.基础设施支持:
The territory of the cluster is 60 hectares, and the total building area will exceed 400 thousand square meters. m.项目实施阶段
Proposal需要额外资金
$486M销售地点
Moscow项目总成本
$486M项目目标
Creation of a new production简要描述和想法
The Moscow authorities have been solving the problem of pendulum migration from sleeping areas to the city center, where the largest number of offices is concentrated, for several years. In order to relieve the center, a new format for attracting businesses to the creation of commercial facilities outside the Third Ring Road and the Moscow Ring Road has been implemented in the capital since 2020. Developers of apartment buildings can receive special investment project status and substantial support from the city.项目实施阶段
Proposal需要额外资金
$105M销售地点
Moscow项目总成本
$105M项目目标
Creation of a new production简要描述和想法
Creation of a children's technopark based on the most open spaces with many modern innovative solutions. Children's Technopark is an institution of additional education, where, incl. employees of modern research and production enterprises take part in educational activities.基础设施支持:
1. Power, MW: 0.4;项目实施阶段
Proposal需要额外资金
$10M销售地点
Moscow Oblast项目总成本
$10M项目目标
Creation of a new production简要描述和想法
Creation of a multifunctional sports complex on the territory of the Stroitel stadium with a football center with a main football field with artificial turf, equipped with heating and a training football field (possibly covered), as well as a sports and recreation center with an indoor athletics arena. The creation of a new sports facility will provide the population with sports services, as well as allow the training process to be carried out regardless of weather conditions, and a special modern arena cover (SPURTAN) will provide athletes with a large amount of training work without negative impact on the musculoskeletal system.基础设施支持:
1. The nearest federal highway: M-7 Volga - 11 km, MKAD - 15 km.需要额外资金
$4M项目总成本
$4M简要描述和想法
It is planned to create the production of ceramic refractory products of several types.基础设施支持:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;项目实施阶段
Proposal需要额外资金
$13M销售地点
Orlov Oblast项目总成本
$13M项目目标
Creation of a new production简要描述和想法
"It is planned to create the production of ceramic sanitary ware. The production line consists of:基础设施支持:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;项目实施阶段
Proposal需要额外资金
$60M销售地点
Orlov Oblast项目总成本
$60M项目目标
Creation of a new production简要描述和想法
This regional investment proposal involves the construction of a cement production facility on the territory of the Kostroma Oblast with a capacity of 2.7 million tons of cement per year. The enterprise plans to produce cement grades M-400 and M-500.基础设施支持:
1. Power: available;项目实施阶段
Proposal需要额外资金
$283M销售地点
Kostroma Oblast项目总成本
$283M项目目标
Creation of a new production简要描述和想法
The main goal of the investment project is to organize a modern production of ceramic (terracotta) plates and materials with a capacity of up to 500 thousand m2 of products per year.基础设施支持:
The industrial site has all the necessary engineering infrastructure: power supply, gas supply, water supply and sanitation, access roads and railways. The distance from the industrial site to the Tomarovka railway station is 22 km. The site has storage areas for raw materials and finished products.实施期间
24 months项目实施阶段
Proposal需要额外资金
$24M销售地点
Belgorod Oblast项目总成本
$24M项目目标
Creation of a new production简要描述和想法
It is planned to build an enterprise for the extraction and processing of celestite ores.基础设施支持:
More than 20 deposits of strontium ores with total predicted resources of about 200 million tons have been discovered. In the Tula region, the Tabolskoye deposit has been explored and about 30 ore occurrences have been discovered.项目实施阶段
Proposal需要额外资金
$29M销售地点
Tula Oblast项目总成本
$29M项目目标
Creation of a new production简要描述和想法
It is planned to create the production of clinker tiles. Products are manufactured on a conveyor line. Each of its components is an independent unit, with the possibility of replacement.基础设施支持:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;项目实施阶段
Proposal需要额外资金
$4M销售地点
Orlov Oblast项目总成本
$4M项目目标
Creation of a new production简要描述和想法
The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.基础设施支持:
1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);项目实施阶段
Proposal需要额外资金
$3M销售地点
Orlov Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
The project involves the creation of an enterprise for the production of refractory bricks. The scope of this brick as the main furnace material in civil engineering, municipal infrastructure of settlements, including boiler houses, thermal power plants.基础设施支持:
1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);项目实施阶段
Proposal需要额外资金
$39M销售地点
Orlov Oblast项目总成本
$39M项目目标
Creation of a new production简要描述和想法
It is planned to create the production of panels for industrial housing construction:基础设施支持:
1. Power, MW: 10 MW - design power, 4.7 MW - free power;项目实施阶段
Proposal需要额外资金
$4M销售地点
Orlov Oblast项目总成本
$4M项目目标
Creation of a new production简要描述和想法
The project involves the creation of an enterprise for the production of red brick, which belongs to the group of effective building materials that improve the thermal properties of walls and reduce their thickness. The scope of this brick is for facing works and for ordinary masonry of walls of residential and public buildings.基础设施支持:
1. Power, MW: the substation is located at a distance of about 1.2 km (30 MW);需要额外资金
$3M销售地点
Orlov Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
Manufacture of finishing products and construction products.基础设施支持:
1. The nearest federal highway: M-1 (24 km), M-9 (42 km).项目实施阶段
Proposal需要额外资金
$3M销售地点
Moscow Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
Construction of the first stage of the plant for the production of cement.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
24 months项目实施阶段
Proposal需要额外资金
$600M销售地点
Kaluga Oblast项目总成本
$621M简要描述和想法
Construction of the second stage of the plant for the production of cement.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
12 months项目实施阶段
Proposal需要额外资金
$148M销售地点
Kaluga Oblast项目总成本
$148M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of wood-based sheet materials in order to meet the needs of the domestic market for high-quality and competitive domestic timber and paper products, ensure environmental safety, and sustainably meet public needs for forest resources and services.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
4 months项目实施阶段
Proposal需要额外资金
$304 thousand销售地点
Kaluga Oblast项目总成本
$304К简要描述和想法
Construction of a plant for the production of radio-transparent and radio-absorbing materials基础设施支持:
1. Power, MW: 100;项目实施阶段
Proposal需要额外资金
$27M销售地点
Tula Oblast项目总成本
$27M简要描述和想法
Construction of an enterprise for the extraction of gypsum stone at the Bolokhovsky, Obolensky, Skuratovsky deposits.基础设施支持:
1. Power, MW: 30;项目实施阶段
Proposal需要额外资金
$67M销售地点
Tula Oblast项目总成本
$67M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of varnishes, paints, enamels, primers, adhesives, fillers, coloring pigments and drying oils.基础设施支持:
1. Power, MW: 60;项目实施阶段
Proposal需要额外资金
$13M销售地点
Tula Oblast项目总成本
$13M项目目标
Creation of a new production简要描述和想法
Construction of a modern production facility for the production of knitwear.基础设施支持:
The capacity of the existing infrastructure of the 1st section:实施期间
18 months项目实施阶段
Proposal需要额外资金
$21M销售地点
Kaluga Oblast项目总成本
$21M项目目标
Creation of a new production简要描述和想法
Enterprise for the production of medical textiles. The main products are functional medical textiles.基础设施支持:
1. Power, MW: 8;项目实施阶段
Proposal需要额外资金
$16M销售地点
Ivanov Oblast项目总成本
$8M项目目标
Creation of a new production简要描述和想法
The project provides for the creation on the territory of the Bryansk region of a modern, highly efficient production facility for the production of vials from medical glass of the second hydrolytic class to meet the demand of the pharmaceutical industry in high-quality medical glassware of domestic production.项目实施阶段
Proposal需要额外资金
$3M销售地点
Bryansk Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
Creation of a light rail transport system in Voronezh with elements of accelerated traffic in peripheral areas, with more sparse stops and increased intervals, and with more frequent stops in the middle and central parts基础设施支持:
1. Power: 3,5 MW;项目实施阶段
Proposal需要额外资金
$676M销售地点
Voronezh Oblast项目总成本
$676M项目目标
Creation of a new production简要描述和想法
The project aims to build a plant for the production of automotive components.基础设施支持:
1. Power: on request;实施期间
18 months项目实施阶段
Proposal需要额外资金
$13,5M销售地点
Kaluga Oblast项目总成本
$13,5M项目目标
Creation of a new production简要描述和想法
Development of the "RATAY" aeromobile aircraft complex for agricultural use基础设施支持:
1. Power: MW: 800 KW;项目实施阶段
Proposal需要额外资金
$7,4M销售地点
Moscow Oblast项目总成本
$7,4M项目目标
Creation of a new production简要描述和想法
Creating a company for the production of filling and packaging machines. The main products are filling machines, forming/filling machines, wrapping machines, labeling machines.基础设施支持:
1. Power: 10 MW;项目实施阶段
Proposal需要额外资金
$9,5M销售地点
Ivanovo Oblast项目总成本
$9,5M项目目标
Creation of a new production简要描述和想法
The project creates parts for existing producers of special equipment in the Ivanovo Oblast: mobile cranes, hoists, bulldozers, and excavators.基础设施支持:
1. Power: 10 MW;项目实施阶段
Proposal需要额外资金
$11M销售地点
Ivanovo Oblast项目总成本
$11M项目目标
Creation of a new production简要描述和想法
"The Uzlovaya" Industrial Park was the site of one of Russia's largest car manufacturing projects in 2018, implemented by the Russian division of China's Great Wall Motor Company Limited.基础设施支持:
1. Power: up to 100 MW;项目实施阶段
Proposal需要额外资金
$13,5M销售地点
Tula Oblast项目总成本
$13,5M项目目标
Creation of a new production简要描述和想法
The project involves the production of electric motors designed to convert energy. This type of device transforms electric power into motive power or mechanical work.基础设施支持:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;项目实施阶段
Proposal需要额外资金
$122M销售地点
Oryol Oblast项目总成本
$122M项目目标
Creation of a new production简要描述和想法
The project involves creating a full production cycle for traction electric motors: producing components, assembling, and testing them.基础设施支持:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;项目实施阶段
Proposal需要额外资金
$88M销售地点
Oryol Oblast项目总成本
$88M项目目标
Creation of a new production简要描述和想法
Creation of production of high-temperature composite sealing materials基础设施支持:
1. Power: 100 MW;项目实施阶段
Proposal需要额外资金
$4M销售地点
Tula Oblast项目总成本
$4M项目目标
Creation of a new production简要描述和想法
Organizing increased output of diesel engines with a prospective program of up to 3,000 engines per year at "Tulamashzavod". The project is aimed at reconstructing production facilities and purchasing the necessary equipment to expand production capacity and increase diesel engine output.基础设施支持:
1. Power: 100 MW;项目实施阶段
Proposal需要额外资金
$3M销售地点
Tula Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
Creation of an organization for the production of polymer and composite coatings for aviation, rocket and space, special equipment, and other industries基础设施支持:
1. Power: 100 MW;项目实施阶段
Proposal需要额外资金
$22M销售地点
Tula Oblast项目总成本
$22M项目目标
Creation of a new production简要描述和想法
Creation of a production complex for automotive components in the private and commercial vehicle segments基础设施支持:
1. Power: 100 MW;项目实施阶段
Proposal需要额外资金
$270,3M销售地点
Tula Oblast项目总成本
$270,3M项目目标
Creation of a new production简要描述和想法
Creation of a rabbit farm located in the Ivnyansky district, Belgorod Oblast基础设施支持:
1. Power: available;实施期间
8 months项目实施阶段
Proposal需要额外资金
$280К销售地点
Belgorod Oblast项目总成本
$280К项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of frozen cooked potatoes and potato flakes实施期间
12 months项目实施阶段
Proposal需要额外资金
$62M销售地点
Bryansk Oblast项目总成本
$66M项目目标
Creation of a new production简要描述和想法
The project involves the construction of an ultra-modern greenhouse complex using the latest achievements of the world's crop production in the protected ground.基础设施支持:
1. Power: connectivity available;实施期间
12 months项目实施阶段
Proposal需要额外资金
$25M销售地点
Bryansk Oblast项目总成本
$25M项目目标
Creation of a new production简要描述和想法
Production of pharmaceutical substances基础设施支持:
1. Power, MW: 8;项目实施阶段
Proposal需要额外资金
$27M销售地点
Tula Oblast项目总成本
$27M项目目标
Creation of a new production简要描述和想法
Construction of a complex for advanced processing of wheat grain to produce gluten, bran, amino acids, lactic acid, fodder product, crystalline glucose基础设施支持:
1. Power: 15 MW;实施期间
24 months项目实施阶段
Proposal需要额外资金
$203M销售地点
Voronezh Oblast项目总成本
$203M项目目标
Creation of a new production简要描述和想法
Construction of the production of medical isotope TS99.基础设施支持:
1. Power: 100 MW;项目实施阶段
Proposal需要额外资金
$81M销售地点
Tula Oblast项目总成本
$81M项目目标
Creation of a new production简要描述和想法
When reinforcing prestressed products with K7 ropes, one of the key problems is the insufficient adhesion force of the rope to concrete. When transversely cutting the workpiece into products, rope slippage often occurs, which is manifested by the retraction of the reinforcement deep into the product. This phenomenon has a negative effect on the bearing capacity, so the product, depending on the scale of the problem, is transferred to lower strength groups or cut to smaller lengths for which the stored tension is sufficient, and in some cases even rejected. These problems are completely solved by using the TK10 rope as reinforcement on the BOF lines.基础设施支持:
1. Power, MW: the estimated power of electrical receivers is 2.7 MW,实施期间
9 months项目实施阶段
Proposal需要额外资金
$29M销售地点
Vladimir Oblast, Kameshkovo项目总成本
$29M项目目标
Creation of a new production简要描述和想法
New tool production of ITO-Tulamash JSC.基础设施支持:
1. Power, MW: 100;项目实施阶段
Proposal需要额外资金
$5M销售地点
Tula Oblast项目总成本
$5M项目目标
Creation of a new production简要描述和想法
Construction of a turkey breeding complex基础设施支持:
1. Power: 3,09 MW;实施期间
9 months项目实施阶段
Proposal需要额外资金
$11,4M销售地点
Voronezh Oblast项目总成本
$11,4M项目目标
Creation of a new production简要描述和想法
Construction of a dairy complex in Voronezh Oblast - a loose housing farm for 1,000 dairy cows with a complete herd reproduction cycle, organisation of milk processing and fodder provision基础设施支持:
1. Power: 1,5 MW;实施期间
18 months项目实施阶段
Proposal需要额外资金
$17,6M销售地点
Voronezh Oblast项目总成本
$17,6M项目目标
Creation of a new production简要描述和想法
Creation of a modern and efficient agricultural facility for breeding livestock, milk, and meat production基础设施支持:
1. Power: 2 MW;项目实施阶段
Proposal需要额外资金
$67,6M销售地点
Voronezh Oblast项目总成本
$67,6M项目目标
Creation of a new production简要描述和想法
Construction of a fruit and vegetable storage facility with a capacity of 12,000 tonnes基础设施支持:
1. Power: 5 MW;实施期间
24 months项目实施阶段
Proposal需要额外资金
$3M销售地点
Voronezh Oblast项目总成本
$15M项目目标
Creation of a new production简要描述和想法
The investment project aims to create and commercially operate a high-tech wheat advanced processing complex. The facility will produce the following products: dry wheat gluten, native starch, modified starches, maltodextrin, dry glucose syrup, caramel molasses, and wheat bran-based feedstuff.实施期间
24 months项目实施阶段
Proposal需要额外资金
$209M销售地点
Kursk Oblast项目总成本
$209M项目目标
Creation of a new production简要描述和想法
Construction of a horticultural processing plant实施期间
24 months项目实施阶段
Proposal需要额外资金
$7M销售地点
Voronezh Oblast项目总成本
$7M项目目标
Creation of a new production简要描述和想法
Construction of a breeding and seed-breeding complex in the Voronezh Oblast基础设施支持:
1. Power: 2х6, 3 MW;实施期间
9 months项目实施阶段
Proposal需要额外资金
$3,24M销售地点
Voronezh Oblast项目总成本
$6M项目目标
Creation of a new production简要描述和想法
Creation of super-intensive type gardens基础设施支持:
1. Water: 150-200 m3/h.项目实施阶段
Proposal需要额外资金
$7,4M销售地点
Voronezh Oblast项目总成本
$7,4M项目目标
Creation of a new production简要描述和想法
Construction of a new production of components for the repair and modernization of metalworking machines.基础设施支持:
1. Power, MW: 100;项目实施阶段
Proposal需要额外资金
$675K销售地点
Tula Oblast项目总成本
$675K项目目标
Creation of a new production简要描述和想法
Construction of an all-purpose feed mill with a granary with a capacity of 120,000 tonnes of grain storage基础设施支持:
1. Power: 192 MW;实施期间
18 months项目实施阶段
Proposal需要额外资金
$13,5M销售地点
Voronezh Oblast项目总成本
$13,5M项目目标
Creation of a new production简要描述和想法
Construction of an indoor greenhouse complex in the Voronezh region, producing vegetables all year round and equipped with modern equipment with automated control systems, mineral nutrition, the newest low-volume hydroponic technology with extra lighting, climate control, and a meteorological station基础设施支持:
1. Power: MW: 12.14 MVA;实施期间
9 months项目实施阶段
Proposal需要额外资金
$40,5M销售地点
Voronezh Oblast项目总成本
$40,5M项目目标
Creation of a new production简要描述和想法
The project involves 4 types of products:基础设施支持:
1. Power: MW: 10 kV: located on the land;项目实施阶段
Proposal需要额外资金
$5M销售地点
Oryol Oblast项目总成本
$5M项目目标
Creation of a new production简要描述和想法
Creation of a baby food production facility基础设施支持:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;项目实施阶段
Proposal需要额外资金
$65M销售地点
Oryol Oblast项目总成本
$65M项目目标
Creation of a new production简要描述和想法
An enterprise for the production of control and accounting systems for electricity is being created. The main products are electronic meters, software for remote administration of energy consumption.基础设施支持:
1. Power, MW: 10;实施期间
12 months项目实施阶段
Proposal需要额外资金
$47M销售地点
Ivanov Oblast项目总成本
$47m项目目标
Creation of a new production简要描述和想法
The aim of the project is to start the production of fruit puree for children. All ingredients for production are purchased in the Oryol Oblast from farms and agricultural farms.基础设施支持:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;项目实施阶段
Proposal需要额外资金
$27M销售地点
Oryol Oblast项目总成本
$27M项目目标
Creation of a new production简要描述和想法
Launch of production of distilled potable alcoholic and non-alcoholic beverages at the ready investment site of the former distillery基础设施支持:
1. Power: MW: 600 kW;项目实施阶段
Proposal需要额外资金
$2M销售地点
Smolensk Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
Purchase of an investment site for an automated dairy farm with an automatic milking parlor for 600 cows基础设施支持:
1. The railway line: available;项目实施阶段
Proposal需要额外资金
$2,3M销售地点
Smolensk Oblast项目总成本
$2,3M项目目标
Creation of a new production简要描述和想法
Investment attraction at the former broiler farm site基础设施支持:
1. Power: 3,8 MW;实施期间
36 months项目实施阶段
Proposal需要额外资金
$29M销售地点
Smolensk Oblast项目总成本
$29M项目目标
Creation of a new production简要描述和想法
The creation of a greenhouse complex in Vyazemsky District, Smolensk Oblast, which specializes in year-round cultivation of high-quality tomatoes using "light-culture" technology, with a target sales volume of 11,300 tonnes of tomatoes per year基础设施支持:
1. Power: 36 MW;实施期间
37 months项目实施阶段
Proposal需要额外资金
$84,3M销售地点
Smolensk Oblast项目总成本
$84,3M项目目标
Creation of a new production简要描述和想法
Project for the construction of an import-substituting dried vegetable production facility in the "Phoenix" Industrial Park and commissioning.基础设施支持:
1. Power: 26 MW;实施期间
12 months项目实施阶段
Proposal需要额外资金
$17M销售地点
Smolensk Oblast项目总成本
$17M项目目标
Creation of a new production简要描述和想法
The investment project aims to set up modern production of frozen berry and vegetable crops with a capacity of up to 5,000 tonnes per year.基础设施支持:
1. Power, MW: available:实施期间
12 months项目实施阶段
Proposal需要额外资金
$8M销售地点
Belgorod Oblast项目总成本
$8M项目目标
Creation of a new production简要描述和想法
Production of breadcrumbs, biscuits, and other dry bakery products, production of flour confectionery, cakes, pastries, pies, and biscuits intended for long-term storage.实施期间
36 months项目实施阶段
Proposal需要额外资金
$63,5M销售地点
Tver Oblast项目总成本
$63,5M项目目标
Creation of a new production简要描述和想法
Investment project for the construction of a high-tech meat processing complex, a feed mill, and a livestock breeding complex, including its own five swine-breeding complexes, a breeding and genetic center for 2,500 sows, a feed mill for up to 150,000 tonnes per year, a drying complex, a separation plant, a grass meal facility, and a storage complex. Project implementation period: 36 months. The number of employment places is 790.实施期间
36 months项目实施阶段
Proposal需要额外资金
$62,2M销售地点
Tver Oblast项目总成本
$62,2M项目目标
Creation of a new production简要描述和想法
High-tech greenhouse complex for growing greenhouse vegetables, with three phases of implementation.基础设施支持:
1. The nearest federal highway: M-10 (1,5 km)实施期间
36 months项目实施阶段
Proposal需要额外资金
$62,2M销售地点
Tver Oblast项目总成本
$62,2M项目目标
Creation of a new production简要描述和想法
"The establishment of a hard cheese production facility with a capacity of 684 tonnes per year.基础设施支持:
1. The nearest federal highway: M-2 "Crimea Highway" (5,5 km)实施期间
24 months项目实施阶段
Proposal需要额外资金
$7M销售地点
Belgorod Oblast项目总成本
$7M项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a plant for the production of microcircuits.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
18 months项目实施阶段
Proposal需要额外资金
$25M销售地点
Kaluga Oblast项目总成本
$25M项目目标
Creation of a new production简要描述和想法
An enterprise for the production of charging stations for electric vehicles is being created at the brownfield site. The main products are charging stations for electric vehicles.基础设施支持:
1. Power, MW: 10;实施期间
8 months项目实施阶段
Proposal需要额外资金
$5M销售地点
Ivanov Oblast项目总成本
$5M项目目标
Creation of a new production简要描述和想法
Establishment of an enterprise for the production of energy storage systems. The main products are the segment of energy storage devices for vehicles.基础设施支持:
1. Power, MW: 10;项目实施阶段
Proposal需要额外资金
$24M销售地点
Ivanov Oblast项目总成本
$24M项目目标
Creation of a new production简要描述和想法
The project involves the creation of a new production facility from scratch, specializing in complete busbar systems for power transmission. The project provides for the purchase of advanced imported and Russian equipment. The project is supposed to use modern laboratory equipment to control the quality of the product.基础设施支持:
1. Power, MW: 0.37;实施期间
12 months项目实施阶段
Proposal需要额外资金
$2M销售地点
Vladimir Oblast, Kolchuginsky district, Kolchugino city项目总成本
$2M项目目标
Creation of a new production简要描述和想法
The project involves the creation of a plant for the production of household appliances.基础设施支持:
1. Power, MW: 0.25-14.98;项目实施阶段
Proposal需要额外资金
$21M销售地点
Orlov Oblast项目总成本
$21M项目目标
Creation of a new production简要描述和想法
Logistic controllers and switching equipment are designed to control technological processes. These products are used both in manufacturing (for example, equipment for an automation system designed to monitor and control process processors in the quality control line of tubing, casing and oil and gas pipes) and in household appliances (for example, a washing machine control module).基础设施支持:
1. Power, MW: 0.25;项目实施阶段
Proposal需要额外资金
$54M销售地点
Orlov Oblast项目总成本
$54M项目目标
Creation of a new production简要描述和想法
Establishment of an enterprise for the production of electric drives.基础设施支持:
1. Power, MW: 8;项目实施阶段
Proposal需要额外资金
$27M销售地点
Ivanov Oblast项目总成本
$27M项目目标
Creation of a new production简要描述和想法
Creation of a production facility for the deep processing of horticultural, fruit, berry products and the creation of ready-made meals基础设施支持:
1. Power: up to 100 MW: eventually up to 150 MW;项目实施阶段
Proposal需要额外资金
$38M销售地点
Tula Oblast项目总成本
$38M项目目标
Creation of a new production简要描述和想法
The project aims to create a business from scratch. Foreseen costs are for the lease/purchase of land; construction of facilities for production and storage; transportation; purchase of equipment for lemonade and cider production and bottling; regular delivery of raw materials and containers; marketing strategy for market entry; advertising campaign; training and staff salaries.基础设施支持:
1. Power: 0,25 MW;项目实施阶段
Proposal需要额外资金
$1,5M销售地点
Oryol Oblast项目总成本
$1,5M项目目标
Creation of a new production简要描述和想法
The aim of the project is to open a brewery in the Orel Oblast. Sales are planned in the oblast and neighboring oblasts.基础设施支持:
1. Power: MW: 10 MW - design capacity, 4.7 MW - spare capacity;项目实施阶段
Proposal需要额外资金
$62,2M销售地点
Oryol Oblast项目总成本
$62,2M项目目标
Creation of a new production简要描述和想法
The project involves the construction of a complex for the production and selling of 7,000 ducks per year. The project includes the creation of a processing chain, including the purchase of ducklings, their raising, and further resale.基础设施支持:
1. Power: 30 MW: substation is 1,2 km away;项目实施阶段
Proposal需要额外资金
$300K销售地点
Oryol Oblast项目总成本
$300K项目目标
Creation of a new production简要描述和想法
The implementation of an investment project involves expenses for:基础设施支持:
1. Power: MW:10 kV, on the land;项目实施阶段
Proposal需要额外资金
$110K销售地点
Oryol Oblast项目总成本
$110K项目目标
Creation of a new production简要描述和想法
Construction of an industrial multi-span greenhouse基础设施支持:
1. Power: MW:10 kV, on the land;项目实施阶段
Proposal需要额外资金
$34M销售地点
Oryol Oblast项目总成本
$34M项目目标
Creation of a new production简要描述和想法
Construction in the Voronezh region of a wholesale distribution center for agricultural products, designed to supply potatoes, onions, cabbage, carrots and table beets, storage, pre-sale preparation and delivery of products grown by local producers to retail chains and other trade organizations.基础设施支持:
1. Power, MW: SS 110 kV "Bobrov" 20 km, power reserve 192 MVA;实施期间
18 months项目实施阶段
Proposal需要额外资金
$45M销售地点
Voronezh Oblast项目总成本
$45M项目目标
Creation of a new production简要描述和想法
An element of the Aerotropolis large-scale investment project with an area of 820,000 sq.m., including multifunctional and dry warehouses, industrial buildings, and offices.基础设施支持:
1. Power, MW: 40;实施期间
18 months (for one object)项目实施阶段
Proposal需要额外资金
$675M销售地点
Moscow Oblast项目总成本
$675M项目目标
Creation of a new production简要描述和想法
A multifunctional specialized complex aimed at the development of innovative manufacturing and agricultural production. The creation of the "Osanovo-Dubovoye" agro-industrial park will be a key driver of economic development in the district of Shatura.基础设施支持:
1. Power, 3 MW;项目实施阶段
Proposal需要额外资金
$68,5M销售地点
Moscow Oblast项目总成本
$68,5M项目目标
Creation of a new production简要描述和想法
Creation of an Atlantic salmon farming plant in the Kashira urban district实施期间
24 months项目实施阶段
Proposal需要额外资金
$54M销售地点
Moscow Oblast项目总成本
$54M项目目标
Creation of a new production简要描述和想法
Construction of a wholesale distribution center - the creation of a modern warehouse for the storage of agricultural products, designed to supply 1,500 tons of apples and 1,000 tons of meat, with pre-sale preparation of agricultural products, and a developed infrastructure for unloading and loading.基础设施支持:
1. Power, MW: source 1 - SS-35/10kV "Kochetovka"; electricity was supplied according to a temporary scheme with a capacity of 630 kW, TU No. 5-199 / 20284964 of 12/19/2013;项目实施阶段
Proposal需要额外资金
$26M销售地点
Belgorod Oblast项目总成本
$26M项目目标
Creation of a new production简要描述和想法
Organization of industrial real estate objects in the Tula region (distribution center, fulfillment, temperature warehouse, temporary storage warehouse, etc.).基础设施支持:
1. Power, MW: up to 100 MW (in the future, up to 150 MW);项目实施阶段
Proposal需要额外资金
$40M销售地点
Tula Oblast项目总成本
$40M项目目标
Creation of a new production简要描述和想法
Multifunctional transfer hub "Khimki-2" is designed to streamline the movement of public transport and passengers. The planned transfer hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and reversal areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments.实施期间
108 months项目实施阶段
Proposal需要额外资金
$1B销售地点
Moscow Oblast项目总成本
$1B项目目标
Creation of a new production简要描述和想法
The multifunctional transfer hub "Lyubertsy 1" is designed to streamline the movement of public transport and passengers. The planned transport hub includes the following facilities: a railway station, a suburban passenger transport stop, stopping points for ground public transport of vehicles and settling and turning areas for it, intercepting parking for motor vehicles, commercial and retail facilities, apartments, a hotel.实施期间
36 months项目实施阶段
Proposal需要额外资金
$181M销售地点
Moscow Oblast项目总成本
$181M项目目标
Creation of a new production简要描述和想法
Multifunctional TPU "Podolsk" is designed to streamline the movement of public transport and passengers.基础设施支持:
1. The presence of a railway line实施期间
36 months项目实施阶段
Proposal需要额外资金
$67M销售地点
Moscow Oblast项目总成本
$67M项目目标
Creation of a new production简要描述和想法
Design and construction of a production and warehouse complex in the Mozhaisk city district.基础设施支持:
1. Power, MW: 3;实施期间
14 months – 1st stage, 12 months. – 2nd stage项目实施阶段
Proposal需要额外资金
$47M销售地点
Moscow Oblast项目总成本
$47M项目目标
Creation of a new production简要描述和想法
Creation of the industrial and logistics park "Orudyevo" in the Dmitrovsky urban district.基础设施支持:
1. Power, MW: 10 with a possible increase;项目实施阶段
Proposal需要额外资金
$40M销售地点
Moscow Oblast项目总成本
$40M项目目标
Creation of a new production简要描述和想法
Construction of a logistics center in the urban district of Serebryanye Prudy.基础设施支持:
1. Power, MW: 5.53;项目实施阶段
Proposal需要额外资金
$2M销售地点
Moscow Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
The construction of a section with a length of 74.1 kilometers is planned from the urban district of Podolsk, through the urban district of Domodedovo and the Domodedovo airport, then to Ramenskoye. and Zhukovsky airport. The project includes 16 stopping points, 9 transport hubs, 3 transfers to rail transport and 2 to air transport.项目实施阶段
Proposal需要额外资金
$2M销售地点
Moscow Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
Construction of warehouses. This project involves the construction of warehouses for the storage of cement and finished products of other dry building mixtures. The project offers rooms that meet the requirements for humidity, temperature of storage of mixtures.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
18 months项目实施阶段
Proposal需要额外资金
$1M销售地点
Kaluga Oblast项目总成本
$1M项目目标
Creation of a new production简要描述和想法
The area of most transfer hubs includes technological and commercial zones. The project is planned to be financed by attracting extrabudgetary funds.项目实施阶段
Proposal需要额外资金
$9B销售地点
Moscow项目总成本
$9B项目目标
Creation of a new production简要描述和想法
Construction of a modern fruit storage facility for fruit storage基础设施支持:
1. Power: 8 MW;项目实施阶段
Proposal需要额外资金
$5M销售地点
Tula Oblast项目总成本
$5M项目目标
Creation of a new production简要描述和想法
Organization of industrial real estate objects on the territory of the Tula region (distribution center, production and logistics complex, container hub).基础设施支持:
1. Power, MW 12:项目实施阶段
Proposal需要额外资金
$40M销售地点
Tula Oblast项目总成本
$40M项目目标
Creation of a new production简要描述和想法
Construction of a high-tech farming facility for fresh chilled fish using closed-circuit water technology in the Ramensky district基础设施支持:
1. The nearest federal highway: A-107 (17 km), A-113 (17 km)项目实施阶段
Proposal需要额外资金
$61M销售地点
Moscow Oblast项目总成本
$61M项目目标
Creation of a new production简要描述和想法
Construction of a goat farm with 6,400 milking goats in Shchelkovo district实施期间
24 months项目实施阶段
Proposal需要额外资金
$13,5M销售地点
Moscow Oblast项目总成本
$13,5M项目目标
Creation of a new production简要描述和想法
Market launch of competitive, highly effective products基础设施支持:
1. Power: 0,15 MW;项目实施阶段
Proposal需要额外资金
$9M销售地点
Moscow Oblast项目总成本
$9M项目目标
Creation of a new production简要描述和想法
Construction of a plant in the "Cheese Valley" cheese cluster in the Dmitrovsky district to produce hard and semi-soft cheeses with a capacity of up to 7 tonnes per day.基础设施支持:
1. Power: MW: 380/220 W is needed;实施期间
24 months项目实施阶段
Proposal需要额外资金
$6,4M销售地点
Moscow Oblast项目总成本
$6,4M项目目标
Creation of a new production简要描述和想法
Construction of a robotised dairy farm基础设施支持:
A milking module with free range will be used. A shelter with straw bedding will be built to house the animals. The calves will be housed in special barns.实施期间
11 months项目实施阶段
Proposal需要额外资金
$2,5M销售地点
Kaluga Oblast项目总成本
$2,5M项目目标
Creation of a new production简要描述和想法
Construction of a cattle farm实施期间
6 months项目实施阶段
Proposal需要额外资金
$400K销售地点
Kaluga Oblast项目总成本
$400K项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of food products, a milk processing plant基础设施支持:
1. Power: available;实施期间
6 months项目实施阶段
Proposal需要额外资金
$1,3M销售地点
Kaluga Oblast项目总成本
$1,3M项目目标
Creation of a new production简要描述和想法
Creation of a combined complex for the production of high-quality cow and buffalo milk in the Naro-Fominskiy district, Moscow Oblast. The livestock complex will produce 26,280 tonnes of cow milk and 2,480 tonnes of buffalo milk per year.实施期间
24 months项目实施阶段
Proposal需要额外资金
$66,2M销售地点
Moscow Oblast项目总成本
$66,2M项目目标
Creation of a new production简要描述和想法
The project involves the construction of a working rabbit farm with 18 fattening and rearing houses with a capacity of 1,430 females.基础设施支持:
1. Power: connection point at a distance of 100 m;实施期间
9 months项目实施阶段
Proposal需要额外资金
$17M销售地点
Bryansk Oblast项目总成本
$17M项目目标
Creation of a new production简要描述和想法
Methanol production基础设施支持:
1. Gas, MW: 12.14 MVA;项目实施阶段
Proposal需要额外资金
$1B销售地点
Voronezh Oblast项目总成本
$1B项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a plant for the production of plastic products.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
5 months项目实施阶段
Proposal需要额外资金
$10M销售地点
Kaluga Oblast项目总成本
$10M项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a polymer processing plant.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
18 months项目实施阶段
Proposal需要额外资金
$6M销售地点
Kaluga Oblast项目总成本
$6M项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a plant for the production of woven packaging (raffia).基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
14 months项目实施阶段
Proposal需要额外资金
$1M销售地点
Kaluga Oblast项目总成本
$1M项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a polymer processing plant.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
18 months项目实施阶段
Proposal需要额外资金
$20M销售地点
Kaluga Oblast项目总成本
$20M项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a plant for the production of polymer fibers.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
18 months项目实施阶段
Proposal需要额外资金
$2M销售地点
Kaluga Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
The project involves the construction of a plant for the production of BOPP membraine liner.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
18 months项目实施阶段
Proposal需要额外资金
$16M销售地点
Kaluga Oblast项目总成本
$16M项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a plant for the production of polyethylene film.基础设施支持:
1. Power, MW: provided in the required volumes;实施期间
18 months项目实施阶段
Proposal需要额外资金
$2M销售地点
Kaluga Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
Establishment of an enterprise for the production of synthetic resins.基础设施支持:
1. Power, MW: 20;实施期间
7 years项目实施阶段
Proposal需要额外资金
$10M销售地点
Ivanov Oblast项目总成本
$10M项目目标
Creation of a new production简要描述和想法
Investment project for the construction of three dairy complexes (farms) with a total herd size of up to 10,000 cows, as well as a milk processing plant实施期间
40 months项目实施阶段
Proposal需要额外资金
$162,2M销售地点
Tver Oblast项目总成本
$162,2M项目目标
Creation of a new production简要描述和想法
Construction of a dairy farm基础设施支持:
1. Power: 8 MW;项目实施阶段
Proposal需要额外资金
$27M销售地点
Tula Oblast项目总成本
$27M项目目标
Creation of a new production简要描述和想法
Project for the construction of a plant for the deep processing of coarse grains to produce amino acids and other functional additives for the agricultural and food industries基础设施支持:
1. Power: 9 MW;项目实施阶段
Proposal需要额外资金
$39,2M销售地点
Tula Oblast项目总成本
$39,2M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of acetic acid by fermentation and chemical processing of products from destructive distillation of wood基础设施支持:
1. Power: 60 MW;项目实施阶段
Proposal需要额外资金
$40,5M销售地点
Tula Oblast项目总成本
$40,5M项目目标
Creation of a new production简要描述和想法
The investment project aims to increase the production of livestock products (milk and meat) through the construction of closed-type farms with year-round stabling of cattle.基础设施支持:
1. Power: 9 MW;项目实施阶段
Proposal需要额外资金
$4M销售地点
Tula Oblast项目总成本
$7M项目目标
Creation of a new production简要描述和想法
Construction of an extraction complex for processing soybean and rapeseed基础设施支持:
1. Power: 14 MW;项目实施阶段
Proposal需要额外资金
$54M销售地点
Tula Oblast项目总成本
$54M项目目标
Creation of a new production简要描述和想法
The project is aimed at building a modern linear elevator with a storage capacity of 100,000 tonnes, including grain cleaning and drying equipment. The maximum investment amount is $4.05 million. The project is expected to create 45 employment placements.基础设施支持:
1. Power: 10 MW;项目实施阶段
Proposal需要额外资金
$4M销售地点
Tula Oblast项目总成本
$4M项目目标
Creation of a new production简要描述和想法
Construction of a sugar beet processing complex基础设施支持:
1. Power: 8 MW;项目实施阶段
Proposal需要额外资金
$11M销售地点
Tula Oblast项目总成本
$11M项目目标
Creation of a new production简要描述和想法
Construction of a horticultural processing complex.基础设施支持:
1. Power: 2 MW;项目实施阶段
Proposal需要额外资金
$55,4M销售地点
Tula Oblast项目总成本
$55,4M项目目标
Creation of a new production简要描述和想法
An international congress and exhibition complex, a children's educational and entertainment center "Park of Impressions", two hotels (four and three stars), a shopping center, an office center, logistics and recreational facilities基础设施支持:
1. Power: 32,93 MW required;项目实施阶段
Proposal需要额外资金
$676M销售地点
Moscow Oblast项目总成本
$676M项目目标
Creation of a new production简要描述和想法
An enterprise for the manufactoring of products based on surfactants is being created. The main products are detergents and cleaning products, laundry and toilet soap, personal hygiene products.基础设施支持:
1. Power: 20 MW;实施期间
16 months项目实施阶段
Proposal需要额外资金
$6M销售地点
Ivanov Oblast项目总成本
$6M项目目标
Creation of a new production简要描述和想法
The production of urea (urea) is a chemical compound, carbonic acid diamide. White crystals, soluble in polar solvents (water, ethanol, liquid ammonia).基础设施支持:
1. Power: 60 MW;项目实施阶段
Proposal需要额外资金
$270M销售地点
Tula Oblast项目总成本
$270M项目目标
Creation of a new production简要描述和想法
Creation of small-tonnage chemical production of components for high-tech polymer composite materials. Production of phthalonitriles. Binders based on phthalonitrile resins.基础设施支持:
1. Power: 100 MW;项目实施阶段
Proposal需要额外资金
$2M销售地点
Tula Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
Plant for the production of plastics using natural or synthetic polymers.基础设施支持:
1. Power: 50 MW;项目实施阶段
Proposal需要额外资金
$20M销售地点
Tula Oblast项目总成本
$20M项目目标
Creation of a new production简要描述和想法
Production of monoethylene glycol MEG-300基础设施支持:
1. Power: 30 MW;项目实施阶段
Proposal需要额外资金
$381M销售地点
Tula Oblast项目总成本
$381M项目目标
Creation of a new production简要描述和想法
Construction of a theme park on a 17,000 sq m land area. Estimated number of visits - 200 people/day.基础设施支持:
The area of the water park is 3000-5000 sq m实施期间
12 months项目实施阶段
Proposal需要额外资金
$12M销售地点
Kaluga Oblast项目总成本
$12M项目目标
Creation of a new production简要描述和想法
Creation of a modern multifunctional entertainment and business center on the basis of the buildings of the frozen Voronezh Heat Supply Nuclear Power Plant.项目实施阶段
Proposal需要额外资金
$3M销售地点
Voronezh Oblast项目总成本
$3M项目目标
Creation of a new production简要描述和想法
Construction of a methanol plant基础设施支持:
1. Power: 60 MW;项目实施阶段
Proposal需要额外资金
$252M销售地点
Tula Oblast项目总成本
$252M项目目标
Creation of a new production简要描述和想法
The concept for the development of the Domodedovo airport area includes the "Business Tourism Centre" project, and as part of it, the construction of congress and exhibition facilities, hotel, retail, and entertainment infrastructure.基础设施支持:
1. The nearest federal highway: M-4 "Don Highway", A-105, A-107, M-2项目实施阶段
Proposal需要额外资金
$5,1B销售地点
Moscow Oblast项目总成本
$5,1B项目目标
Creation of a new production简要描述和想法
The implementation of the water health-resort SPA complex project will increase the load on the existing facilities of the hospitality industry; new sites of tourist interest will be created, localized in one area in proximity to the urban agglomeration, the international airport, and the M-4 "Don" highway.项目实施阶段
Proposal需要额外资金
$135M销售地点
Voronezh Oblast项目总成本
$135M项目目标
7,2 years简要描述和想法
The creation of a multifunctional five-star hotel complex.项目实施阶段
Proposal需要额外资金
$20,3M销售地点
Tula Oblast项目总成本
$20,3M项目目标
Creation of a new production简要描述和想法
Creation of a recreational zone with a shopping and entertainment center, a theme park, a creative cluster, and a hotel next to the rapidly developing "Novoye Stupino" neighborhood and the special economic zone "Stupino Kvadrat".基础设施支持:
1. Power: MW, at the border;实施期间
24 months项目实施阶段
Proposal需要额外资金
$92M销售地点
Moscow Oblast项目总成本
$11M项目目标
Creation of a new production简要描述和想法
The hotel is part of the developing infrastructure of the Sorochany ski resort in the Dmitrovsky district. There are four floors, plus a basement floor. The number of rooms is 78, including 11 superior rooms; the rest are standard. The maximum capacity is 167 people. The hotel is open 24 hours a day, all year round.基础设施支持:
1. Power: MW; 10 kV own independent transmission line, provides full power supply to the resort;项目实施阶段
Proposal需要额外资金
$5M销售地点
Moscow Oblast项目总成本
$5M简要描述和想法
Restoration of a cultural heritage site with adaptation to the chosen function of the site.基础设施支持:
1. Power: available;项目实施阶段
Proposal需要额外资金
$2M销售地点
Moscow Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
A high-class, all-season, "Zoo-Safari" style, "Animals of Russia and the World" family resort in a complex with unique:实施期间
27 months项目实施阶段
Proposal需要额外资金
$16,4M销售地点
Moscow Oblast, Chekhov district, Meshcherskoye area项目总成本
$16,4M项目目标
Creation of a new production简要描述和想法
The purpose of the project is the reconstruction of the manor into a historic house museum to rent the premises for habitation. Taking into account the current tourist flow in the region and the proximity of the Moscow Oblast, the expected number of visitors is at least 20,000 people per year.基础设施支持:
1. Power: available;实施期间
33 months项目实施阶段
Proposal需要额外资金
$2M销售地点
Kaluga Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
Renovation of the manor实施期间
12 months项目实施阶段
Proposal需要额外资金
$2M销售地点
Kaluga Oblast项目总成本
$2M项目目标
Creation of a new production简要描述和想法
Establishment of the production of high-pressure composite cylinders.基础设施支持:
1. Power, MW: 100,项目实施阶段
Proposal需要额外资金
$41M销售地点
Tula Oblast项目总成本
$41M项目目标
Creation of a new production简要描述和想法
Construction of a complex for the production of nitric acid with a capacity of 270 thousand tons per year and ammonium nitrate with a capacity of 340 thousand tons per year.基础设施支持:
1. Power, MW: 20,项目实施阶段
Proposal需要额外资金
$93M销售地点
Tula Oblast项目总成本
$93M项目目标
Creation of a new production简要描述和想法
Construction of an ammonia production complex with a capacity of 525 thousand tons per year and carbamide with an output of 700 thousand tons per year.基础设施支持:
1. Power, MW: 15,项目实施阶段
Proposal需要额外资金
$551M销售地点
Tula Oblast项目总成本
$551M项目目标
Creation of a new production简要描述和想法
Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms. The concept of the project aims to preserve the area and, at the same time, create a comfortable setting for outdoor recreation at all times of the year.基础设施支持:
1. Power: 9 MW;项目实施阶段
Proposal需要额外资金
$13,5M销售地点
Tula Oblast项目总成本
$23M项目目标
Creation of a new production简要描述和想法
The complex of ammonia and carbamide AMKAR-1400, manufacturing productivity estimates 3000 tons of ammonia and 4200 tons of carbamide per day. The project is directed at increasing the export capacity of Tula Oblast, production release with higher added value cost.基础设施支持:
1. Power, MW: 25;项目实施阶段
Proposal需要额外资金
$847M销售地点
Tula Oblast项目总成本
$847M项目目标
Creation of a new production简要描述和想法
Creation of a "car camping area": an equipped summer camp for car tourists with places for setting up tents or lightweight houses, parking lots (in the shared parking area or directly at the accommodation), and restrooms.基础设施支持:
1. Power: 6 MW;项目实施阶段
Proposal需要额外资金
$5,4M销售地点
Tula Oblast项目总成本
$12,1M项目目标
Creation of a new production简要描述和想法
The reconstruction of the health resort complex Sanatorium "Krainka" involves the modernisation of infrastructure, improvement of accommodation facilities, improvement of the adjoining territory, and an increase of the number of available accommodation places.基础设施支持:
1. Power: 8 MW;项目实施阶段
Proposal需要额外资金
$13,5M销售地点
Tula Oblast项目总成本
$13,5M项目目标
Creation of a new production简要描述和想法
Construction of a 150-bed 2 or 3-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".基础设施支持:
1. Power: 3 MW;项目实施阶段
Proposal需要额外资金
$8,1M销售地点
Tula Oblast项目总成本
$8,1M项目目标
Creation of a new production简要描述和想法
Construction of a 750-bed 5-star hotel belonging to one of the federal chains "Azimut Hotels" or "Accor Hotels".基础设施支持:
1. Power: 6 MW;项目实施阶段
Proposal需要额外资金
$40,5M销售地点
Tula Oblast项目总成本
$40,5M项目目标
Creation of a new production简要描述和想法
Creation of infrastructure for food, accommodation and active recreation with a year-round stay.基础设施支持:
1. The nearest federal highway: M-3, 7 km.实施期间
16 months项目实施阶段
Proposal需要额外资金
$1,3M销售地点
Kaluga Oblast项目总成本
$1,3M项目目标
Creation of a new production简要描述和想法
The aim of the project is to build the amusement park consisting of 31 attractions outdoors and 20 attractions in a Family Entertainment Center, with walking areas along the embankment (rivers flow along the site) and inside the park. A shopping mall with gift shop and food court restaurants, as well as hotel complexes, are also planned.基础设施支持:
1. Water: 10401 m3/h;项目实施阶段
Proposal需要额外资金
$149M销售地点
Moscow Oblast项目总成本
$149M项目目标
Creation of a new production简要描述和想法
An enterprise for the production of geotextiles.基础设施支持:
1. Power: 8 MW;实施期间
18 months项目实施阶段
Proposal需要额外资金
$32M销售地点
Ivanovo Oblast项目总成本
$32M项目目标
Creation of a new production简要描述和想法
Construction of a factory for the production of sanitary ware products from raw materials extracted in the Ulyanovsk region. The main products are sanitary ware made of ceramic masses.实施期间
12 months项目实施阶段
Proposal需要额外资金
$30M销售地点
Kaluga Oblast项目总成本
$30M项目目标
Creation of a new production简要描述和想法
Construction of a factory for the production of finished dosage forms. The number of jobs created is 225.基础设施支持:
1. Power: on request;实施期间
18 months项目实施阶段
Proposal需要额外资金
$38M销售地点
Kaluga Oblast项目总成本
$38M项目目标
Creation of a new production简要描述和想法
Creation of an enterprise for the mini excavator's production.基础设施支持:
1. Power: 10 MW;实施期间
4 months项目实施阶段
Proposal需要额外资金
$1,6M销售地点
Ivanovo Oblast项目总成本
$1,6M项目目标
Creation of a new production简要描述和想法
The project provides for the construction of a factory for the production of automotive components for Volkswagen, Skoda, Volvo, Renault, Mitsubishi car brands.基础设施支持:
1. Power: on request;实施期间
12 months项目实施阶段
Proposal需要额外资金
$18M销售地点
Kaluga Oblast项目总成本
$18M项目目标
Creation of a new production简要描述和想法
Creation and development of a modern timber industry enterprise - a woodworking factory. The project involves the construction of a woodworking plant, the purchase of equipment, logging equipment and logging transport.项目实施阶段
Proposal需要额外资金
$9,4M销售地点
Tver Oblast项目总成本
$9,4M项目目标
Creation of a new production简要描述和想法
Construction of a factory for the production of MDF boards with a capacity of 400,000 m3/year using modern technologies and equipment.基础设施支持:
1. Power: 250 MW and 4,934 MW;实施期间
18 months项目实施阶段
Proposal需要额外资金
$33M销售地点
Kostroma Oblast项目总成本
$33M项目目标
Creation of a new production简要描述和想法
The main goal of the project is to create a new production facility equipped with modern, energy-efficient devices to make a profit through the sale of manufactured products: steel grinding balls with a diameter of 30-100 mm.基础设施支持:
1. Power: 13 MW;实施期间
16 months项目实施阶段
Proposal需要额外资金
$14M销售地点
Vladimir Oblast项目总成本
$14M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of cast iron and steel: plumbing casting (plumbing and accessories), accessories for anchor-rail fastening, artistic casting.基础设施支持:
1. Power: on request;实施期间
24 months项目实施阶段
Proposal需要额外资金
$432M销售地点
Kaluga Oblast项目总成本
$432M项目目标
Creation of a new production简要描述和想法
Construction of a plant for the production of radio and mobile communications.基础设施支持:
1. Power: on request;项目实施阶段
Proposal需要额外资金
$76M销售地点
Kaluga Oblast项目总成本
$76M项目目标
Creation of a new production简要描述和想法
The project is aimed at the construction of a thermoforming plant for products.基础设施支持:
1. Power: on request;实施期间
11 months项目实施阶段
Proposal需要额外资金
$2M销售地点
Kaluga Oblast项目总成本
$2M